Amendment 0001 Final.pdf
PDF 445 KB Posted
- Attached to
- DLA Building 54 Navy Artifact Restoration Federal contract opportunity
- Solicitation number
- W9123622B2041
About this file
This document is an amendment to a solicitation for the renovation of Building 54 at the Defense Supply Center Richmond in Virginia. The solicitation seeks bids for labor, materials, and equipment to construct a new HVAC system, alter the existing electrical system, and make improvements to the building envelope, fire protection, and addition of a generator.
The amendment provides updates and clarifications to the solicitation. A second site visit is scheduled for January 19th and DoD SAFE uploads are extended to January 27th. The bid opening date is moved to January 28th and a new wage determination is included. Electronic bid submission through DoD SAFE is required by the new deadline. The solicitation is a 100% small business set-aside to be awarded to the lowest responsive and responsible bidder.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W9123622B2041 Renovation of Building 54 Navy Artifact (Construction) Defense Supply Center Richmond (DSCR), Virginia is hereby amended as follow s:
1. A Second Site VIsit is scheduled for 19 January 2022 at 10:00.
2. DoDSAFE uploads w ill be extended to 27 January 2022.
3. Bid Opening w ill be extended to 28 January 2022.
4. Wage determination updated.
Please see admendment for further details of these changes.
Contracting POC: Allen Scott Brainerd: 757-201-7668 Email: allen.s.brainerd@usace.army.mil CC'd dianne.k.grimes@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123622B2041
X 9B. DATED (SEE ITEM 11)
07-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jan-2022
CODE
USACE NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123622B2041
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 20-Jan-2022 01:00 PM to 20-Jan-7022 01:00 PM.
The Issued By organization has changed from
USACE, NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
to
USACE NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
INSTRUCTIONS TO BIDDERS
1. DESCRIPTION OF PROJECT
The subject project will provide labor, material, and equipment to construct an energy efficient HVAC mechanical system to condition Building 54 Navy Artifact Restoration rooms. Work includes removal of the existing mechanical system and installation of a separate packaged and ducted dehumidifier to provide dehumidification to meet space humidity level requirements. In addition, work includes alterations to the existing electrical system to serve new HVAC equipment, building envelope improvements, fire protection modifications, and the addition of a generator. Contractor will provide Test, Adjustment and Balance (TAB) work for the new systems and provide electrical connections to support new HVAC equipment within the mechanical room.
2. MAGINITUDE OF CONSTRUCTION
The magnitude of construction is between, $1,000,000 and $5,000,000 per FAR 36.204.
3. SOCIO ECONOMIC STATUS VALIDATION
This is a 100% Small Business Set-Aside IFB, in order to verify the bidder’s socio-economic status, the System for Award Management (SAM) website will be used to verify.
Bidders must represent that they are a Small Business.
If you are submitting a bid as a Joint Venture (JV) you need to submit your JV Agreement with your bid.
4. FAR 52.204-7 SAM
In accordance with FAR 52.204-7 SAM Registration please ensure that your Unique Identifier Code (Cage Code or DUNS) is on page 1 of your bid in order to be responsive
5. BID SUBMISSION INSTRUCTIONS
The Norfolk District anticipates the possibility that its building will be closed during the time for bid submission due to the evolving requirements arising in response to COVID-19. Accordingly, the Norfolk District will NOT accept bids my mail, hand-carry, or commercial courier (that is, no physical bids will be accepted in response to this solicitation). All bids must be submitted by electronic commerce only (that is, by submission via DoD SAFE, as discussed below, only).
Electronic Bid Submission in DoD SAFE:
In accordance with (IAW) FAR 52.214-7, Late Submissions, Modifications, and Withdrawals of bids, all bids must be received at the initial point of entry to the Government infrastructure not later than the date and time specified in Block 13 of the solicitation.
Bids will be submitted through DoD Secure Access File Exchange (DoD SAFE) via https://safe.apps.mil/. DoD SAFE is the Government infrastructure utilized to secure bids and IAW FAR 14.202-8, citing FAR 4.5, and as limited by the requirements of the AFARS 5104.502-90. The bid submission shall provide signed bid to include SF 1442 and SF 30 acknowledgements of all amendments.
All proposals must be uploaded into DoD SAFE infrastructure not earlier than 14 January 2022 21 January 2022 and not later than the date/time specified in Block 13 of the solicitation. Bidders will require a unique “request code” to upload bids into DoD SAFE, which must be obtained by email only to the following POCs: Allen Scott Brainerd at allen.s.brainerd@usace.army.mil and Dianne Grimes at Dianne.K.Grimes@usace.army.mil and cc’d PPMDContracts@usace.army.mil with your email request. The POCs must receive the mail for the “request code” NLT 1:00 PM (EDT) 19 January 2022 26 January 2022.
A copy of the duly executed bid guarantee must be included in the bid submission upload to DoD SAFE in accordance with FAR 52.228-1 Bid Guarantee. A physical copy of the bid guarantee in proper form must be submitted within seventy-two (72) hours to the Government upon request from the apparent low bidder.
The BIDDER IS SOLELY RESPONSIBLE for ensuring that the entire proposal has been received into DoD SAFE with a timestamp of not later than the date and time specified in Block 13 of the solicitation. Bidders are STRONGLY encouraged to avoid waiting until the last minute to attempt to transmit their proposals. The electronic bid submittal contents shall conform to the details of the solicitation and subsequent amendments.
Bidders are responsible for ensuring that their electronic bids are virus-free and shall run an anti-virus scan before uploading into DoD SAFE. Electronic bids shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite (Excel and Project) 2010. The electronic bids shall be in Adobe Acrobat (except for Microsoft and Excel documents) portable document file (pdf) searchable text format. Electronic bids shall be clearly identified for each section and item as detailed in the solicitation. IT IS THE BIDDER’S RESPONSIBILITY TO OBTAIN WRITTEN CONFIRMATION OF RECEIPT OF ALL ELECTRONIC FILES OF THE BID SUBMITTED INTO DOD SAFE. Please forward a copy of this confirmation receipt to POC: Allen Scott Brainerd at allen.s.brainerd@usace.army.mil and copy Dianne.K.Grimes@usace.army.mil and PPMDContracts@usace.army.mil.
Please be advised that in accordance with FAR Deviation 2020-O0016, Class Deviation – Original Documents, Signatures, Seals and Notarizations, Electronic signatures and electronic mechanically-applied or printed dates may be used and shall be considered original signatures and dates, without regard to the order in which they are affixed for all of part 28, as required by the solicitation.
The solicitation hereby incorporates Deviation 2020-O0016 to FAR 28.106-1. For any bid bond, performance bond, or payment bond that may be required under this procurement, a seal is not required. In the event of conflict in another provision in the solicitation, the Deviation will control.
Any questions regarding bid submission should be directed to Mr. Allen Scott Brainerd in ProjNet.
6. BID OPENING
There will be a bid opening conducted by the Government via teleconference on 21 January 2022 27 January 2022, at 1:00 PM (EDT) for participating bidders. The teleconference phone number and access codes will be emailed to participants once bid submission due date and time have lapsed. Bidders will be able to participate in the reading of the bids through this teleconference.
In the event the Norfolk District building is closed at the time of bid opening, a bid abstract containing bid results will be distributed to participating bidders within twenty-fours (24) hours of the bid opening. Upon request, the Norfolk District will make the opened bids available for examination.
7. BIDDERS QUESTIONS AND COMMENTS
All questions and/or comments for this solicitation should be submitted through the bidder inquiry system, ProjNet, as shown below. All submitted questions will be responded to via ProjNet and an amendment issued prior to the solicitation closing date. ProjNet will close 10 days prior to the solicitation closing date.
Submitting a bidder inquiry:
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9123621B2041 The Bidder Inquiry Key is JI2I4G-2XX857
The Bidder Inquiry System will be unavailable for new inquires 10 days prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Bidders are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
8. AWARD TO RESPONSIBLE BIDDER
Responsibility will be determined, prior to award, by the Contracting Officer, either by performing a pre-award survey or conclusions based on a previous pre-award survey and/or any performance data available. A pre-award survey maybe performed in determining the bidder’s responsibility in accordance with FAR 9.104 and 9.106. The bidder will be required to show that he has the necessary capital, experience, and owns or can procure the necessary plant or other resources to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified. If the bidder is unable to comply with the request for pre-award survey, the bidder will no longer be considered for award.
To be determined responsible, a bidder must:
a) Have adequate financial resources to perform the contract, or the ability to obtain them.
b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
c) Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history.
d) Have a satisfactory record of integrity and business ethics.
e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.
g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
Additionally, in accordance with FAR Part 9.1, prior to awarding a contract, the Government will conduct a Responsibility Determination of the firm selected for award. The below information will be requested of the apparent low bidder. This information is not required to be responsive to the Invitation for Bid. To efficiently and expeditious award the resultant contract, it is HIGHLY recommended that bidders provide the below information with their bid. If bidders wish to shield this information from public view at the bid opening, the information may be placed in an envelope with the following legend:
PRE-AWARD SURVEY INFORMATION
SOLICITATION NO. W91236-21-B-2041
This information is not required to be responsive to the Invitation for Bid.
a) Current commitments and expected dates of completion.
b) One (1) signed bank reference demonstrating adequate financial resources. If bidder’s firm has a line of credit – provide information on how many figures bidder can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
c) The bidder shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder.
9. EVIDENCE OF AUTHORITY TO SIGN BIDS
Evidence of the authority of individuals signing offers to submit firm offers on behalf of the offeror is required except where the offer is signed, and shows that it is so signed, by: the President, Vice-President, or Secretary of an incorporated offeror; a partner in the case of a partnership; or the owner in the case of a sole proprietorship. Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive
10. PRE-AWARD SAFETY CONFERENCE
Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding this compliance with any safety or accident prevention requirement, such bidder, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reason for their occurrence, and measures which will be taken to preclude any recurrence thereof.
Information elicited at this conference will be used by the Contracting Officer, in conjunction with other information obtained in a pre-award survey, in determining the bidder’s responsibility.
The items discussed, the preventive measures considered, and any conclusions reached in this conference shall be recorded in minutes of the meeting, which shall be authenticated by the signatures of representatives of the bidder and the Contracting Officer, and any procedures noted therein as agreed upon shall become an obligation of the bidder, along with all other safety and accident prevention requirements of the contract, if award is made to him.
11. INSPECTION OF THE SITE
Prospective bidders are invited to visit the site of the work in order to acquaint themselves as to site conditions and other problems incident to the prosecution of the work. Arrangements for inspection of the site are identified in the clause 52.236-27, entitled "SITE VISIT (CONSTRUCTION)."
12. BASIS OF AWARD
All blanks must be filled in by the bidder. (In order for the bidder to be considered responsive all CLINS must provide pricing in order to be considered. A single award will be made to the lowest responsible, responsive bidder on the basis of the total bid price. Prior to making an award, a pre-award survey will be made and the low bidder will be required to show that they have the necessary capital, experience, and owns or can procure the necessary plant to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified.
13. INCURING COSTS
The Government is not liable for any costs incurred by the bidder submitting a bid in response to this solicitation.
14. AGENTS
Bids signed by an Agent must be made in the name of the Principal and must be accompanied by evidence of said Agent’s authority to act on behalf of its Principal
15. UNBALANCED BIDS
Any bid which is materially unbalanced as to prices for the contract line items may be rejected as non-responsive or otherwise not considered for award. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
16. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- 05 January 2022 at 10:00am 19 January 2022 at 10:00am
(c) Participants will meet at-- Building 54 Parking Lot across from the Helipad.
POC is Christa Goodman, christa.j.goodman@usace.army.mil
**In addition, all participates must send their Name of Organization, Participates Full Name, Make, Model, Color of Vehicle Arriving In/Traveling In. Participates must submit all their information to Christa Goodman at Christa.J.Goodman@usace.army.mil NLT Thursday, 30 December 2021 17 January 2022. The day pass will be picked up at the Visitors Center on the day of the site visit. Participates are encouraged to arrive at least 15 minutes prior to the start of the Site Visit.
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by full text:
WAGE DETERMINATION 7 JAN 2022
"General Decision Number: VA20220017 01/07/2022
Superseded General Decision Number: VA20210017
State: Virginia
Construction Type: Building
County: Chesterfield County in Virginia.
Includes the independent city of Colonial Heights*
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at ww.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022
ASBE0024-006 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)...................... $ 39.27 18.67+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
* BOIL0045-003 01/01/2021
Rates Fringes
BOILERMAKER...................... $ 42.62 24.81
ELEC0666-004 03/01/2021
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring).................. $ 32.44 50.45%
ELEV0051-007 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................ $ 43.55 35.825+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving and Christmas Day.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0147-019 11/01/2013
Rates Fringes
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100ft. above ground............ $ 28.30 8.69%+8.15 Cranes under 90 tons........ $ 27.38 8.69%+8.15
IRON0079-012 05/01/2021
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL....................... $ 26.63 16.67
PLUM0010-003 09/01/2021
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations) .......... $ 31.50 17.92
PLUMBER.......................... $ 31.50 17.92
SUVA2013-031 01/11/2016
Rates Fringes
BRICKLAYER....................... $ 20.00 1.00
CARPENTER........................ $ 21.10 1.11
CEMENT MASON/CONCRETE FINISHER... $ 17.23 0.00
GLAZIER.......................... $ 18.43 3.71
HVAC MECHANIC (HVAC Duct Installation Only)..............$ 20.60 2.93
IRONWORKER, REINFORCING.......... $ 27.18 4.13
LABORER: Common or General...... $ 11.85 1.75
LABORER: Mason Tender - Brick... $ 13.41 3.15
LABORER: Mason Tender - Cement/Concrete.................. $ 12.96 3.12
LABORER: Pipelayer.............. $ 12.28 1.96
OPERATOR:
Backhoe/Excavator/Trackhoe....... $ 19.74 1.43
OPERATOR: Bobcat/Skid Steer/Skid Loader................ $ 18.95 4.03
OPERATOR: Bulldozer............. $ 17.50 0.00
OPERATOR: Forklift.............. $ 19.40 7.00
OPERATOR: Loader................ $ 21.28 3.17
OPERATOR: Roller................ $ 16.25 4.88
PAINTER (Brush and Roller)....... $ 16.87 0.00
PAINTER: Spray.................. $ 16.58 0.00
ROOFER........................... $ 17.40 1.55
SHEET METAL WORKER, Excludes HVAC Duct Installation........... $ 19.72 1.83
SPRINKLER FITTER (Fire Sprinklers)...................... $ 20.50 2.93
TILE FINISHER.................... $ 23.40 0.00
TILE SETTER...................... $ 27.80 10.25
TRUCK DRIVER: Dump Truck........ $ 14.88 0.00
WATERPROOFER..................... $ 21.17 3.41
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH- 0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
The following have been deleted:
WAGE DETERMINATION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .