This document provides an amendment to a solicitation for construction services at the Air Force Targeting Center located at Langley Air Force Base in Hampton, Virginia.

The amendment revises the plans and specifications for the project, replacing them with updated versions. The project will construct a new facility to support the 25th Air Force's targeting mission in accordance with Department of Defense and Air Force standards. Services required include construction of the targeting center building utilizing conventional methods, along with related site work, utilities, generators, and parking facilities. The facility must meet DoD antiterrorism standards and be designed for permanent use following high performance building criteria. The Army Corps of Engineers Engineering District Norfolk is the contracting agency responsible for award and administration.

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Targeting Center, Langley AFB - Solicitation, newest first.
File Type Posted
W9123621R2005 Amendment 0008.pdf PDF
Specs_V1_Revsied_00 00 00_TOC.pdf PDF
Vol.1B_Revised_Sheet A-313 - EXTERIOR WALL SECTIONS.pdf PDF
Specs_V2_Revised_10 22 19.pdf PDF
Specs_V1_Revised_02 60 00.pdf PDF
Specs_V2_Revised_08 71 00.pdf PDF
Vol.1A_Revised_Sheet CD-102 DEMOLITION PLAN.pdf PDF
Specs_V1_Revised_01 33 00.00 50.pdf PDF
W9123621R2005 0007.pdf PDF
Vol.1B_Revised_Sheet A-602 - DOOR SCHEDULE - LEVEL 2.pdf PDF
Vol.1B_Revised_Sheet A-601 - DOOR SCHEDULE - LEVEL 1.pdf PDF
Specs_V1_Revised_00 00 00_TOC.pdf PDF
Specs_V2_Revised_08 81 00.pdf PDF
Vol.1B_Revised_Sheet IN102C - INTERIOR FINISH PLAN - SECOND FLOOR - AREA C.pdf PDF
Vol.1A_Revised_Sheet CG-111 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Langley Furniture Qty.pdf PDF
Vol.1B_Revised_Sheet IN101A - INTERIOR FINISH PLAN - FIRST FLOOR - AREA A.pdf PDF
Vol.1B_Revised_Sheet A-607 - INTERIOR STOREFRONTS - LEVEL 2.pdf PDF
Vol.1B_Revised_Sheet A-521 - DETAILS - INTERIOR - ACOUSTIC & WOOD.pdf PDF
Vol.1A_Revised_Sheet X-002 TRAFFIC DETAILS.pdf PDF
Vol.1A_Revised_Sheet CG-113 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Vol.1A_Revised_Sheet CG-112 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
W9123621R2005 0005.pdf PDF
W9123621R2005 0004.pdf PDF
FINAL_LAFB_TCF_Norfolk_District_USACE_Geotechnical_Report.pdf PDF
20201124_RTA_Specs_V4_Div_26-33_Appendix_Consolidated.pdf PDF
2020RTA_AFTC_Vol.1B.pdf PDF
2020RTA_AFTC_Vol.1A.pdf PDF
2020RTA_AFTC_Vol.2.pdf PDF
20201124_RTA_Specs_V3_Div_21-25_Consolidated.pdf PDF
20201124_RTA_Specs_V1_Div_00-06_Consolidated.pdf PDF
W9123621R20050002.pdf PDF
A.02.01 Amendment 0001 Solicitation 21R2005_released.pdf PDF
B.02.09 Att. 2 Company Specialized Experience.pdf PDF
B.02.09 Att. 7 Small Business Participation Plan.pdf PDF
20191115_AFTC_IFC_Vol.1A (Full Scale).pdf PDF
20191115_IFC_Specs_V2_Div_07-14.pdf PDF
20191115_IFC_Specs_V4_Div_26-33_Appendix.pdf PDF
20191115_IFC_Specs_V1_Div_00-06.pdf PDF
JBLE-Langley AF TCF - NTCRA ESS Construction Support (20181115) DRAFT.pdf PDF
20190411_Furniture_specification_package_Amendment_2 (1).pdf PDF
B.02.09 Att. 3 Past Performance Questionaire.pdf PDF
B.02.09 Att. 5 Letter of Commitment Sample.pdf PDF
B.02.09 Att. 6 Small Business Subcontracting Record.pdf PDF
20191115_AFTC_IFC_Vol.1B.pdf PDF
20191115_AFTC_IFC_Vol.2.pdf PDF
A.02.01 Solicitation W9123621R2005_released 11.03.2020.pdf PDF
B.02.09 Att. 1 Proposal Data Sheet.pdf PDF
B.02.09 Att. 4 Telephone Interview Questionnaire (For Government Use Only).pdf PDF
B.02.09 Att. 8 CLIN Schedule.pdf PDF
Show all 50

Air Force Targeting Center, Langley AFB - Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W9123621R2005 Air Force Targeting Center, Joint Base Langley-Eustis, Hampton VA is hereby amended as follow s:

1. The Plans and Specs are revised, and the revised versions are provided in clause 252.236-7001, Contract Draw ings and Specifications.

The Revised Plans and Specs attachments are uploaded in beta.SAM.

Please see the continuation page for full amendment breakout.

Contracting POC: Axel Doody 757-201-7712 Axel.F.Doody@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Nov-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621R2005

X 9B. DATED (SEE ITEM 11)

03-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Nov-2020

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621R2005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

PLANS:

1. 20191115_AFTC_IFC_Vol.1A (Full Scale) 1. 2020RTA_AFTC_Vol.1A

2. 20191115_AFTC_IFC_Vol.1B 2. 2020RTA_AFTC_Vol.1B

3. 20191115_AFTC_IFC_Vol.2 3. 2020RTA_AFTC_Vol.2

SPECS:

4. 20191115_IFC_Specs_V1_Div_00-06 4. 20201124_RTA_Specs_V1_Div_00-06_Consolidated

5. 20191115_IFC_Specs_V2_Div_07-14 5. 20201124_RTA_Specs_V2_Div_07-14_Consolidated

6. 20191115_IFC_Specs_V3_Div_21-25 6. 20201124_RTA_Specs_V3_Div_21-25_Consolidated

7. 20191115_IFC_Specs_V4_Div_26-33_Appendix

7. 20201124_RTA_Specs_V4_Div_26-33_Appendix_Consolidated

8. 20190411_Furniture_specification_package_Amendment_2 (1)

W9123621R2005

9. JBLE-Langley AF TCF - NTCRA ESS Construction Support (20181115) DRAFT

(End of clause)

(End of Summary of Changes)