Vol.1A_Revised_Sheet CD-102 DEMOLITION PLAN.pdf
PDF 422 KB Posted
- Attached to
- Air Force Targeting Center, Langley AFB - Solicitation Federal contract opportunity
- Solicitation number
- W9123621R2005
About this file
This document package includes a demolition plan sheet and related federal contract solicitation. The demolition plan sheet outlines the scope of demolition work required at the Langley Air Force Base Targeting Facility in Virginia. Utilities to be protected, removed, and lines to be abandoned are clearly marked. Areas of possible unexploded ordnances and munitions discovery are noted.
The related federal contract solicitation seeks demolition and construction services for a new Air Force Targeting Center Facility at Langley Air Force Base. The project includes construction of a new facility to support intelligence, surveillance, and reconnaissance operations for the United States Air Force. The facility must be designed to Department of Defense, Air Force, and local standards. Ancillary facilities like emergency generators and site improvements are also within the scope. The soliciting agency is the Department of the Army Corps of Engineers Norfolk District.
View the file
Other files for this federal contract opportunity
Show all 50
Air Force Targeting Center, Langley AFB - Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
D
D
D
G
W
E
H
H
E
H
H
E
E
T R
T R
T R
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
COMM
COMM
COMM
C O
M M
CO
M
M
COMM
C O
M M
C O
M M
COMM
COMM
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
3-AF HIGH VOLTAGE
CABLES (DATUR).
SEE NOTE 1, SHEET
V-102
110 kV NASA ELECTRIC
LINE (DATUR). SEE
NOTE 1, SHEET V-102
NASA
COMMUNICATION
LINE (DATUR). SEE
NOTE 1, SHEET V-102
3-AF HIGH VOLTAGE
CABLES (DATUR).
SEE NOTE 1,
SHEET V-102
AF 35 kv ELECTRIC
TRACED 3 CABLES
(DATUR). SEE NOTE 1,
SHEET V-102
22 kV NASA ELECTRIC
LINE (DATUR). SEE
NOTE 1, SHEET V-102
AF TELE CABLE
(FIBER OPTIC) DIRECT
BURIED (DATUR) SEE
NOTE 1, SHEET V-102
AF 35 kv ELECTRIC
TRACED 3 CABLES
(DATUR). SEE NOTE 1,
SHEET V-102
5A (CONTROL
CA) (DATUR).
SEE NOTE 1,
SHEET V-102
22 kV NASA
ELECTRIC
LINE (DATUR).
SEE NOTE 1,
SHEET V-102
5A (CONTROL
CA) (DATUR).
SEE NOTE 1,
SHEET V-102
X
X
X
SEE NOTE 2
MRA BOUNDARY
SEE NOTE 4
MRA BOUNDARY
SEE NOTE 4
SEE NOTE 3
MRS BOUNDARY
SEE NOTE 6
MRS BOUNDARY
SEE NOTE 6
MRS BOUNDARY
SEE NOTE 6
LEGEND
DEMO CURB
DEMO MEDIAN ISLANDS
REMOVE ABANDONED WATERLINE
REMOVE COMM. HANDHOLE
REMOVE SITE LIGHTING
PROTECT UTILITY DURING CONSTRUCTION
REMOVE COMM. CONDUIT (WIRES
TO BE REMOVED BY OTHERS)
X
REMOVE ELECTRIC LINE AND
HANDHOLES
9 REMOVE EXISTING ELECTRIC TRANSFORMER.
DISCONNECT INCOMING ELECTRIC LINE AND REMOVE
TO THE NEAREST TRANSFORMER.
DEMO EXISTING PAVEMENT
EXISTING UTILITY LINE TO BE REMOVED
DEMO EXISTING SIDEWALK
STORM STRUCTURE TO BE REMOVED
STORM PIPE TO BE REMOVED
TREE REMOVAL
LIMITS OF DISTURBANCE (APPROX. 11.78 AC)
REMOVE EXISTING HEADWALL10
REMOVE EXISTING COMM. CONDUIT AND WIRES11
REMOVE EXISTING SANITARY LINE12
13 REMOVE WATER LINE TO THE LIMITS OF DISTURBANCE.
CAP WATER LINE AT THE LIMITS OF DISTURBANCE.
CAP ABANDONED SANITARY FORCE MAIN. SEE NOTE 5.
US Army Corps of Engineers ®
SHEET OF
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
C T
N
O
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R I P
T I O
N
U S
A
R M
Y
C
O R
P S
F
E
G
I N
E E
R S
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
A A
M E
N D
M E
12/22/2020 11:49 AM
Thumar
T:\188821A_Langley_Targeting\CAD_BIM\_Sheets\10059580-CD-102.dwg
READY TO ADVERTISE (RTA)
CD102
MAIN BLDG.
9 52
L A
N G
L E
Y
A
F B
V
I R
G I N
I A
L A
N G
L E
Y
A
I R
F
R
C E
R
G E
T I N
G
F
A C
I L I T
Y
D E
M O
L I T
I O
N
P
L A
N
H D
R
I N
C
W
A S
H I N
G T
O N
A R
L I N
G T
O N
V
A
R
T
H U
M A
B
T
R E
A C
Y
C
M
O O
R E
C H
R I S
M
O
R E
W R
B L V
D
S
U I T
E
30' 60'0
MATCH LINE SEE SHEET CD101
KEY PLAN
N.T.S.
NOTES:
1. ALL UTILITIES SHALL BE PROTECTED BY THE
CONTRACTOR UNLESS UTILITY IS NOTED TO BE
DEMOLISHED.
2. EXISTING COMMUNICATION LINE HAS BEEN
DETERMINED TO BE ABANDONED. EXISTING LINE TO
REMAIN IN PLACE, UNLESS IN CONFLICT. IF IN
CONFLICT, REMOVE THE EXISTING ABANDONED
LINE.
3. THE CONTRACTOR SHALL NOT DAMAGE THE
EXISTING MONITORING WELL NEAR THE LIMITS OF
DISTURBANCE OF THE PROJECT SITE. THE
CONTRACTOR SHALL PROVIDE MEANS OF
PROTECTION WITHIN A 5-FOOT RADIUS AROUND THE
EXISTING MONITORING WELL SO THAT HEAVY
EQUIPMENT WILL NOT TRAVEL OVER THE EXISTING
MONITORING WELL DURING CONSTRUCTION.
4. MRA BOUNDARY SIGNIFIES THE POTENTIAL
PRESENCE OF UNEXPLODED ORDINANCES.
CAUTION SHALL BE USED DURING CONSTRUCTION
IN THIS AREA. ALL SAFETY REQUIREMENTS AS
SPECIFIED IN THE PROJECT SPECIFICATIONS MUST
BE FOLLOWED.
5. EXISTING 10" AND 4" SANITARY FORCE MAIN TO BE
ABANDONED BY OT`HERS. CONFIRM EXISTING
SANITARY FORCE MAIN HAS BEEN ABANDONED
PRIOR TO REMOVAL.
6. MUNITIONS & EXPLOSIVES DISCOVERY & REMOVAL
SHALL BE PERFORMED WITHIN THE MRS BOUNDARY
AS SPECIFIED IN SPECIFICATION 02 60 00 AND THE
ATTACHED EXPLOSIVE SAFETY SUBMISSION (ESS).
N
A
A
File details come from the government source that posted it. Updated .