Air Force Targeting Center, Langley AFB - Solicitation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123621R2005
Agency
ENDIST Norfolk US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1JZ Construction Of Miscellaneous Buildings
Place of performance
Hampton Va Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks design-build construction services for an Air Force Targeting Center Facility at Joint Base Langley-Eustis in Hampton, Virginia. The Department of the Army Corps of Engineers Norfolk District is procuring these services on behalf of the Air Force to construct a new facility that supports intelligence, surveillance, and reconnaissance operations and provides 24/7 command and control capabilities. Offerors must demonstrate experience on similar projects over $10 million and 20,000 square feet. Proposals will be evaluated on specialized experience, past performance, small business participation plans, and price. Proposals are due by January 7, 2021.

There is no set-aside designation. The primary NAICS code is 2362 and PSC code is S206. The facility must be constructed to Department of Defense and Air Force standards and include site improvements, utilities, generators, parking, and supporting facilities. The period of performance and budget are unspecified, but the place of performance is Joint Base Langley-Eustis in Hampton, Virginia. Incumbents or current contractors are not named.

Notice text

9 versions

Update #9 · Latest ·

01/05/2021 - Amendment 0008 is issued to incorporate an updated wage determination. See attached amendment for details.

12/23/2020 - Amendment 0007 is issued to 1) provide revisions to the Small Business Factor; 2) provide additional clauses; 3) revised drawings and specifications; 4) to incorporate ProjNet responses into the solicitation. See attached amendment and additional attachements for further details.

12/17/2020 - Amendmnet 0006 is issued tor porvide revised drawings,  specifications and an additional attachement titled "Langley Furniture Qty”. See attached amdnement and accomponying attachemnts fror further details.

12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.

11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"  

11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.

11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #8 ·

12/23/2020 - Amendment 0007 is issued to 1) provide revisions to the Small Business Factor; 2) provide additional clauses; 3) revised drawings and specifications; 4) to incorporate ProjNet responses into the solicitation. See attached amendment and additional attachements for further details.

12/17/2020 - Amendmnet 0006 is issued tor porvide revised drawings,  specifications and an additional attachement titled "Langley Furniture Qty”. See attached amdnement and accomponying attachemnts fror further details.

12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.

11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"  

11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.

11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #7 ·

12/17/2020 - Amendmnet 0006 is issued tor porvide revised drawings,  specifications and an additional attachement titled "Langley Furniture Qty”. See attached amdnement and accomponying attachemnts fror further details.

12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.

11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"  

11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.

11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #6 ·

12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.

11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"  

11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.

11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #5 ·

11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"  

11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.

11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #4 ·

11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.

11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #3 ·

11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #2 ·

11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Update #1 ·

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

Attachments

Files attached to this notice, newest first
File Type Posted
W9123621R2005 Amendment 0008.pdf PDF
Vol.1B_Revised_Sheet A-313 - EXTERIOR WALL SECTIONS.pdf PDF
Specs_V2_Revised_10 22 19.pdf PDF
Specs_V1_Revised_02 60 00.pdf PDF
Specs_V2_Revised_08 71 00.pdf PDF
Vol.1A_Revised_Sheet CD-101 DEMOLITION PLAN.pdf PDF
Specs_V1_Revised_Appendix_B_ESS.pdf PDF
Vol.1A_Revised_Sheet CD-102 DEMOLITION PLAN.pdf PDF
Specs_V1_Revised_01 33 00.00 50.pdf PDF
W9123621R2005 0007.pdf PDF
Vol.1B_Revised_Sheet IN102C - INTERIOR FINISH PLAN - SECOND FLOOR - AREA C.pdf PDF
Vol.1A_Revised_Sheet CG-111 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Langley Furniture Qty.pdf PDF
Vol.1B_Revised_Sheet I-001 INTERIOR NOTES AN FINISH LEGEND .pdf PDF
Vol.1B_Revised_Sheet A-411 - ENLARGED PLANS AND ELEVATIONS - SHOWERS AND NURSING ROOM.pdf PDF
Specs_V3_Revised_22 00 00.pdf PDF
W9123621R2005 0006.pdf PDF
Vol.1B_Revised_Sheet IN101A - INTERIOR FINISH PLAN - FIRST FLOOR - AREA A.pdf PDF
Vol.1B_Revised_Sheet A-607 - INTERIOR STOREFRONTS - LEVEL 2.pdf PDF
Vol.1B_Revised_Sheet A-521 - DETAILS - INTERIOR - ACOUSTIC & WOOD.pdf PDF
Vol.1A_Revised_Sheet X-002 TRAFFIC DETAILS.pdf PDF
Vol.1A_Revised_Sheet CG-113 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Vol.1A_Revised_Sheet CG-112 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
W9123621R2005 0005.pdf PDF
W9123621R2005 0004.pdf PDF
FINAL_LAFB_TCF_Norfolk_District_USACE_Geotechnical_Report.pdf PDF
2020RTA_AFTC_Vol.1A.pdf PDF
20201124_RTA_Specs_V2_Div_07-14_Consolidated.pdf PDF
20201124_RTA_Specs_V1_Div_00-06_Consolidated.pdf PDF
Site Visit Roster_AF Targeting Center 21R2005.pdf PDF
W9123621R20050002.pdf PDF
A.02.01 Amendment 0001 Solicitation 21R2005_released.pdf PDF
20190411_Furniture_specification_package_Amendment_2 (1).pdf PDF
A.02.01 Solicitation W9123621R2005_released 11.03.2020.pdf PDF
B.02.09 Att. 1 Proposal Data Sheet.pdf PDF
B.02.09 Att. 4 Telephone Interview Questionnaire (For Government Use Only).pdf PDF
B.02.09 Att. 8 CLIN Schedule.pdf PDF
20191115_IFC_Specs_V3_Div_21-25.pdf PDF
B.02.09 Att. 3 Past Performance Questionaire.pdf PDF
B.02.09 Att. 5 Letter of Commitment Sample.pdf PDF
B.02.09 Att. 6 Small Business Subcontracting Record.pdf PDF
20191115_AFTC_IFC_Vol.1B.pdf PDF
20191115_AFTC_IFC_Vol.2.pdf PDF
B.02.09 Att. 2 Company Specialized Experience.pdf PDF
B.02.09 Att. 7 Small Business Participation Plan.pdf PDF
20191115_AFTC_IFC_Vol.1A (Full Scale).pdf PDF
20191115_IFC_Specs_V2_Div_07-14.pdf PDF
20191115_IFC_Specs_V4_Div_26-33_Appendix.pdf PDF
20191115_IFC_Specs_V1_Div_00-06.pdf PDF
JBLE-Langley AF TCF - NTCRA ESS Construction Support (20181115) DRAFT.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Air Force Targeting Center, Langley AFB - Solicitation Award Award Notice
Air Force Targeting Center, Langley AFB - Solicitation This notice · Latest solicitation Solicitation
Air Force Targeting Center, Langley AFB Pre-Solicitation
Air Force Targeting Center, Langley AFB - Presolicitation Special Notice
Air Force Targeting Center, Langley AFB Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity