Air Force Targeting Center, Langley AFB - Solicitation
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123621R2005
- Agency
- ENDIST Norfolk US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Hampton Va Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks design-build construction services for an Air Force Targeting Center Facility at Joint Base Langley-Eustis in Hampton, Virginia. The Department of the Army Corps of Engineers Norfolk District is procuring these services on behalf of the Air Force to construct a new facility that supports intelligence, surveillance, and reconnaissance operations and provides 24/7 command and control capabilities. Offerors must demonstrate experience on similar projects over $10 million and 20,000 square feet. Proposals will be evaluated on specialized experience, past performance, small business participation plans, and price. Proposals are due by January 7, 2021.
There is no set-aside designation. The primary NAICS code is 2362 and PSC code is S206. The facility must be constructed to Department of Defense and Air Force standards and include site improvements, utilities, generators, parking, and supporting facilities. The period of performance and budget are unspecified, but the place of performance is Joint Base Langley-Eustis in Hampton, Virginia. Incumbents or current contractors are not named.
Notice text
9 versions
Update #9 · Latest ·
01/05/2021 - Amendment 0008 is issued to incorporate an updated wage determination. See attached amendment for details.
12/23/2020 - Amendment 0007 is issued to 1) provide revisions to the Small Business Factor; 2) provide additional clauses; 3) revised drawings and specifications; 4) to incorporate ProjNet responses into the solicitation. See attached amendment and additional attachements for further details.
12/17/2020 - Amendmnet 0006 is issued tor porvide revised drawings, specifications and an additional attachement titled "Langley Furniture Qty”. See attached amdnement and accomponying attachemnts fror further details.
12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.
11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"
11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.
11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #8 ·
12/23/2020 - Amendment 0007 is issued to 1) provide revisions to the Small Business Factor; 2) provide additional clauses; 3) revised drawings and specifications; 4) to incorporate ProjNet responses into the solicitation. See attached amendment and additional attachements for further details.
12/17/2020 - Amendmnet 0006 is issued tor porvide revised drawings, specifications and an additional attachement titled "Langley Furniture Qty”. See attached amdnement and accomponying attachemnts fror further details.
12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.
11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"
11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.
11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #7 ·
12/17/2020 - Amendmnet 0006 is issued tor porvide revised drawings, specifications and an additional attachement titled "Langley Furniture Qty”. See attached amdnement and accomponying attachemnts fror further details.
12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.
11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"
11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.
11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #6 ·
12/07/2020 - Amendment 0005 is issued to extend the proposal submission date and to provide the new due date for bidder inquiry submittals cutoff. See attached amendment for further details.
11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"
11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.
11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #5 ·
11/30/2020 - Amendment 0004 is issued to provide Geotechnical report for this project. See attached amendment and associated attachment "Geotechnical report"
11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.
11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #4 ·
11/24/2020 - Amendment 0003 is issued to revise drawings and specifications. See atttached amendment and the revised technical documents.
11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #3 ·
11/18/2020 - Amendment 0002 is issued to provide a site visit attendance roster.
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #2 ·
11/10/2020 - Amendment 0001 is issued to provide changes to Factor 1. Refer to the Amendment 0001 SF30 for further details.
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Update #1 ·
The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24n mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.
The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.
The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.
Attachments
Show all 50
This notice has more attachments on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Air Force Targeting Center, Langley AFB - Solicitation | Award Notice | |
| Air Force Targeting Center, Langley AFB - Solicitation | Solicitation | |
| Air Force Targeting Center, Langley AFB | Pre-Solicitation | |
| Air Force Targeting Center, Langley AFB - Presolicitation | Special Notice | |
| Air Force Targeting Center, Langley AFB | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity