This solicitation is for design and construction services for an Air Force Targeting Center facility at Langley Air Force Base in Virginia. Key requirements include constructing a new facility to support the Air Force's Intelligence, Surveillance, and Reconnaissance Wing providing 24/7 mission capability for command and control of targeting and threat analysis. The facility must be designed according to Department of Defense, Air Force, and Langley standards and use local materials and construction techniques where cost-effective. It will be a permanent structure meeting DoD unified facility criteria for general building requirements and high-performance sustainable buildings. The project scope also includes emergency generators, site improvements, special foundations above mean high tide, parking, and supporting facilities. The solicitation is being conducted by the Department of the Army Corps of Engineers Norfolk District.

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Targeting Center, Langley AFB - Solicitation, newest first.
File Type Posted
W9123621R2005 Amendment 0008.pdf PDF
Specs_V1_Revsied_00 00 00_TOC.pdf PDF
Vol.1B_Revised_Sheet A-313 - EXTERIOR WALL SECTIONS.pdf PDF
Specs_V2_Revised_10 22 19.pdf PDF
Specs_V1_Revised_02 60 00.pdf PDF
Specs_V2_Revised_08 71 00.pdf PDF
Vol.1A_Revised_Sheet CD-101 DEMOLITION PLAN.pdf PDF
Specs_V1_Revised_Appendix_B_ESS.pdf PDF
Vol.1B_Revised_Sheet A-602 - DOOR SCHEDULE - LEVEL 2.pdf PDF
Vol.1B_Revised_Sheet A-601 - DOOR SCHEDULE - LEVEL 1.pdf PDF
Specs_V1_Revised_00 00 00_TOC.pdf PDF
Specs_V2_Revised_08 81 00.pdf PDF
Vol.1B_Revised_Sheet IN102C - INTERIOR FINISH PLAN - SECOND FLOOR - AREA C.pdf PDF
Vol.1A_Revised_Sheet CG-111 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Langley Furniture Qty.pdf PDF
Vol.1B_Revised_Sheet I-001 INTERIOR NOTES AN FINISH LEGEND .pdf PDF
Vol.1B_Revised_Sheet A-411 - ENLARGED PLANS AND ELEVATIONS - SHOWERS AND NURSING ROOM.pdf PDF
Specs_V3_Revised_22 00 00.pdf PDF
W9123621R2005 0006.pdf PDF
W9123621R2005 0004.pdf PDF
FINAL_LAFB_TCF_Norfolk_District_USACE_Geotechnical_Report.pdf PDF
W9123621R20050003.pdf PDF
20201124_RTA_Specs_V4_Div_26-33_Appendix_Consolidated.pdf PDF
2020RTA_AFTC_Vol.1B.pdf PDF
2020RTA_AFTC_Vol.1A.pdf PDF
2020RTA_AFTC_Vol.2.pdf PDF
20201124_RTA_Specs_V3_Div_21-25_Consolidated.pdf PDF
20201124_RTA_Specs_V2_Div_07-14_Consolidated.pdf PDF
20201124_RTA_Specs_V1_Div_00-06_Consolidated.pdf PDF
Site Visit Roster_AF Targeting Center 21R2005.pdf PDF
W9123621R20050002.pdf PDF
A.02.01 Amendment 0001 Solicitation 21R2005_released.pdf PDF
B.02.09 Att. 2 Company Specialized Experience.pdf PDF
B.02.09 Att. 7 Small Business Participation Plan.pdf PDF
20191115_AFTC_IFC_Vol.1A (Full Scale).pdf PDF
20191115_IFC_Specs_V2_Div_07-14.pdf PDF
20191115_IFC_Specs_V4_Div_26-33_Appendix.pdf PDF
20191115_IFC_Specs_V1_Div_00-06.pdf PDF
JBLE-Langley AF TCF - NTCRA ESS Construction Support (20181115) DRAFT.pdf PDF
20190411_Furniture_specification_package_Amendment_2 (1).pdf PDF
A.02.01 Solicitation W9123621R2005_released 11.03.2020.pdf PDF
B.02.09 Att. 1 Proposal Data Sheet.pdf PDF
B.02.09 Att. 4 Telephone Interview Questionnaire (For Government Use Only).pdf PDF
B.02.09 Att. 8 CLIN Schedule.pdf PDF
20191115_IFC_Specs_V3_Div_21-25.pdf PDF
B.02.09 Att. 3 Past Performance Questionaire.pdf PDF
B.02.09 Att. 5 Letter of Commitment Sample.pdf PDF
B.02.09 Att. 6 Small Business Subcontracting Record.pdf PDF
20191115_AFTC_IFC_Vol.1B.pdf PDF
20191115_AFTC_IFC_Vol.2.pdf PDF
Show all 50

Air Force Targeting Center, Langley AFB - Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Force Targeting Center - Amendment 007 AFTARGETINGCTR Joint Base Langley-Eustis, Hampton, VA December 23, 2020

SECTION 01 33 00.00 50

SUBMITTAL PROCEDURES (Revised Amendment 007) 03/04

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Submittal

Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."

1.1.2 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by SD numbers and titles as follows.

SD-01 Preconstruction Submittals

Certificates of insurance Surety bonds List of proposed subcontractors List of proposed products Construction Progress Schedule Submittal register Schedule of prices Activity Hazard Analysis Design Network Analysis Schedule Health and safety plan Work plan Quality control plan Environmental protection plan Accident Prevention Plan (APP) Activity Hazard Analysis (AHA) Crane Critical Lift Plan

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials or equipment for some portion of the work.

SECTION 01 33 00.00 50 Page 1

UNCLASSIFIED\\FOUO

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.

SD-05 Design Data

Calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Confined space entry permits.

SECTION 01 33 00.00 50 Page 2

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative to confirm compliance with manufacturer's standards or instructions.

Factory test reports.

SD-10 Operation and Maintenance Data

Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

1.1.3 Approving Authority

Office authorized to approve submittal.

1.1.4 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00.00 50

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Submittal Register

1.3 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.3.1 Government Approved

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Within the terms of the Contract Clause entitled "Specifications

SECTION 01 33 00.00 50 Page 3 and Drawings for Construction," they are considered to be "shop drawings."

1.3.2 Information Only

All submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above. All submittals not requiring Government approval will be for information only.

1.4 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory .

Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.5 DISAPPROVED SUBMITTALS

The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Contracting Officer.

1.6 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

PART 2 PRODUCTS (NOT USED)

PART 3 GENERAL

As required by paragraph 3.6.1, all submittals designated for Government Approval shall be submitted within 63 calendar days of notice to proceed.

The Contractor shall make submittals as required by the specifications.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the Contractor's Quality Control (CQC) System Manager and each item shall be stamped, signed, and dated by the CQC System Manager indicating action taken.

Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves;

test reports; test cylinders; samples; O&M manuals (including parts list);

SECTION 01 33 00.00 50 Page 4 certifications; warranties; and other such required submittals.

Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

3.1 SUBMITTAL REGISTER

At the end of this section is a submittal register showing items of equipment and materials for which submittals are required by the specifications; this list may not be all inclusive and additional submittals may be required. The Contractor shall maintain a submittal register for the project in accordance with Section 01 45 00.00 10 QUALITY CONTROL. The Government will provide the initial submittal register in electronic format. Thereafter, the Contractor shall maintain a complete list of all submittals, including completion of all data columns. Dates on which submittals are received and returned by the Government will be included in its export file to the Contractor. The Contractor shall track all submittals.

3.2 Government Review Scheduling

Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of 30 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals. An additional 30 calendar days shall be allowed and shown on the register for review and approval of submittals for food service equipment and refrigeration and HVAC control systems.

3.2.1 Pre-Construction Submittal Scheduling

Pre-Construction submittals shall be scheduled and shown on the submittal register to allow a minimum of 30 calendar days (exclusive of mailing time) for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals.

3.3 TRANSMITTAL FORM (ENG FORM 4025)

The sample transmittal form (ENG Form 4025) shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.

3.4 SUBMITTAL PROCEDURES

Submittals shall be made as follows:

3.4.1 Procedures

All samples of materials submitted as required by these specifications

SECTION 01 33 00.00 50 Page 5 shall be properly identified and labeled for ready identification, and upon being certified, stored at the site of the work for jobsite use until all work has been completed and accepted by the CO. The Contractor will submit to the Contracting Officer for approval a minimum of 6 copies of all submittals.

3.4.2 Deviations

For submittals which include proposed deviations requested by the Contractor, the column "variation" of ENG Form 4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

3.5 CONTROL OF SUBMITTALS

The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

3.6 GOVERNMENT APPROVED SUBMITTALS

Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. 3 copies of the submittal will be retained by the Contracting Officer and 3 copies of the submittal will be returned to the Contractor.

3.6.1 Submission of Government Approved Submittals

As soon as practicable after notice to proceed, but not later than 63 calendar days after notice to proceed, the Contractor shall forward to the Contacting Officer all copies of submittals designated for Government approval(G). Submittals shall be as required in the technical sections of this specification, including shop drawings, product data, and samples.

Submittal types SD-06 (test Reports), SD-09 (Manufacturers Field Reports, SD-10 (Operations and Maintenance Data), and SD-11 (Closeout Submittals) need not be submitted within this 63 day limit; These submittal types shall be submitted by the dates/times established in the specifications.

3.7 INFORMATION ONLY SUBMITTALS

The Contractor shall submit 4 copies of all submittals specifically marked for information only (FIO). Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

3.8 STAMPS

Stamps used by the Contractor on the submittal data to certify that the

SECTION 01 33 00.00 50 Page 6 submittal meets contract requirements shall be similar to the following:

SECTION 01 33 00.00 50 Page 7

| CONTRACTOR |

| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s). |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

-- End of Section --

SECTION 01 33 00.00 50 Page 8

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 114 PAGES

Air Force Targeting Center at Joint Base Langley-Eustis

01 11 00 SD-03 Product Data

1.13.3Material Safety Data Sheet

Affirmative Procurement Report

Exemption Form, Annex B to

LAFB Affirmative Procurement

Plan

32-7080

1.17.1Work Clearance Request

1.24.2Quality Control (QC) Report

SD-11 Closeout Submittals

1.24.3Survey Report

1.24.2Metadata

1.24Deliverables and Final As-builts

1.24.9As-Built Drawings

1.25Warranty of Construction

1.26.1Equipment Warranty Certificate

1.26Warranty/Guarantee Records

1.30DD Form 1354

01 14 00 SD-01 Preconstruction Submittals

GGovernment Guard Services

GContractor Regulations

GTransportation of Personnel, Materials, and Equipment

GPurchase Orders

1.2.1.1 GList of Contact Personnel

1.3.1 GPersonnel List

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 114 PAGES

01 14 00 1.3.2 GVehicle List

GStatement of Acknowledgement

Form SF 1413

01 30 00 SD-01 Preconstruction Submittals

1.4 G ROView Location Map

1.5 G ROProgress and Completion

Pictures

SD-04 Samples

1.3 G RO Color Boards

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00.00 50 SD-01 Preconstruction Submittals

3.1Submittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.2.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.2.1 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.2.1 GFinal High Performance and

Sustainable Building Checklist

1.5.2.1 GFinal Sustainability eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 114 PAGES

01 33 29 1.5.2.1 GAmended Final Sustainability eNotebook

1.5.2.1 GAmended Final High

Performance and Sustainable

Building Checklist

1.4.4 GGBCI GP Assessment

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

Contractor Safety Self-Evaluation

Checklist

1.6.1.4Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

Third Party Certification of

Floating Cranes and

Barge-Mounted Mobile Cranes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 114 PAGES

01 35 26 License Certificates

GRadiography Operation Planning

Work Sheet

GPortable Gauge Operations

Planning Worksheet

Machinery & Mechanized

Equipment Certification Form

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

G ROSIOR Letter of Acceptance

G ROProject Manual

Written Practices

NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

Steel Truss Plant

Wood Truss Plant

2.1AC472 Accreditation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 114 PAGES

01 45 35 Steel Joist Institute Membership

2.1Certified Plant

2.1Certificate of Compliance

1.5.13 G ROSpecial Inspector of Record

1.5 G ROSpecial Inspector

Qualification Records

SD-11 Closeout Submittals

Interim Final Report

3.1.2 G ROComprehensive Final Report

01 58 00 SD-02 Shop Drawings

G ROPreliminary Drawing Indicating

Layout And Text Content

1.3.2 G ROSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-03 Product Data

1.7Recycling Report

1.7Trip Tickets

1.8Quarterly CWM Reports

SD-11 Closeout Submittals

1.7 GRecords

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.5Warranty Tags

3.8Final Cleaning

1.5Spare Parts Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 114 PAGES

01 78 00 SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

3.9 G ROInterim DD FORM 1354

3.9 G ROChecklist for DD FORM 1354

3.9 GHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 114 PAGES

01 78 23 3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

1.7 G DOCommissioning Firm's Contract

SD-06 Test Reports

3.1.3 G DODesign Review Report

3.1.2.1 G DOInterim Construction Phase

Commissioning Plan

3.1.2.2 G DOFinal Construction Phase

Commissioning Plan

3.1.2.1.3 G DOTemplate Building Envelope

Inspection Checklists

3.1.5.2 G DOBuilding Envelope Inspection

Checklists

3.1.5.3 G DOPre-Functional Checklists

1.9Issues Log

3.2 G DOCommissioning Report

3.3.1 G DOPost-Construction Trend Log

Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 114 PAGES

01 91 00.15 1.10 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 G DOSystems Manual

3.1.8 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.1.2.1 S DOConstruction Phase

Commissioning Plan

3.2 S DOFinal Commissioning Report

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data

2.2Form Materials

SD-04 Samples

1.3 GSample Panels

SD-05 Design Data

2.1Calculations

SD-06 Test Reports

3.2Inspection

03 15 00.00 10 SD-02 Shop Drawings

2.4 G AEWaterstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 114 PAGES

03 15 00.00 10 SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

SD-04 Samples

2.3.2Lubricant for Preformed

Compression Seals

2.3.3Field-Molded Type

2.4Waterstops

2.5.2 GSplicing Waterstops

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 G AEReinforcement

SD-03 Product Data

2.2 G AEReinforcing Steel

SD-06 Test Reports

2.6 GTests, Inspections, and

Verifications

SD-07 Certificates

2.2Reinforcing Steel

03 30 00.00 10 SD-01 Preconstruction Submittals

1.6.2 GQuality Control Plan

1.6.1Laboratory Accreditation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 114 PAGES

03 30 00.00 10 3.8.5.6 GSampling Plan

SD-03 Product Data

2.2Cementitious Materials

2.10Vapor Retarder

2.10Vapor Barrier

2.1.6Floor Finish

2.4Chemical Admixtures

SD-05 Design Data

2.1.1 G AEMixture Proportions

3.3Lightweight Aggregate Concrete

SD-06 Test Reports

2.1.1 G AEMixture Proportions

3.8 G AETesting and Inspection for CQC

2.2.3Fly Ash

2.2.5Ground Granulated Blast-Furnace

(GGBF) Slag

2.3Aggregates

3.8.5.1Air Content

3.8.5.3Slump

3.8.5.6Compressive Strength

2.5Water

SD-07 Certificates

1.6Contractor Quality Control personnel

3.2.1Ready-Mix Plant

03 35 00.00 10 SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 114 PAGES

03 35 00.00 10 1.3.1Field Test Panels

1.3.1.1Slab Panels

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data

2.1.1Standard Precast Units

2.1.3Proprietary Precast Units

3.1.3Embedded Items

2.2.3Accessories

SD-05 Design Data

2.1.2 GDesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports

1.3.2.4Test Reports

SD-07 Certificates

1.3.2.2Quality Control Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 114 PAGES

04 20 00 SD-02 Shop Drawings

3.4.4 G AEBond Beams

3.4.1.1 G AEDetail Drawings

G AEReinforcement Elevation of

Corners, Windows, Doors, and

Other Openings

SD-03 Product Data

1.5.1 G AEHot Weather Procedures

1.5.2 G AECold Weather Procedures

2.2.2 G AEClay or Shale Brick

2.4.1.1 G AECementitious Materials

2.6.8 G AEInsulation

2.2.3.2 G AEConcrete Masonry Units (CMU)

2.6.9 G AECavity Drainage

SD-04 Samples

1.3.1.1 G AEMock-Up Panel

2.2.2 G AEClay or Shale Brick

2.2.3.2 G AEConcrete Masonry Units (CMU)

2.4.1.4 G AEAdmixtures for Masonry Mortar

2.6.2 G AEAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

2.6.6 G AEClay Masonry Expansion-Joint

Materials

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 114 PAGES

04 20 00 2.2.3.4 G AEFire-Rated Concrete Masonry

Units

3.2.5 G AEBracing Calculations

2.6.2.4.1 G AETest Data

SD-06 Test Reports

2.2.2.1.3 G AEEfflorescence Test

2.2.3.4 G AEFire-Rated Concrete Masonry

Units

3.6.1.1 G AEField Testing of Mortar

3.6.1.2 G AEField Testing of Grout

3.6.1.3 G AEPrism Tests

SD-07 Certificates

1.3.2 G AESpecial Masonry Inspector

Qualifications

2.2.2 G AEClay or Shale Brick

2.2.3.2 G AEConcrete Masonry Units (CMU)

2.4.1.1 G AECementitious Materials

2.4.1.4 G AEAdmixtures for Masonry Mortar

2.4.2.2 G AEAdmixtures for Grout

2.6.2 G AEAnchors, Ties, and Bar

Positioners

2.6.3 G AEJoint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.4 G AEAdmixtures for Masonry Mortar

2.4.2.2 G AEAdmixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 114 PAGES

04 20 00 SD-10 Operation and Maintenance

Data

3.8 GTake-Back Program

04 72 00 SD-02 Shop Drawings

2.2 G AECast Stone

SD-03 Product Data

2.2 G AECast Stone

SD-04 Samples

2.2 G AECast Stone

SD-05 Design Data

1.3.5 G AECalculations

05 05 23.13 10 SD-03 Product Data

1.4.1Ultrasonic Inspection

SD-06 Test Reports

1.4.5Equipment Qualifications

3.4.1Inspection Test Reports

05 05 23.16 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification

1.3.6Inspector Qualification

1.3.2Previous Qualifications

1.3.3Pre-Qualified Procedures

2.2Welding Electrodes and Rods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 114 PAGES

05 05 23.16 SD-06 Test Reports

3.3Nondestructive Testing

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Brazing Procedure

Specifications (BPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.1Certified Brazer Performance

Qualifications (BPQ)

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection Drawings

SD-02 Shop Drawings

1.4.2 G AEFabrication Drawings

SD-03 Product Data

2.5.3 G AEShop Primer

2.4.1 G AEWelding Electrodes and Rods

2.3.1.3 G AEDirect Tension Indicator Washers

2.4.2 G AENon-Shrink Grout

3.2.3 G AETension Control Bolts

SD-06 Test Reports

2.5.3Class B Coating

2.3Bolts, Nuts, and Washers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 114 PAGES

05 12 00 3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3AISC Fabrication Plant Quality

Certification

1.3AISC Erector Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G AESteel Joist Framing

SD-05 Design Data

2.2 G AEDesign Calculations

SD-06 Test Reports

3.2Erection Inspection

3.2Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 114 PAGES

05 30 00 1.3.5 G AEFabrication Drawings

SD-03 Product Data

2.2 G AEAccessories

2.1 G AEDeck Units

2.2.16 G AEMechanical Fasteners

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1Metal Roof Deck Units

2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.11Stud Manufacture's Certification

2.2.11Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

1.5.1 G AEFraming Components

SD-03 Product Data

2.1 G AEStuds, Joists

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 114 PAGES

05 40 00 1.5.2 G AEMetal Framing Calculations

SD-07 Certificates

3.1.1Welds

05 50 13 SD-02 Shop Drawings

2.5 G AESump Pump Cover Gratings

2.6 GAngles and Plates

2.2 GMiscellaneous Metals and

Standard Metal Articles

2.3 GShop Fabricated Metal Items

SD-03 Product Data

2.2 GMiscellaneous Metals and

Standard Metal Articles

2.3 GShop Fabricated Metal Items

05 51 00 SD-02 Shop Drawings

2.1 G AEIron and Steel Hardware

2.1 G AESteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

SD-03 Product Data

2.4.1 G AEStructural-Steel Plates, Shapes, and Bars

2.4.2 G AEStructural-Steel Tubing

2.4.5 G AEHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G AECold-Finished Steel Bars

2.4.3 G AEHot-Rolled Carbon Steel Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 114 PAGES

05 51 00 2.4.6 G AECold-Rolled Carbon Steel Sheets

2.4.7 G AEGalvanized Carbon Steel Sheets

2.4.8 G AECold-Drawn Steel Tubing

2.2.3 G AEProtective Coating

2.2.2 G AESteel Pan Stairs

2.3.1 G AESteel Stairs

SD-07 Certificates

1.3.1 G AEWelding Procedures

1.3.1 G AEWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 G AEStructural-Steel Plates, Shapes, and Bars

2.4.2 G AEStructural-Steel Tubing

2.4.5 G AEHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G AECold-Finished Steel Bars

2.4.3 G AEHot-Rolled Carbon Steel Bars

2.4.6 G AECold-Rolled Carbon Steel Sheets

2.4.7 G AEGalvanized Carbon Steel Sheets

2.4.8 G AECold-Drawn Steel Tubing

2.2.3 G AEProtective Coating

05 52 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

3.2 G AEIron and Steel Hardware

3.2 G AESteel Shapes, Plates, Bars and

Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 114 PAGES

05 52 00 SD-03 Product Data

2.2.2 G AECold-Finished Steel Bars

2.2.1 G AEHot-Rolled Carbon Steel Bars

2.2.3 G AECold-Drawn Steel Tubing

2.3.2 G AEProtective Coating

2.2.6 G AESteel Railings and Handrails

1.2.1 G AEAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 G AEWelding Procedures

1.4.2 G AEWelder Qualification

SD-08 Manufacturer’s Instructions

3.2 G AEInstallation Instructions

05 72 00 SD-02 Shop Drawings

1.3.1 GOrnamental Metal Items

2.1 G AEInstallation Drawings

2.1 G AEShop and Field Connections

2.1 G AEConstruction Details

SD-03 Product Data

2.2 GMaterials

2.3 GFabrication

1.3.1 G AEOrnamental Metal Items

SD-04 Samples

1.3.1 G AEManufacturer's Standard Color

Charts

1.3.1 G AEFinish Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 114 PAGES

05 72 00 2.3.6 G AEAluminum Finishes

SD-08 Manufacturer’s Instructions

3.3Cleaning Materials

3.3Preventative Maintenance and

Inspection

3.4Maintenance Instructions

3.3Application Methods

05 73 13 SD-02 Shop Drawings

2.3 G AEGlass-Supported Railing System

SD-03 Product Data

2.3 G AEGlass-Supported Railing System

SD-04 Samples

2.3 G AEGlass-Supported Railing System

SD-05 Design Data

2.3 G AEGlass-Supported Railing System

SD-06 Test Reports

GTest Reports

SD-11 Closeout Submittals

GMaintenance Instructions

G AEWarranty

06 10 00 SD-02 Shop Drawings

1.9.1 GFabricated

1.9.2 GModifications of Structural

Members

2.2.1 GNailing Strips

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 114 PAGES

06 10 00 1.8Fire-retardant Treatment

2.4.3Adhesives

SD-06 Test Reports

1.7Preservative Treatment

SD-07 Certificates

1.11.1Certificates of Grade

1.7Preservative Treatment

Indoor Air Quality

SD-10 Operation and Maintenance

Data

3.4.1Take-back Program

06 16 43 SD-03 Product Data

2.1 GMaterials

06 20 00 SD-02 Shop Drawings

1.3 G AEDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 G AEWood Products

2.3 G AEHardware and Accessories

SD-04 Samples

1.5 G AESamples

SD-07 Certificates

1.7.1.1 G AECertificates of Grade

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 G AEShop Drawings

2.10 G AEShop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 114 PAGES

06 41 16.00 10 3.1 G AEInstallation

SD-03 Product Data

2.1 G AEWood Materials

2.10.8.3 G AEFinish Schedule

SD-04 Samples

2.3 G AEPlastic Laminates

2.6 G AECabinet Hardware

SD-07 Certificates

1.5 G AEQuality Assurance

3.1 G AELaminate Clad Casework

06 42 00 SD-02 Shop Drawings

2.1 G AEPrefinished Wood Wall Panel

System

2.1 G AEWood Slat Panel Wall System

SD-03 Product Data

2.1 G AEPrefinished Wood Wall Panel

System

2.1 G AEWood Slat Panel Wall System

SD-04 Samples

2.1 G AEPrefinished Wood Wall Panel

System

2.1 G AEWood Slat Panel Wall System

3.2 G AEMock-Up Walls

SD-07 Certificates

2.1 G AEPrefinished Wood Wall Panel

System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 114 PAGES

06 42 00 SD-08 Manufacturer’s Instructions

2.1 GPrefinished Wood Wall Panel

System

SD-10 Operation and Maintenance

Data

2.1 GPrefinished Wood Wall Panel

System

06 61 16 SD-02 Shop Drawings

1.4.2 G AEDetail Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G AESolid Polymer Material

1.4.1Qualifications

2.3Fabrications

1.4.3Certification

1.4.3 G AEVOC Content

SD-04 Samples

2.1 G AEMaterial

2.3.4 G AECounter and Window Sills Tops

SD-06 Test Reports

2.1 G AESolid Polymer Material

SD-07 Certificates

2.3Fabrications

1.4.1Qualifications

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 114 PAGES

06 61 16 3.2Clean-up

06 61 17 SD-02 Shop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G AEDecorative Polymer Material

1.4Qualifications

2.7Fabrications

2.5Low-Emitting Materials

SD-04 Samples

2.3 G AEMaterial

SD-06 Test Reports

2.1Decorative Polymer Material

SD-07 Certificates

1.4Qualifications

SD-10 Operation and Maintenance

Data

3.1.3Clean-up

07 05 23 SD-01 Preconstruction Submittals

1.4 G S AWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 G AEEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 114 PAGES

07 05 23 1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G AEPressure Test Procedures

3.5.7 G AEAir Leakage Test Report

3.6.5 G AEDiagnostic Test Report

07 14 00 SD-03 Product Data

2.1 G AEFluid-Applied Membrane

2.2 G AEMembrane Primer

3.3 G AESolvent

3.4.1 G AEMoisture Meter

2.8 G AEProtection Board

2.7 G AEBond Breaker

SD-11 Closeout Submittals

1.6 G AEWarranty

3.6 GInformation Card

3.5 GInstructions To Government

Personnel

07 19 00 SD-03 Product Data

2.2 G AEWater Repellents

SD-06 Test Reports

1.3.2 G AEWater Absorption

2.3.1 G AEWater Absorption

2.3.1 G AEAccelerated Weathering

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 114 PAGES

07 19 00 2.3.1 G AEResistance to Chloride Ion

Penetration

1.3.2 G AEMoisture Vapor Transmission

2.3.1 G AEMoisture Vapor Transmission

2.3.1 G AEScaling Resistance

1.3.2Water Penetration and Leakage

SD-07 Certificates

1.3.1Manufacturer's Qualifications

1.3.1Applicator's Qualifications

1.3.3Evidence of Acceptable Variation

1.12Warranty

SD-08 Manufacturer’s Instructions

3.4 G AEApplication

1.7.1 G AESafety Data Sheets

07 21 13 SD-03 Product Data

1.3 G AEManufacturer's Standard Details

2.2 G AEBlock or Board Insulation

1.4 G AEProtection Board or Coatings

2.5 G AEAccessories

SD-07 Certificates

2.4 G AEProtection Board or Coating

1.7 G AESpecial Warranties

1.7 G AESpecial Warranties

SD-08 Manufacturer’s Instructions

2.2Block or Board Insulation

2.5.1Adhesive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 114 PAGES

07 22 00 SD-02 Shop Drawings

1.3 G AEInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 G AEInsulation

1.4 G AECover Board

2.4 GFasteners

2.3 G AEMoisture Control

SD-06 Test Reports

1.8.1 G AEFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials

SD-08 Manufacturer’s Instructions

2.4 G AEFasteners

2.1 G AEInsulation

07 23 00 SD-03 Product Data

2.1 GFabric Liner

SD-08 Manufacturer’s Instructions

3.3.2Installation of Fabric Liner

07 27 10.00 10 SD-04 Samples

3.1.2 G AEMock-Up

SD-06 Test Reports

1.8 G DODesign Review Report

3.1.3 G ROTesting and Inspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 114 PAGES

07 27 10.00 10 SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 G AEQualifications of Manufacturer

1.8.2 G AEQualifications of Installer

SD-02 Shop Drawings

1.4 G AESelf-adhering Air Barrier

SD-03 Product Data

1.4 G AESelf-adhering Air Barrier

2.3 G AEPrimers, Adhesives, and Mastics

1.4.2 G AESafety Data Sheets

SD-04 Samples

1.4 G AESelf-adhering Air Barrier

SD-06 Test Reports

1.6 G AEField Peel Adhesion Test

1.4.4 G AEFlame Propagation of Wall

Assemblies

1.4.4 G AEFlame Spread and Smoke

Developed Index Ratings

3.4.1 G AESite Inspections and Testing

SD-07 Certificates

1.4 G AESelf-adhering Air Barrier

1.8.1 G AEQualifications of Manufacturer

1.8.2 G AEQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 G AESelf-adhering Air Barrier

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N