Vol.1B_Revised_Sheet A-313 - EXTERIOR WALL SECTIONS.pdf
PDF 743 KB Posted
- Attached to
- Air Force Targeting Center, Langley AFB - Solicitation Federal contract opportunity
- Solicitation number
- W9123621R2005
About this file
This solicitation package includes documents related to a federal construction contract opportunity for the Air Force Targeting Center Facility at Langley Air Force Base in Virginia. The scope of work involves constructing a new facility to support the Air Force's Intelligence, Surveillance, and Reconnaissance Wing and provide 24/7 mission capability for command and control of target and threat analysis. The project will construct the facility using conventional design and construction methods to accommodate the targeting center's mission and comply with military and base design standards. The facility is designed as a permanent structure meeting DoD building requirements for performance, sustainability, and antiterrorism protection. Site work will include emergency generators, improvements, special foundations, parking, and supporting facilities. The Army Corps of Engineers district office in Norfolk is listed as the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
Air Force Targeting Center, Langley AFB - Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 2
18' - 0"
LEVEL 1
0' - 0"
G
A-550
A7
04F
04A
07B
4' -8
8"
4' -0
'-0
SIM
A-550
E7
17 OPS
GROUP
215215
363 ISRG
OPS
GROUP
114114
F .O
M
A S
3'-0" 2'-4"
5'-4"
METAL PANEL FASCIA AND
SOFFIT
METAL GUTTER
RAISED ACCESS FLOOR
CONCRETE SLAB - RE:
STRUCT
STRUCTURAL FRAMING TYP.
- RE: STRUCT
COMPOSITE SLAB - RE:
STRUCT
STRUCTURAL FRAMING TYP.
- RE: STRUCT
01B
FINISH GRADE - RE: CIVIL
01B
E.O.S.
2'-4"
GRAVEL COURSE
VAPOR BARRIER
DRAINAGE TILE,
CONNECTED TO STORM
DRAINAGE SYSTEM
1 HOUR FIRE SAFING AT
SLAB EDGE
04F
EXTERIOR MATERIAL NOTES
1. LIQUID APPLIED FLASHING SHALL OVERLAP AIR BARRIER
AT ALL CORNERS, AROUND OPENINGS, PENETRATIONS OR
FASTENERS.
2. AIR BARRIER AND RIGID INSULATION SHALL BE
CONTINUOUS AT ALL LOCATIONS.
3. PRIMARY AND SECONDARY BACK ROD AND SEALANT IS
REQUIRED AT ALL WINDOW, DOOR, AND LOUVER
OPENINGS, TYP.
EXTERIOR ASSEMBLY NOTES
D
LEVEL 1
0' - 0"
A-564
A4
A-563
E1
A-563
C1
07B
CURTAIN WALL AS SCHED.
04F
CURTAIN WALL AS SCHED.
VESTIBULE
100A100A
2'-0" 2'-4"
4'-4"
F .O
M
A S
METAL PANEL FASCIA AND
SOFFIT
METAL GUTTER
04F
FINISH GRADE - RE: CIVIL
CONCRETE SLAB - RE:
STRUCT
STRUCTURAL FRAMING
BEYOND
'-0
2'
-9
/2
SE3
SE2
CEILING - RE: INTERIORS
E.O.S.
2'-4"
DRAINAGE TILE,
CONNECTED TO STORM
DRAINAGE SYSTEM
VAPOR BARRIER
GRAVEL COURSE
A-563
E1
A-551
D4
8' -3
/2
LEVEL 2
18' - 0"
LEVEL 1
0' - 0"
G
5' -4
'-8
7' -4
363 ISS
OPS
GROUP
120120
36 IS/42 IS
OPS
GROUP
223223
04A
3'-0" 2'-4"
5'-4"
F .O
M
A S
CONCRETE FOUNDATION
-RE: STRUCT
STRUCTURAL FRAMING
BEYOND
RAISED ACCESS FLOOR
CEILING - RE: INTERIORS
STRUCTURAL FRAMING TYP.
- RE: STRUCT
METAL PANEL FASCIA AND
SOFFIT
COMPOSITE SLAB - RE:
STRUCT
E.O.S.
3'-4"
GRAVEL COURSE
VAPOR BARRIER
DRAINAGE TILE,
CONNECTED TO STORM
DRAINAGE SYSTEM
SIM
A-565
D7
SIM
A-565
A7
A-565
A1
SIM
A-550
E7
04F
04A
07B
01B
1 HOUR FIRE SAFING AT
SLAB EDGE
LEVEL 2
18' - 0"
LEVEL 1
0' - 0"
04A
F .O
M
A S
SIM
A-550
A7
ISS CCS
122C122C
36 IS/42 IS
OPS
GROUP
223223
3'-0" 2'-4"
5'-4"
04A
8" 4'
-0
2' -0
'-8
4' -0
07B
04F
CAST STONE SHAPE
CEILING - RE: INTERIORS
CONCRETE SLAB - RE:
STRUCT
COMPOSITE SLAB - RE:
STRUCT
STRUCTURAL FRAMING TYP.
- RE: STRUCT
STRUCTURAL FRAMING TYP.
- RE: STRUCT
STRUCTURAL FRAMING TYP.
- RE: STRUCT
01B
FINISH GRADE - RE: CIVIL
RAISED ACCESS FLOOR
METAL PANEL FASCIA AND
SOFFIT
01B
E.O.S.
2'-4"
GRAVEL COURSE
VAPOR BARRIER
DRAINAGE TILE,
CONNECTED TO STORM
DRAINAGE SYSTEM
A-550
E4
1 HOUR FIRE SAFING AT
SLAB EDGE
04F
0 2'-0" 4'-0" 8'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S
O F
E N
G
IN
E E
R S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
J E
S S
IC
A
A N
D E
R S
O N
L A
N G
L E
Y A
F B
V
IR
G
IN
IA
L A
N G
L E
Y A
IR
F
O R
C E
T A
R G
E T
IN
G
F A
C
IL
IT
Y
H D
R
IN
C
W
A S
H
IN
G T
O N
B
L V
D S
U
IT
E
A R
L
IN
G T
O N
V
A
MAIN BLDG.
A-313
E X
T E
R
IO
R W
A L
L S
E C
T
IO
N S
J E
F F
R E
Y G
E T
T Y
E R
IC
H
O F
M A
N N
A P
R
IL
D R
A K
E
/2 /2
W
-2
-R -2
READY TO ADVERTISE (RTA)
1/4" = 1'-0" A3
WALL SECTION
KEYNOTES - REFERENCE
01B CONTROLLED PERIMETER BOUNDARY SHOWN DASHED -
RE: MEP FOR DISCIPLINE-SPECIFIC PENETRATION DETAILS
03A CONCRETE SLAB - RE: STRUCT
03B CONCRETE FOUNDATION -RE: STRUCT
03E GRAVEL COURSE
04A 3-5/8" BRICK VENEER WITH 1-3/4" AIR GAP SUPPORTED BY
STAINLESS STEEL BRICK TIES, 2" SEMI-RIGID INSULATION
ON VAPOR PERMEABLE AIR BARRIER ON 7-5/8" CMU
(GROUTED SOLID) BACKUP. FACE BRICK TO RETURN AT
OPENINGS TYP.
04F 3-5/8" CAST STONE WITH 1-3/4" AIR GAP SUPPORTED BY
BRICK TIES, 2" SEMI-RIGID INSULATION ON VAPOR
PERMEABLE AIR BARRIER ON 7-5/8" CMU (GROUTED SOLID)
BACKUP. CAST STONE TO RETURN AT OPENINGS TYP.
04G CAST STONE SHAPE
05A COMPOSITE SLAB - RE: STRUCT
05B STRUCTURAL FRAMING TYP. - RE: STRUCT
05C STRUCTURAL FRAMING BEYOND
07A CURTAIN WALL AS SCHED.
07B STANDING SEAM METAL ROOFING WITH 6" CONTINUOUS
RIGID INSULATION ON AIR BARRIER ON 1-1/2" METAL DECK.
SEE FINISHES FOR ROOF COLOR SELECTION.
07C METAL PANEL FASCIA AND SOFFIT
07E METAL GUTTER
07G VAPOR BARRIER
07J 1 HOUR FIRE SAFING AT SLAB EDGE
09A CEILING - RE: INTERIORS
09D RAISED ACCESS FLOOR
32E FINISH GRADE - RE: CIVIL
33B DRAINAGE TILE, CONNECTED TO STORM DRAINAGE
SYSTEM
1/4" = 1'-0" A1
WALL SECTION
1/4" = 1'-0"
A6
WALL SECTION AT EXT COLUMN
1/4" = 1'-0" A7
WALL SECTION - NORTH
A m e n d m e n t
/2
/2
| Sheets |
| A-313 - EXTERIOR WALL SECTIONS |
File details come from the government source that posted it. Updated .