W9123621R2005 0007.pdf

PDF 642 KB Posted

Attached to
Air Force Targeting Center, Langley AFB - Solicitation Federal contract opportunity
Solicitation number
W9123621R2005
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This solicitation is for the construction of an Air Force Targeting Center Facility at Langley Air Force Base in Hampton, Virginia. The project includes construction of a new facility to support the Air Force's Intelligence, Surveillance, and Reconnaissance Wing, with emergency generators, site improvements, foundations above mean high tide, parking, and supporting facilities. Proposals are due by January 7, 2021 and will be evaluated based on specialized experience, past performance, small business participation plans, and price. Offerors must meet standards for recent and relevant vertical construction experience of over 20,000 square feet and project magnitude greater than $10 million. Construction of secure areas and experience removing unexploded ordnances are preferred.

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Targeting Center, Langley AFB - Solicitation, newest first.
File Type Posted
W9123621R2005 Amendment 0008.pdf PDF
Specs_V1_Revsied_00 00 00_TOC.pdf PDF
Vol.1A_Revised_Sheet CD-101 DEMOLITION PLAN.pdf PDF
Specs_V1_Revised_Appendix_B_ESS.pdf PDF
Vol.1B_Revised_Sheet A-313 - EXTERIOR WALL SECTIONS.pdf PDF
Specs_V2_Revised_10 22 19.pdf PDF
Specs_V1_Revised_02 60 00.pdf PDF
Specs_V2_Revised_08 71 00.pdf PDF
Vol.1B_Revised_Sheet A-602 - DOOR SCHEDULE - LEVEL 2.pdf PDF
Vol.1B_Revised_Sheet A-601 - DOOR SCHEDULE - LEVEL 1.pdf PDF
Specs_V1_Revised_00 00 00_TOC.pdf PDF
Specs_V2_Revised_08 81 00.pdf PDF
Vol.1B_Revised_Sheet I-001 INTERIOR NOTES AN FINISH LEGEND .pdf PDF
Vol.1B_Revised_Sheet A-411 - ENLARGED PLANS AND ELEVATIONS - SHOWERS AND NURSING ROOM.pdf PDF
Specs_V3_Revised_22 00 00.pdf PDF
W9123621R2005 0006.pdf PDF
Vol.1B_Revised_Sheet IN102C - INTERIOR FINISH PLAN - SECOND FLOOR - AREA C.pdf PDF
Vol.1A_Revised_Sheet CG-111 EROSION & SEDIMENT CONTORL DETAIL SHEET.pdf PDF
Langley Furniture Qty.pdf PDF
W9123621R2005 0004.pdf PDF
FINAL_LAFB_TCF_Norfolk_District_USACE_Geotechnical_Report.pdf PDF
W9123621R20050003.pdf PDF
20201124_RTA_Specs_V4_Div_26-33_Appendix_Consolidated.pdf PDF
2020RTA_AFTC_Vol.1B.pdf PDF
2020RTA_AFTC_Vol.1A.pdf PDF
2020RTA_AFTC_Vol.2.pdf PDF
20201124_RTA_Specs_V3_Div_21-25_Consolidated.pdf PDF
20201124_RTA_Specs_V2_Div_07-14_Consolidated.pdf PDF
20201124_RTA_Specs_V1_Div_00-06_Consolidated.pdf PDF
Site Visit Roster_AF Targeting Center 21R2005.pdf PDF
W9123621R20050002.pdf PDF
A.02.01 Amendment 0001 Solicitation 21R2005_released.pdf PDF
B.02.09 Att. 2 Company Specialized Experience.pdf PDF
B.02.09 Att. 7 Small Business Participation Plan.pdf PDF
20191115_AFTC_IFC_Vol.1A (Full Scale).pdf PDF
20191115_IFC_Specs_V2_Div_07-14.pdf PDF
20191115_IFC_Specs_V4_Div_26-33_Appendix.pdf PDF
20191115_IFC_Specs_V1_Div_00-06.pdf PDF
JBLE-Langley AF TCF - NTCRA ESS Construction Support (20181115) DRAFT.pdf PDF
A.02.01 Solicitation W9123621R2005_released 11.03.2020.pdf PDF
B.02.09 Att. 1 Proposal Data Sheet.pdf PDF
B.02.09 Att. 4 Telephone Interview Questionnaire (For Government Use Only).pdf PDF
B.02.09 Att. 8 CLIN Schedule.pdf PDF
20191115_IFC_Specs_V3_Div_21-25.pdf PDF
20190411_Furniture_specification_package_Amendment_2 (1).pdf PDF
B.02.09 Att. 3 Past Performance Questionaire.pdf PDF
B.02.09 Att. 5 Letter of Commitment Sample.pdf PDF
B.02.09 Att. 6 Small Business Subcontracting Record.pdf PDF
20191115_AFTC_IFC_Vol.1B.pdf PDF
20191115_AFTC_IFC_Vol.2.pdf PDF
Show all 50

Air Force Targeting Center, Langley AFB - Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W9123621R2005 Air Force Targeting Center Facility, Joint Base Langley-Eustis, Hampton, VA is hereby amended as follow s:

1. All ProjNet questions and evaluations are added.

2. Technical documents are revised and uploaded to beta.SAM. Continuation page offers more details on this.

3. Section 54.1.2.1 Paragraph 2 is revised to replace 6.2.2 w ith 5.4.2.2.

4. Clauses 252.204-7019 and 252.204-7020 are added.

Please see continuation page for full breakout of amendment.

Contracting POC: Axel Doody 757-201-7712 Axel.F.Doody@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 31

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621R2005

X 9B. DATED (SEE ITEM 11)

03-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Dec-2020

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621R2005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 0007 DETAILS

Amendment 0007 Technical Revision Details

Description of Change:

A. Specification Revisions:

1. Specs_V1_Revised_02 60 00

a. Revisions made to paragraph 1.2.1 Site and 1.3.4 Explosive Safety Submission (ESS)

b. Attachment A – Provided as reference

c. Appendix B – ESS

2. Specs_V2_Revised_08 71 00

a. Revisions to HW Sets 22, 38, 41 & 49 (Comment 8954433)

3. Specs_V2_Revised_10 22 19

a. Removal of paragraph 2.1.1 Burning Characteristics (Comment 89669736)

b. Revisions to paragraph 2.1.2 Acoustical Performance (Comment 8976108)

c. Revision to paragraph 2.3.4 Doors and Frame (Comment 8976109)

4. Specs_V1_Revised_01 33 00.00 50

a. Removal of paragraph 2.1.1 Burning Characteristics from Section 10 22 19 caused a change to the submittal register.

B. Drawing Revisions:

Volume 1

1. Vol.1A_Revised_Sheet CD-101 DEMOLITION PLAN

2. Vol.1A_Revised_Sheet CD-102 DEMOLITION PLAN

3. Vol.1B_Revised_Sheet A-313 EXTERIOR WALL SECTION

Volume 2

4. N/A

PROJNET INQUIRIES

The following Bidder Inquiry and subsequent corresponding Government Response are hereby incorporated:

Bidder Inquiry 8899407: Presently a recent project is defined to be no older than seven(7) years preceding the date of issuance of the Solicitation. Some of the required relevant project criteria is very specific and as a result, competition will be limited with only a seven year time period. We request that the recent time period be revised to 10 years.

Government Response to 8899407: Factor 1 recent experience changed from seven (7) years to ten (10) years.

Please see amendment 0001 posted to beta.SAM.

Bidder Inquiry 8900094: This proposal was solicited previously and cancelled which allowed for previous experience up to 10 years prior for Factor 1. The current RFP limits to only 7 years for previous experience. Please allow for 10 years from the date of solicitation in order to expand the allowable competition based on the specific requirements.

Government Response to 8900094: Factor 1, recent experience changed from seven (7) years to ten (10) years.

Please see amendment 0001 posted to beta.SAM.

Bidder Inquiry 8912027: I need clarification on the gas pressure regulators serving the two boilers (B-1 and B-2), the steam generator (SG-1), and the domestic water heater (PH-1), shown on the natural gas riser diagram on Sheet P-607. The riser, just downstream of VNG's meter indicates a service pressure of 14 in. w.c., and each gas fired appliance shows a gas regulator to reduce the pressure from 14 in. w.c. down to 7 in. w.c. A 14 in. w.c. service pressure is very unusual. For this type of facility, VNG normally would provide a 5 PSIG service pressure. I suspect that the service pressure will be 5 PSIG, and NOT 14 in. w.c. Are you able to confirm with VNG what service pressure they will be providing to this building at Langley AFB? If it is 14 in. w.c., as indicated on the drawings, then you may not need regulators at all. The 14 in. w.c. pressure may be suitable for the appliance regulators on each appliance. Also, regulators to reduce a service pressure of 14 in. w.c. down to 7 in. w.c. is difficult. Please advise.

Government Response to 8912027: Provide regulators as shown for boilers and steam generators. Regulators are not required for domestic water heaters. HDR has confirmed with vendors that a regulator sized for 14psi to 7psi is readily available.

Bidder Inquiry 8920195: We were asked tor review the solicitation for Audio Visual requirements. We do note that in the description there is reference to Secure VTC - additionally, the Furniture Amendment shows rooms that would require AV, however, there is no mention of AV. Is AV intended to be part of this solicitation or will it be procured separately.

Government Response to 8920195: We are providing pathways only on this project.

Bidder Inquiry 8932260: Part 3 of section 01 03 00 has several Clin options / alternates but the alternates are not included in Attachment 8 Clin Schedule or the Solicitation. Please advise.

Government Response to 8932260: Section 01 03 00 was removed from the solicitation in the amendment posted on 11/24. The CLIN schedule should now match the other bid documents.

Bidder Inquiry 8934140: The RFP states that each volume of our proposal should have the following page setup parameters: Margins – Top, Bottom, Left, Right – 1", Gutter- 0", From Edge – Header Footer .5", (11) point Arial or Times New Roman font. Does this mean that our proposal header and footer (i.e. page number, logo, font size, page indicators) have to fit within those parameters, or does apply solely to the response content?

Government Response to 8934140: This applies to all the content of the proposal.

Bidder Inquiry 8934658: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT form is missing from addendum 3 upload.

Government Response to 8934658: Amendment 0003 is uploaded to beta.SAM.

Bidder Inquiry 8942489: Is it acceptable to use previously completed PPQ in our submission.

Government Response to 8942489: Per solicitation, section 5.3.1, "If there is not a completed CPARS evaluation, then an offeror shall submit Past Performance Questionnaire (PPQ) for each project included in Factor 1. Previously submitted PPQs are acceptable. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs."

Bidder Inquiry 8942507: Will the contractor be charged for power & water consumption? Section 011100, paragraph implies that these services can be provided from existing services at no charge. Notes 12 & 13 on Drawing CU101 seem to imply the same.

Government Response to 8942507: Yes, per 01 11 00 1.18 "All reasonable amounts of water and electricity required for this work will be made available..." There will be no charge to the contractor for consumption.

Bidder Inquiry 8942512: Will the entire construction site have to be enclosed by chain link fencing? If so, will fabric screening also need to be provided on the fencing?

Government Response to 8942512: The contractor will meet the requirements of 01 50 02.00 50 1.7.2 and 01 11 00 1.9.4. Chain link fence with screen are required.

Bidder Inquiry 8942519: Is wetland permitting required? If so, is the contractor responsible for obtaining & paying for the permits?

Government Response to 8942519: There are no wetlands located within the project site. Not wetlands permits are required.

Bidder Inquiry 8942527: In Details A4, B4, C4, A1, B1 & D1 on drawings A-521, it indicates to put wallcovering WC-1 on the face of the acoustical wall panels (AWP-1). However, in the Finish legend on drawing I-001, acoustical panels AWP-1 already have a Maharam fabric facing indicated. Are we to install WC-1 wallcovering on top of the fabric facing of the acoustical wall panels?

Government Response to 8942527: Acoustic panel to only have one fabric, which is the Maharam. WC-1 is not to be applied on top of the AWP-1 fabric. Future Technical Amendment will remove WC-1 text on details A4, B4, C4, A1, B1 & D1 located on sheet A-521 in future submission.

Bidder Inquiry 8942875: There are no fire extinguishers or fire extinguisher cabinets indicated on the drawings.

There is also no specification section for fire extinguishers or cabinets. Are we to assume that none will be required?

Government Response to 8942875: Fire extinguishers and cabinets are not required.

Bidder Inquiry 8943175: Would it be possible to push the bid date on the Air Force Targeting Center to January 7th? Due to the holiday and the multiple military projects bidding in the next few weeks, we hear from our subs that they're not going to have enough time. We want to assure the best value for the Corp and that are small disadvantage business community has the time to compete.

Government Response to 8943175: Please see amendment 0005 posted to beta.SAM for proposal due date extension details.

Bidder Inquiry 8947107: Decorative Film DF-2, 3M Product Pixela SH2FGPX has been discontinued. Also, while Aerina film (DF-1)is still available, it is not available in the size or configuration specified. Aerina comes in a 50" wide roll and has a linear gradation of 88% transmission at the top to 56% transmission at the bottom (see PDF).

The job specifications call for a swath of film that is 84" high with 24" of gradated film at the top, then 36" of non-gradated film, then 24" of gradated film at the bottom (see attached PDF's). It may be possible to create this effect using two different films with three separate pieces on each pane of glass, but it would be extremely difficult to perfectly line up the seams on all 71 panes. Please provide direction.

Government Response to 8947107: Replace with a similar product, DF-2 to be Lattice-G SH2FGLT-g. DF-1 is a custom gradient that 3M confirmed they can provide the product as specified. DF-1 to be a continuous sheet with a custom gradient that can be installed on the panes of glass. Will update finish key on Sheet I-001 in the next amendment.

Bidder Inquiry 8947423: Please provide another date when requesting a Request for Upload Code under Amendment #1 Instructions to Offerors 2.5.2. Confirm that this date should be earlier than the submission date of 12-17-2020 and earlier than 12-14-2020 for early submission.

Government Response to 8947423: Please see amendment 0005 posted to beta.SAM with updated information on proposal submission.

Bidder Inquiry 8947424: Under Amendment #1 Instructions to Offerors 5.4.1.2.1 #2, please confirm that the intention was to follow the Evaluation Criteria listed under 5.4.2. There is no 6.2.2 in the spec.

Government Response to 8947424: 6.2.2 is incorrect and the next amendment will show Section 5.4.1.2.1 Paragraph 2 is revised to replace 6.2.2 with 5.4.2.2.

Bidder Inquiry 8947497: In Shower Rooms 232 & 233 elevations are a bit confusing. The elevations do not show the tile pattern. There are some arrows, but it's very hard to tell what walls get tile and what walls do not. For instance, there are enclosed toilet rooms in the shower rooms. Plan Page A-411, detail A6 shows this wall but does not show a toilet so I can't see if those wet walls get tile. Also on that page, detail A1 has 2 arrows for CWT-1, but the North wall is in between them with no arrow. Am I to assume the north wall does not get tile? Lastly, there is no clear indication of shower surround tile. Do you know if the shower floors or walls get any tile? I see that some of the elevations show wall tile leading to the shower, but I need to know what goes in the shower if anything. Please clarify.

Government Response to 8947497: All walls in shower rooms 232 & 233 to receive CWT-1 as indicated on the finish plans, refer to IN102C. Paint is indicated on the walls above the large format tile, U.N.O. Showers to have a shower pan, refer to specification section 22 00 00. Basis of design- shower pan to be acrylic, integral flange, center drain with removable drain cover and one piece construction. Will indicate extents of tile and the shower pan product specification for the next amendment.

Bidder Inquiry 8952915: CH-1 and CH-2 shown to require both 400A and 600A disconnects. Which is correct?

Government Response to 8952915: Please provide clarification. The sheet referenced is not part of the project drawing set and/or the comment is not an issue or applicable to the project.

Bidder Inquiry 8952922: EF-3 is shown to require #8 and #10 branch circuits protected by 80A fuses and a 40A breaker. Which is correct?

Government Response to 8952922: Please provide clarification. The sheet referenced is not part of the project drawing set and/or the comment is not an issue or applicable to the project.

Bidder Inquiry 8952925: DC-3 is shown to require #8 and #3 branch circuits. Which is correct?

Government Responst to 8952922: Please provide clarification. The sheet referenced is not part of the project drawing set and/or the comment is not an issue or applicable to the project.

Bidder Inquiry 8952930: Is wireless allowed as an alternate for Lighting Control? One benefit you can promote here is that with the project requiring lighting control sensors to be tied into the BMS for HVAC control, a wireless system can save a significant amount of labor and material since all sensors are wireless. Only the central gateway (maybe 2-3 for this job) needs to be tied back to the BMS and can work with any BMS protocol; BACnet IP and MS/TP, Metasys, Lonworks, and MODBUS as well as integrate with AV systems.

Government Response to 8952930: Due to cybersecurity requirement, wireless control is not currently allowed.

Bidder Inquiry 8952932: The controls details show individual fixture control for interior spaces and zoned control outside of the secured perimeter. This is essentially the entire project minus a small section of utility rooms on sheet EL-101C. Individual control will get very expensive. It requires every fixture to have individual dimming controllability which I've never seen used. We would typically provide a zoned approach – which would give the rooms or created "zones" controllability. This we can do either way you want....again the individual is probably 2x- 3x the project cost.

Government Response to 8952932: Please clarify which control detail is being referred? The lighting controls riser diagram on sheet E-604 is a common or typical for a networked lighting controls. The construction documents information including specifications are showing the requirement, functions and capabilities. I understand that different lighting controls manufacturer can achieve similar results with different equipment or method.

The lighting controls design is based on digital controls that have integral units inside each of the fixtures. This allows for ease of installation and future programing flexibility. The project also includes tunable white LED lighting which does require the digital controls. There are many different manufactures that can provide this lighting controls concept. 2x to 3x does not accurately represent additional material cost, as we expect there to potentially be some savings when compared to non-integral digital lighting controls after factoring in total installation costs. The material cost adder is minimal.

Bidder Inquiry 8953238: Specification Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, 2.18 Amplifiers, Preamplifiers, Tone Generators states: Submit data to indicate that the amplifiers have sufficient capacity to simultaneously drive all notification speakers at the maximum rating plus 50 percent spare capacity. The requirements to supply 50% capacity over the maximum device capability increases the cost of the project, adds unneeded equipment to the project and increases the maintenance cost of the completed installation. The Unified Facilities Guide specification 1.9.1.8 lists requirements for amplifier spare capacity to simultaneously drive all notification speakers at their tapped settings plus 25 percent spare capacity. Other sections of this specification require the systems to provide 50% spare capacity beyond the design of the system and is not related to the capabilities of the individual devices. The audible system as designed will be set to provide proper audibility and intelligibility levels for the project. We would request the specification read in line with other sections of this same specification and allow a 50% spare capacity over the designed settings.

Government Response to 8953238: Per 28 31 76, 2.18, Amplifiers shall have sufficient capacity to simultaneously drive all notification speakers at the maximum rating plus 50 percent spare capacity.

Bidder Inquiry 8953572: Please see attached for an RFI from one of our vendors.

Text from the attached RFI - We would request consideration of the following specification clarification.

Specification Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, 2.18 Amplifiers, Preamplifiers, Tone Generators states: Submit data to indicate that the amplifiers have sufficient capacity to simultaneously drive all notification speakers at the maximum rating plus 50 percent spare capacity. The requirements to supply 50% capacity over the maximum device capability increases the cost of the project, adds unneeded equipment to the project and increases the maintenance cost of the completed installation. The Unified Facilities Guide specification 1.9.1.8 lists requirements for amplifier spare capacity to simultaneously drive all notification speakers at their tapped settings plus 25 percent spare capacity. Other sections of this specification require the systems to provide 50% spare capacity beyond the design of the system and is not related to the capabilities of the individual devices. The audible system as designed will be set to provide proper audibility and intelligibility levels for the project. We would request the specification read in line with other sections of this same specification and allow a 50% spare capacity over the designed settings.

Government Response to 8953572: Per 28 31 76, 2.18, Amplifiers shall have sufficient capacity to simultaneously drive all notification speakers at the maximum rating plus 50 percent spare capacity.

Bidder Inquiry 8954046: Interior plans do not indicate WCT in Vestibule but RCP indicates WCT. Please confirm WCT is in Vestibule per RCP.

Government Response to 8954046: Confirmed, WCT is in the vestibule per RCP. Will update room finish tag in on sheet IN101A for the next amendment.

Bidder Inquiry 8954049: Please confirm contractor shall furnish and install all furniture indicated on IF plans and detailed in Amendment 02 Furniture Specification Package.

Government Response to 8954049: All furniture indicated on IF plans and detailed in Amendment 02 is contractor furnished and installed.

Bidder Inquiry 8954433: WE HAVE BEEN NOTIFIED BY THE DEMOUNTABLE PARTITION

MANUFACTURER THAT THE SPECIFIED DOOR HARDWARE SETS HW#22 , 41, & 49 IS NOT

COMPATIBLE WITH THE ALL GLASS DOORS, MANUFACTURERS STANDARD LOCKING AND

CLOSERS MUST BE USED. PLEASE ADVISE ON HOW TO PROCEED.

Government Response to 8954433: Provide hardware from Demountable System manufacturer provided hardware is compliant with required door operation as stated in specification. Revised section 08 71 00 addressing HW Sets 22, 38, 41 and 49 will be included in next Amendment.

Bidder Inquiry 8954436: DOOR SCHEDULE A-602 CALLS FOR DOOR 203.2 RECEIVE HARDWARE SET

#39, HARDWARE SPECIFICATION SAYS HARDWARE SET #39 IS NOT USED. PLEASE ADVISE

Government Response to 8954436: Door 203.2 should receive hardware set #49.

Bidder Inquiry 8954439: DOOR SCHEDULE A-602 CALLS FOR DOOR 212 RECEIVE HARDWARE SET #42

HARDWARE SPECIFICATION SAYS HARDWARE SET #42 IS NOT USED. PLEASE ADVISE

Government Response to 8954439: Door 212 Should receive hardware set #23.

Bidder Inquiry 8954440: INTERIOR STOREFRONT SCHEDULE ON A-607 CALLS FOR ALL GLASS PARTITIONS S208 & S209 TO HAVE GLASS TYPE GL-6 GLASS TYPE GL-6 IS NOT FOUND IN THE

ARCHITECTURAL DRAWINGS OR SPECIFICATIONS.

Government Response to 8954440: Sheet A-607: Storefront 213 & 215 should contain GL-5. GL-5 will be used in STC 40 Double-pane demountable partitions and door systems. GL-6: Clear Laminated Glass; Minimum Thickness of each Glass Ply: 1/4 inch ; Interlayer Thickness: 0.030 inch; Used in STC 45 double-pane demountable partition system. GL-8 will be assigned to doors in STC 45 Double-pane systems. GL-8: Clear Laminated glass; Minimum Thickness of each glass ply: 3/16 inch; Interlayer thickness 0.030 inch. Specification 08 81 00 will be provided as part of the next amendment. See attached for Door Glazing Revisions. Revised Door Schedule will be provided as part of next amendment.

Bidder Inquiry 8959350: DA-1 and DA-2 are shown in Furniture schedule but not shown or quantified. How many of each shall be included in bid?

Government Response to 8959350: Quantity for DA-1 is 488 and Quantity for DA-2 is 32. Although these numbers need to be confirmed prior to ordering.

Bidder Inquiry 8959357: WCT-1 is not included in specifications. Please provide specs.

Government Response to 8959357: The wood ceiling panel is the same product as the wood wall panel. Refer to specification 06 42 00 for specific product information. Refer to detail C6/A-532 for the typical ceiling detail for the wood ceiling panel. Refer to specification 09 51 00 for the heavy duty t-rail and hangers.

Bidder Inquiry 8959365: TVs are shown on plans. Please clarify if contractor is to furnish and install TVs.

Government Response to 8959365: Monitors are shown on the floor plans for reference only. There are no monitors included in this contract.

Bidder Inquiry 8961264: For Volume I – TAB D Small Business Participation Plan: 5.4.1.2 Small Business Plan and commitment "Small Business Participation Plan and commitment. A Small Business Participation and Commitment document specifies the offerors level of commitment to small business utilization in performance of this requirement. A Small Business Participation and Commitment Document is required from all offerors." Does

5.4.1.2 Small Business Plan and Commitment require a separate document in addition to Attachment 7 (5.4.1.2.1 Small Business Participation Plan) and a narrative (5.4.1.2.2 Narrative)?

Government Response to 8961264: No. 5.4.1.2.1 and 5.4.1.2.2 outline the requirements for the Small Business Participation Plan. Offerors shall provide fully filled out Attachment 7 (in accordance with 5.4.1.2.1) and a narrative (in accordance with the solicitation section 5.4.1.2.2).

Bidder Inquiry 8965340: 20190411_Furniture_specification_package_Amendment_2 includes IF plans with note #1 that indicates furniture and equipment to be provided and installed by Government. Please confirm IF drawings in Amendment 03 are correct furniture plans and shall be Contractor Furnished and Contractor Installed.

Government Response to 8965340: Amendment 2 included the IF Series with general note #1 stating that Furniture and equipment is to be provided and installed by general contractor (CFCI) U.N.O.

Bidder Inquiry 8968982: Please provide clarification if the course at elevation +23'4" is a brick soldier course or a cast stone panel course. E1/A-201 appears to have it drawn as cast stone. A7/A-313 appears to have it called out as a soldier course brick veneer. B5 & B9 / A-210 has the course called out as a cast stone panel. Please advise.

Government Response to 8968982: The Feature in question should be a cast stone panel course.

Bidder Inquiry 8969736: SPECIFICATION 102219.2.1.1 CALLS CERTIFICATION OF THE DEMOUNTABLE

/ ALL GLASS PARTITIONS TO HAVE A CLASS A FLAME SPREAD RATING IN CONFORMANCE WITH

ASTM E84. PLEASE CLARIFY IF FIRE RATING IS AN ACTUAL REQUIREMENT.

Government Response to 8969736: Per Life Safety plans a Fire Rating is not required. Section 2.1.1 will be removed from specification in the next amendment.

Bidder Inquiry 8969767: The bid documents show single workstations but the floorplan is showing larger clusters of typicals. I would like to confirm that the clusters are the individual desks placed together and not full systems typicals needing frames and integrated power? If yes to frames please provide that information along with electrical requirements.

Government Response to 8969767: Refer to sheet IF-401 for workstation typicals. Workstations are freestanding components and are not supported by furniture system panels.

Bidder Inquiry 8969772: If we quote laminate storage almost everything will need to be special. Would 9900s metal storage be an acceptable alternative?

Government Response to 8969772: F-1 thru F-4 have metal finishes. Whoever manufacturers 9900s metal storage series can match the basis of design specification, than that is an acceptable alternative.

Bidder Inquiry 8969776: The desk specs show freestanding electric height adjustable tables that require power, where/how will this be supplied without frames?

Government Response to 8969776: Refer to EP drawing series, keyed note #1. Dedicated quadruplex receptacles within the floor box for workstation power.

Bidder Inquiry 8969777: Some of the typicals show transaction tops. Are these fundamental to the bid submission?

Without frames it might not be a viable design element.

Government Response to 8969777: WS-2 and WS-2a are required to have a transaction top. The typicals provided is a solution that multiple furniture manufacturers can provide. WS-2a is located in the 363 ISRW COMMAND

SUITE & WAITING AREA, SUITE 102.

Bidder Inquiry 8969786: Two stage or three stage height adjustable desks?

Government Response to 8969786: Three stage height adjustable desk.

Bidder Inquiry 8969789: Are pedestal accessories to be included in the bid pricing?

Government Response to 8969789: Confirmed, please provide pedestal accessories in the bid pricing.

Bidder Inquiry 8969801: Are the fabric choices called out firm? Should we price our basic Gr.A/1 fabrics of price fabrics as COM?

Government Response to 8969801: The upholstery selected are used as a basis of design. Alternatives will be accepted if they meet the basis of design specifications. Please refer to Section 4- Basis of Design or Equal Finish Specifications.

Bidder Inquiry 8969806: The bid asks for an 8 port power switch cord, would our standard power bar with 6 outlets be an acceptable alternative?

Government Response to 8969806: The 8 port power was an end user request due to the amount of equipment on individuals desk. Maintain the 8 port power requirement.

Bidder Inquiry 8969810: Are metal cases with laminate drawer fronts acceptable within the workstation typicals?

Government Response to 8969810: No.

Bidder Inquiry 8969814: Are metal cases with Nuform drawer fronts acceptable within the workstation typicals?

Government Response to 8969814: No.

Bidder Inquiry 8969819: Are Nuform worksurfaces acceptable in place of laminate? (Nuform is a thermofoil wrap available in woodgrain or solid finishes) Government Response to 8969819: Yes. As long as it meets the minimum durability and sustainability requirements of the basis of design.

Bidder Inquiry 8969863: Please confirm final design and quantity for each WS?2, WS?2a.

Government Response to 8969863: Qty (1) of WS-2a located in the 363 ISRW COMMAND SUITE & WAITING AREA, SUITE 102. Qty (6) of WS-2.

Bidder Inquiry 8969935: Please confirm construction for storage pieces in the WS workstations. If laminate case and laminate front, will you accept a steel/metal case with laminate fronts?

Government Response to 8969935: No, steel/metal case with laminate fronts will not be acceptable.

Bidder Inquiry 8969936: Please clarify height range for height adjustable units both in WS (workstations) and D0 (private offices)

Government Response to 8969936: Workstation height adjustable range is 25"-50". Private Office height adjustable range is 26"-48”.

Bidder Inquiry 8969937: Please provide height of storage units in WS?1, WS?1.b.

Government Response to 8969937: Freestanding storage unit height is 24".

Bidder Inquiry 8969938: Consider accepting nominal difference for worksurfaces +/? 2" Government Response to 8969938: The nominal dimension cannot exceed the basis of design dimension.

However, it is acceptable to be 2" smaller in the overall dimensions only. If adjustments are made, coordination will need to be required to make sure all furniture components work with one another.

Bidder Inquiry 8969939: F?1, F?2, F?3, Consider accepting alternate heights. Would 66"H or 72"H be acceptable?

Government Response to 8969939: Units are already 72" high, however 66"H would be acceptable for those furniture components.

Bidder Inquiry 8969941: F?1, F?2, F?3, Consider accepting nominal difference for bookcase depth +/? 1" Government Response to 8969941: The nominal dimension cannot exceed the basis of design dimension.

However, it is acceptable to be 2" smaller in the overall dimensions only. If adjustments are made, coordination will need to be required to make sure all furniture components work with one another.

Bidder Inquiry 8969942: F?5, Consider accepting alternate depth of 18" Government Response to 8969942: 18" depth is acceptable for this furniture components. Make sure the depth for the cabinet and common worksurface top are the same.

Bidder Inquiry 8969943: If paint, laminates, and fabrics selections are proprietary to basis of design manufacturers, will you accept alternate, but similar alternates?

Government Response to 8969943: Yes. As long as it meets the minimum requirements of the basis of design.

Bidder Inquiry 8971121: In paragraph 1.9.2 of Section 011200, was the indicated Stormwater Management Plan (SWM) prepared during the design phase as indicated? If so, please confirm that Contractor will not have to prepare a new plan. In paragraph 1.9.3 of Section 011200, the Stormwater Pollution Prevention Plan (SWPPP) is addressed.

It appears that this plan has been previously prepared by the design team as indicated on Drawings CG001-CG003.

Please confirm that the Contractor will not need to prepare a new plan for submission to DEQ.

Government Response to 8971121: Paragraph 1.9.2: Response: Yes, there is a VDEQ approved SWM Plan for the project. The Contractor is responsible for implementing the SWM plan and its design features as shown in the approved plan. Should the Contractor deviate from the approved SWM plan, the Contractor could be required to prepare a new plan and submit to VDEQ for approval. Paragraph 1.9.3: Response: An approved Erosion and Sediment Control Plan and Stormwater Management Plan have been provided in the construction plans. As stated in paragraph 1.9.3, the Contractor shall develop a site specific Pollution Prevention (P2) Plan in accordance with 9VAC25-870-56. The P2 Plan must identify potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site and a description of control measures that will be used to minimize pollutants in stormwater discharges from the construction site must be developed before land disturbance. This plan shall be included in the Contractor's SWPPP submittal.

Bidder Inquiry 8971594: • Spec Section 22 00 00 Paragraph 2.13 Water Pressure Booster System o Sequence of Operation (Last Paragraph in this spec section) – This section states "Lead pump runs continuously".

Does the system require 1 pump to operate all the time? If so, what is the minimum continuous flow demand?

o Control Panel Components Paragraph a - Please confirm RS422 is required. Will RS485 RTU be acceptable to connect to RS422?

Government Response to 8971594: Pump(s) are design to operate on demand, not continuously. Sequencing of pumps from lead to lag shall be as specified. Also refer to Control Panel Components, paragraph D & C.

Providing RS485 RTU is acceptable.

Bidder Inquiry 8971748: Specification Section 026000 indicates that the MRA/MRS boundaries are per the Figure A-1 attachment at the end of the section. Drawings CD101 & CD102 indicate that the MRA/MRS boundaries are in the same location as Figure A-1. However, in the Figure 2 MRS Map included in the Explosive Safety Submission Report, dated October, 2018,the MRS/MRA boundaries extend to the areas of the previously existing buildings and parking lots as well. Please clarify which MRA/MRS boundaries are applicable to the project.

Government Response to 8971748: The MRA/MRS boundaries shown in the Explosive Safety Submission are correct. The plans and specs are amended to reflect this clarification.

Bidder Inquiry 8976105: Should the private office desks and tables be quoted in laminate or wood veneer?

Reference FF&E tags D1, D2, D3, D3a, D3b, D4, D4a, D4b, T-1, T-1.a, T-3, T-4, T-5, T-6, T-8, T-12, T-13, T-14, T-2 & T-9 are specified with a veneer top, and T-7 is specified with a laminate top so we don't need to ask the question about those.

Government Response to 8976105: Private office desks and tables should be quoted in wood veneer.

Bidder Inquiry 8976106: The details on plan sheet A-545 show double-glazed and butt-glazed. Is there a preference?

Government Response to 8976106: Details on Sheet A-545 are showing a double-glazed or dual-pane demountable system. Any reference to butt-glazed would be referring to the glazing joint (between two panes of glazing).

Bidder Inquiry 8976108: STC ratings are not consistent across the plans and specifications. Specification section 102219 indicates single-glazed are 35 and double glazed are 45, plan sheets A-606 and A-607 indicate STC 40 in the storefront schedules, and plan sheets A-601 and A-602 indicates STC 30, 40, and 45 at various locations in the door schedules. Which STC rating requirements are correct?

Government Response to 8976108: Sheet A-601 & A-602 indicates the minimum STC Rating of doors at various locations. These are correct and components for each door should meet the minimum STC rating. Sheet A-606 and A-607 indicates the minimum STC rating of the demountable / storefront system. These are also correct. STC of doors and walls will not always match, but ratings for each must be met. In many cases the glazing type of the door will match the adjacent demountable system (for consistency) even if an STC rating is not required.

Spec Section 102219 has been updated to remove the STC certifications for a STC 35 single-glazed panel system.

Certifications for minimum STC 40 has been added (along with the existing STC 45 certification) for the double glazed panel system. A revised spec section will be provided in next Amendment.

Bidder Inquiry 8976109: The door schedules on plan sheets A-601 and A-602 indicate some of the doors are door type "DG" with glass type GL-6. Is door type "DG" a framed or frameless door? Also, glass type GL-6 is not defined. What type of glass is this?

Government Response to 8976109: DG is a framed door as shown on Sheet A-603. Door Stiles should be wide enough to accommodate door hardware and control access components. GL-6 was defined in Amendment 006 Spec Section 08 81 00. Revisions to paragraph 2.3.4 Doors and Frames in Specification 10 22 19 will be included in the next Amendment.

Bidder Inquiry 8976110: What is the veneer type required for the wood doors in the demountable partitions?

Government Response to 8976110: Veneers should match paragraph 2.1.1.1 of Spec Section 08 14 00 Wood Door which states, hardwood veneers must be quarter sliced, slip matched to match wood wall system.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

A. DESCRIPTION OF THE PROJECT

The Air Force Targeting Center Facility (TCF) project will provide a suitable facility to support the Air Force (AF) Program Action Directive (PAD) 14-02 direction to standup a new Intelligence, Surveillance, and Reconnaissance Wing (ISRW) providing 24/7 mission capability for Command and Control (C2) of AF Target and Threat Analysis, and meet the intent for a single reach-back targeting threat and analysis capability for the United States (US) Air Force.

The project will construct a new Targeting Center facility for the 25th AF utilizing conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), Air Force, and Langley Design Guide standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200- 02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01.

The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking and all necessary supporting facilities.

B. ACQUISITION APPROACH

The acquisition approach is to solicit for a competitive Single Award stand-alone construction contract using full and open competition. The basis of award will use the Best Value Trade-off process, as authorized by FAR

15.101.1. Award will be made to the Offeror whose proposal represents the best overall value and has been determined to be the most beneficial to the Government. The Government has the right to accept other than the lowest offer or other than the highest technically rated offer. The solicitation will be issued as a Design-Bid-Build, unrestricted contract.

C. OFFEROR’S QUESTIONS AND COMMENTS

NOTE: All questions and/or comments should reach the above referenced Contracting Office via ProjNet no later than 5:00 PM (EST), 20 December 2020, in order that they may be given consideration or actions taken prior to receipt of offers.

SPECIFIC INSTRUCTIONS: Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review inquiry items, offerors will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click <continue>. From this page you may view all inquiries or add inquiry. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W9123621R2005 The Bidder Inquiry Key is: ZZI3QK-C9XYEY

The Bidder Inquiry System will be unavailable for new inquiries at 5:00 PM (EST), 20 December 2020, in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8am to 5pm U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1. OVERVIEW

1.1 The purpose of these instructions is to establish a uniform procedure for evaluating proposals by the Source Selection Evaluation Board (SSEB) and making a Best Value decision by the Source Selection Authority (SSA) using the Best Value Tradeoff Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform the resulting contract, the proposal shall be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

1.2 The Government will conduct a Best Value Tradeoff of four evaluation factors. The factors are as follows:

Non – Price Factors Factor 1 – Specialized Experience Factor 2 – Past performance Factor 3 – Small Business Participation Plan Factor 4 – Price

The relative order of importance of the evaluation factors is Factor 1 and Factor 2 are approximately equal importance to each other; Factor 3 is less important than Factor 1 or Factor 2. When the proposal is evaluated as a whole, the non-price factors, when combined, are considered approximately equal to price.

The SSA will select the source whose proposal offers the best value to the Government in accordance with the evaluation criteria and basis of award stated in the solicitation. If award is not made on initial offers, the SSA will determine the competitive range, authorize discussions with only those Offerors determined to be in the competitive range and document the decision through approval of the Competitive Range Decision Document (CRDD).

Upon completion of the evaluation of final proposal revisions submitted by the Offerors in the competitive range, or if award is made on initial offers, the SSA will select the Offeror whose proposal offers the best value to the Government. This decision will be documented to include the rationale for any business judgments and trade-offs made or relied on and the benefits associated with additional costs in the Source Selection Decision Document

(SSDD).

2.0 GENERAL INSTRUCTIONS

2.1 Any legally organized Offeror who agrees to follow the conditions of the RFP may submit a proposal.

2.2 Do not submit any materials not required by this solicitation (such as company brochures, etc.).

2.3 The Government is not liable for any costs incurred by the Offerors submitting an offer in response to this solicitation.

2.4 Offerors are cautioned that “parroting” of the requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of their proposal. Failure to provide sufficient detail may result in an unacceptable rating. Proposals received will be considered proprietary information and shall be clearly marked as such by the Offeror.

2.5 Proposal Submission Requirements:

2.5.1 Proposals shall be submitted electronically as specified herein. Mailed in or hand carried proposals will not be considered.

Due to the current COVID-19 pandemic, all proposals shall be submitted electronically through the DoD SAFE website. Offerors are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If an offeror attempts to transmit a large number of files, recommend that combining or ZIP files before uploading to the DoD SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission. It is Offerors’ responsibility to check with DoD SAFE to ensure successful submission. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

Accordingly, the Norfolk District will NOT accept proposals by mail, hand-carry, or commercial courier (that is, no physical proposals will be accepted in response to this solicitation). All proposals must be submitted by electronic commerce only (that is, by submission through DoD SAFE, as discussed below, only).

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

2.5.2 SPECIAL ELECTRONIC PROPOSAL SUBMISSION INSTRUCTIONS DUE TO COVID-19

Electronic Proposal Submission in DoD SAFE In accordance with FAR 15.203(c), Electronic commerce may be used to issue RFPs and to receive proposals, modifications, and revisions when contracting by negotiation. Proposals will be submitted through DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). All proposals must be uploaded into DoD SAFE infrastructure not earlier than 04 January 2021, and not later than (NLT) 07 January 2021, at 2:00 p.m. Eastern Standard Time (EST).

Request for Upload Code Offerors will require a unique “request code” to upload proposals into DoD SAFE, which shall be obtained only by email to POC: Axel Doody at axel.f.doody@usace.army.mil, and cc: PPMDContracts@usace.army.mil and Tarik Booze at Tarik.a.booze@usace.army.mil. The email request for the “request code” must be emailed to the POC NLT 07 January 2021, at 12:00 p.m. EST.

The OFFEROR IS SOLELY RESPONSIBLE for ensuring that the entire proposal has been received into DoD SAFE with a timestamp NLT 2:00 p.m. EST on 07 January 2021.

Electronic Proposal Organization and Format The Offeror shall organize the proposal as set forth in details of the solicitation. The titles and contents of the volumes, as well as the page limitations and number of required copies must be submitted as specified in the solicitation. In the event that solicitation conflicts with the detailed instructions in the paragraphs that follow, the detailed instructions shall take precedence.

The Offeror shall address the factors, sub factors, and their related elements as provided in the solicitation. Be clear, concise, and include detailed explanations for substantiating the validity of stated assertions. Extraneous, repetitious, or wordy submissions are not desired and could result in lower ratings. Elaborate brochures or documentation, detailed artwork, or other embellishments are unnecessary and are not desired. No models, mockups, or videos will be accepted. It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal submitted into DoD SAFE. Please forward a copy of this confirmation of receipt to POC:

Axel Doody at axel.f.doody@usace.army.mil, and cc: Tarik Booze at Tarik.a.booze@usace.army.mil and PPMDContracts@usace.army.mil

Electronic files shall be clearly identified for each volume, section, and item. Title the file(s) in the following format:

W9123621R2005_COMPANY NAME_VOLUME I

W9123621R2005_COMPANY NAME_VOLUME II

Any questions regarding electronic proposal submission should be directed to the contracting office via ProjNet.

NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII) in the File Description.)

Offerors are STRONGLY encouraged to avoid waiting until the last minute to attempt to transmit their proposals.

Receipt of Submissions For the purposes of establishing whether a proposal submission is considered timely, the government considers the date and time the submission is completely uploaded in the DoD SAFE website. For proposals larger than the 2GB capacity of the DoD SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the DoD SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. The electronic proposal submittal contents shall conform to the details of the solicitation and subsequent amendments.

SPECIAL PROVISION IN RESPONSE TO CORONOVIRUS…