This solicitation is for the construction of the Air Force Targeting Center Facility at Langley Air Force Base in Virginia. The Air Force seeks to build a new facility to support the Intelligence, Surveillance, and Reconnaissance Wing and provide 24/7 mission capability for command and control of targeting and threat analysis. The facility will be designed according to Department of Defense and Air Force standards and utilize local construction materials and techniques where cost-effective. It must comply with minimum antiterrorism standards and include emergency generators, site improvements, special foundations above mean high tide, parking, and supporting facilities. The Army Corps of Engineers District in Norfolk, Virginia issued the solicitation on behalf of the Air Force. Responses are due by the date listed in the solicitation number provided.
View the file
Other files for this federal contract opportunity
Show all 50
Air Force Targeting Center, Langley AFB - Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
Air Combat Command
Ready to Advertise (RTA) AF Targeting Center
SPECIFICATIONS
Volume 1 – Divisions 00 – 06
Solicitation Number W91236-21-R-2005
(UNCLASSIFIED//FOUO)
Joint Base Langley-Eustis, Hampton, VA
November 24
THIS PAGE INTENTIONALLY LEFT BLANK
Air Force Targeting Center - Ready to Advertise (RTA) AFTARGETINGCTR Joint Base Langley-Eustis, Hampton, VA November 24, 2020
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 06 00 REGULATORY REQUIREMENTS
01 11 00 SPECIAL CONDITIONS
01 11 00.01 CONSTRUCTION SECURITY PLAN
01 12 00 ENVIRONMENTAL MANAGEMENT SPECIAL CONDITIONS
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00.00 50 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 02.00 50 TEMPORARY CONSTRUCTION FACILITIES
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 60 00 MUNITIONS & EXPLOSIVES DISCOVERY & REMOVAL
DI VI SI ON 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
04 72 00 CAST STONE
DI VI SI ON 05 - METALS
05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
PROJECT TABLE OF CONTENTS Page 1
UNCLASSIFIED\\FOUO
05 52 00 METAL RAILINGS
05 72 00 DECORATIVE METAL SPECIALTIES
05 73 13 GLASS SUPPORTED RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 16 43 GYPSUM SHEATHING
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 42 00 PREFINISHED WALL PANELS
06 61 16 SOLID SURFACING FABRICATIONS
06 61 17 DECORATIVE POLYMER FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 14 00 FLUID-APPLIED WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 23 00 FABRIC LINER
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 43 ALUMINUM COMPOSITE MATERIAL (ACM) SYSTEM
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 02 BULLET-RESISTANT COMPONENTS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 39 54 BLAST RESISTANT DOORS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 55 56 BLAST RESISTANT GLAZING AND DOOR SYSTEMS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 33 DECORATIVE FILM
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 16 NON-STRUCTURAL METAL FRAMING
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 72 00 WALLCOVERINGS
PROJECT TABLE OF CONTENTS Page 2
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DI VI SI ON 11 - EQUI PMENT
11 13 21 SCISSOR LIFT
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 92 36 VEGETATED WALL SYSTEMS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 25 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING SYSTEMS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
PROJECT TABLE OF CONTENTS Page 3
25 05 11.00 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
UTILITY MONITORING AND CONTROL SYSTEMS
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE
AND LIFE SAFETY SYSTEMS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
CONVEYANCE / VERTICAL TRANSPORT SYSTEM
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
ELECTRICAL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA
CAPACITY
26 32 34.00 23 POWER DISTRIBUTION UNIT (PDU)
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 TELECOMMUNICATIONS BUILDING CABLING SYSTEMS STANDARDS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 62 13.20 PRECAST/PRESTRESSED CONCRETE PILES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 18 PRE-FABRICATED ORNAMENTAL ALUMINUM FENCE
PROJECT TABLE OF CONTENTS Page 4
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION AND DOMINION ENERGY
CONDUIT SPECIFICATION
33 82 00 OUTSIDE PLANT TELECOMMUNICATIONS CABLE INSTALLATION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
PROJECT TABLE OF CONTENTS - APPENDICES
APPENDIX
APPENDIX A
TEST HOLE DATA
-- End of Specification Appendices --
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Sheet Sheet Number Name
VOLUME 1 - SI TE, STRUCT. , ARCH.
G-001A COVER SHEET
G-002A INDEX OF DRAWINGS - VOL. 1 - SITE, STRUCT., ARCH.
V-100 KEY PLAN
V-101 EXISTING CONDITIONS PLAN
V-102 EXISTING CONDITIONS PLAN
V-103 SURVEY INFORMATION
V-104 BORING PLAN
V-105 BORING PLAN
V-106 TEST HOLE DATA SHEET
CD-101 DEMOLITION PLAN
CD-102 DEMOLITION PLAN
CG-001 STORMWATER POLLUTION PREVENTION PLAN
CG-002 STORMWATER POLLUTION PREVENTION PLAN
CG-003 STORMWATER POLLUTION PREVENTION PLAN
CG-011 EROSION AND SEDIMENT CONTROL NOTES
CG-101 EROSION & SEDIMENT CONTROL PLAN PHASE I
CG-102 EROSION & SEDIMENT CONTROL PLAN PHASE I
CG-103 EROSION & SEDIMENT CONTROL PLAN PHASE II
CG-104 EROSION & SEDIMENT CONTROL PLAN PHASE II
CG-111 EROSION & SEDIMENT CONTROL DETAILS
CG-112 EROSION & SEDIMENT CONTROL DETAILS
CG-113 EROSION & SEDIMENT CONTROL DETAILS
CG-121 STORMWATER MANAGEMENT PLAN
CG-122 STORMWATER MANAGEMENT PLAN
CG-131 GRADING PLAN
CG-132 GRADING PLAN
CG-133 GRADING PLAN - BID ALTERNATE 0002A
CG-134 GRADING PLAN - BID ALTERNATE 0002A
CG-135 GRADING PLAN - BID ALTERNATE 0002C
CG-136 GRADING PLAN - BID ALTERNATE 0002C
CG-137 GRADING PLAN - BID ALTERNATE 0002A AND 0002C
CG-138 GRADING PLAN - BID ALTERNATE 0002A AND 0002C
C-101 SITE PLAN
C-102 SITE PLAN
C-103 SITE PLAN - BID ALTERNATE 0002A
C-104 SITE PLAN - BID ALTERNATE 0002A
C-105 SITE PLAN - BID ALTERNATE 0002C
C-106 SITE PLAN - BID ALTERNATE 0002C
DOCUMENT 00 01 15 Page 1
Sheet Sheet Number Name
C-107 SITE PLAN - BID ALTERNATE 0002A AND 0002C
C-108 SITE PLAN - BID ALTERNATE 0002A AND 0002C
C-111 DRAINAGE DESCRIPTIONS
C-121 ALIGNMENT GEOMETRY SHEET
C-122 ALIGNMENT GEOMETRY SHEET
C-201 SERVICE ROAD - ROADWAY PROFILE
C-211 DRAINAGE PROFILE
C-212 DRAINAGE PROFILE
C-213 DRAINAGE PROFILE
C-501 ROADWAY TYPICAL SECTIONS
C-502 SITE DETAILS
C-503 SITE DETAILS
C-504 SITE DETAILS
C-505 SITE DETAILS
C-506 SITE DETAILS
C-507 SITE DETAILS
CU-101 WATER & SEWER UTILITES PLAN
CU-102 WATER & SEWER UTILITES PLAN
CU-501 WATER & SEWER UTILITY DETAILS
CU-502 WATER & SEWER UTILITY DETAILS
X-001 SIGNING AND PAVEMENT MARKING NOTES, LEGEND
X-002 TRAFFIC DETAILS
X-101 SIGNING AND PAVEMENT MARKING PLAN
X-102 SIGNING AND PAVEMENT MARKING PLAN
X-200 MAINTENANCE OF TRAFFIC NOTES / HAUL ROUTE
L-001 MASTER PLANT SCHEDULE, PLANTING DETAILS AND GENERAL NOTES
L-101 LANDSCAPE PLANTING PLAN
L-102 LANDSCAPE PLANTING PLAN
L-103 LANDSCAPE PLANTING PLAN - BID ALTERNATE 0002B
L-104 LANDSCAPE PLANTING PLAN - BID ALTERNATE 0002B
E-001A ELECTRICAL SYMBOLS AND ABBREVIATIONS
ES-101 ELECTRICAL POWER SITE PLAN
ES-102 ELECTRICAL LIGHTING SITE PLAN
T-001 LEGEND, NOTES, AND ABBREVIATIONS
T-002 SITE PLAN OSP ROUTING
T-003 SITE PLAN OSP ROUTING - BID ALTERNATE #0013 REDUNDANT
COMMUNICATION LINE
T-502 MANHOLE DETAILS
T-503 MANHOLE DETAILS
T-504 MANHOLE AND DUCTBANK DETAILS
LS001 CODE ANALYSIS
LS002 LIFE SAFETY SITE PLAN
LS101 OVERALL FIRST FLOOR LIFE SAFETY PLAN
LS102 OVERALL SECOND FLOOR LIFE SAFETY PLAN
S-001 GENERAL NOTES
S-002 GENERAL NOTES (CONT)
S-003 GENERAL NOTES (CONT)
S-004 SPECIAL INSPECTION
S-005 SPECIAL INSPECTION (CONT)
S-006 FIRST FLOOR LOAD PLAN
S-007 SECOND FLOOR LOAD PLAN
S-008 INTERSTITIAL LEVEL AND LOW ROOF LOAD PLAN
S-009 ROOF LOAD PLAN
S-100A FOUNDATION PLAN - AREA A
S-100B FOUNDATION PLAN - AREA B
S-100C FOUNDATION PLAN - AREA C
S-101A FIRST FLOOR FRAMING PLAN - AREA A
DOCUMENT 00 01 15 Page 2
Sheet Sheet Number Name
S-101B FIRST FLOOR FRAMING PLAN - AREA B
S-101C FIRST FLOOR FRAMING PLAN - AREA C
S-102A SECOND FLOOR FRAMING PLAN - AREA A
S-102B SECOND FLOOR FRAMING PLAN - AREA B
S-102C SECOND FLOOR FRAMING PLAN - AREA C
S-103A INTERSTITIAL LEVEL FRAMING PLAN - AREA A
S-103A5 LOBBY ROOF FRAMING PARTIAL PLAN - AREA A5
S-103B INTERSTITIAL LEVEL FRAMING PLAN - AREA B
S-103C LOW ROOF FRAMING PLAN - AREA C
S-104A ROOF FRAMING PLAN - AREA A
S-104B ROOF FRAMING PLAN - AREA B
S-201 PARTIAL FRAMING PLANS
S-202 PARTIAL FRAMING PLANS
S-203 ELEVATIONS
S-204 ELEVATIONS
S-205 ELEVATIONS
S-206 SCHEDULES - CONCRETE FOUNDATIONS
S-207 SCHEDULES - CONCRETE FRAMING
S-208 SCHEDULES - STEEL COLUMNS
S-209 SCHEDULES - STEEL COLUMNS
S-210 SCHEDULES - STEEL FRAMING
S-301 CONCRETE - FOUNDATION DETAILS
S-302 CONCRETE - FOUNDATION DETAILS
S-303 CONCRETE - FOUNDATION DETAILS
S-304 CONCRETE - TYPICAL DETAILS
S-305 CONCRETE - TYPICAL DETAILS
S-306 CONCRETE - TYPICAL DETAILS
S-307 CONCRETE - SECTIONS AND DETAILS
S-308 CONCRETE - SECTIONS AND DETAILS
S-309 CONCRETE - SECTIONS AND DETAILS
S-310 CONCRETE - SECTIONS AND DETAILS
S-401 MASONRY - TYPICAL DETAILS
S-402 MASONRY - TYPICAL DETAILS
S-501 STEEL - TYPICAL DETAILS
S-502 STEEL - TYPICAL DETAILS
S-503 STEEL - TYPICAL DETAILS
S-504 STEEL - TYPICAL DETAILS
S-505 STEEL - TYPICAL DETAILS
S-506 STEEL - TYPICAL DETAILS
S-507 NOT USED
S-508 STEEL - TYPICAL DETAILS
S-509 STEEL - SECTIONS AND DETAILS
S-510 STEEL - SECTIONS AND DETAILS
S-511 STEEL - SECTIONS AND DETAILS
S-512 STEEL - SECTIONS AND DETAILS
S-513 STEEL - SECTIONS AND DETAILS
S-514 STEEL - SECTIONS AND DETAILS
S-515 STEEL - SECTIONS AND DETAILS
S-516 STEEL - SECTIONS AND DETAILS
S-517 STEEL - SECTIONS AND DETAILS
S-518 STEEL - SECTIONS AND DETAILS
S-519 STEEL - SECTIONS AND DETAILS
S-520 STEEL - SECTIONS AND DETAILS
S-700 BID ALTERNATE #0001A
A-001 ABBREVIATIONS
A-002 ABBREVIATIONS
A-100 ARCHITECTURAL SITE PLAN
DOCUMENT 00 01 15 Page 3
Sheet Sheet Number Name
A-101 FIRST FLOOR PLAN - OVERALL
A-101A FIRST FLOOR PLAN - AREA A
A-101B FIRST FLOOR PLAN - AREA B
A-101C FIRST FLOOR PLAN - AREA C
A-102 SECOND FLOOR PLAN - OVERALL
A-102A SECOND FLOOR PLAN - AREA A
A-102B SECOND FLOOR PLAN - AREA B
A-102C SECOND FLOOR PLAN - AREA C
A-103 CLERESTORY PLAN
A-104 ROOF PLAN - OVERALL
A-111 FIRST FLOOR SLAB EDGE PLAN
A-112 SECOND FLOOR SLAB EDGE PLAN
AC-101 OVERALL REFLECTED CEILING PLAN - FIRST FLOOR
AC-101A REFLECTED CEILING PLAN - FIRST FLOOR - AREA A
AC-101B REFLECTED CEILING PLAN - FIRST FLOOR - AREA B
AC-101C REFLECTED CEILING PLAN - FIRST FLOOR - AREA C
AC-102 OVERALL REFLECTED CEILING PLAN - SECOND FLOOR
AC-102A REFLECTED CEILING PLAN - SECOND FLOOR - AREA A
AC-102B REFLECTED CEILING PLAN - SECOND FLOOR - AREA B
AC-102C REFLECTED CEILING PLAN - SECOND FLOOR - AREA C
AC-103 REFLECTED CEILING PLAN - SECOND FLOOR HARD CEILINGS
A-201 OVERALL EXTERIOR ELEVATIONS
A-202 OVERALL EXTERIOR ELEVATIONS
A-210 ENLARGED ELEVATIONS - BRICK PATTERNS
A-211 ENLARGED ELEVATIONS - EXTERIOR
A-301 SECTIONS - OVERALL BUILDING
A-302 SECTIONS - OVERALL BUILDING
A-311 EXTERIOR WALL SECTIONS
A-312 EXTERIOR WALL SECTIONS
A-313 EXTERIOR WALL SECTIONS
A-321 INTERIOR SECTIONS - SHAFTS AND OPENINGS
A-401 ENLARGED PLANS AND ELEVATIONS - STAIR 1
A-402 ENLARGED PLANS AND ELEVATIONS - STAIR 2
A-403 ENLARGED PLANS AND ELEVATIONS - STAIR 3
A-404 ENLARGED PLANS AND ELEVATIONS - STAIR 4
A-405 ENLARGED PLANS AND ELEVATIONS - STAIR 5
A-406 ENLARGED PLANS AND ELEVATIONS - ELEVATORS
A-407 ENLARGED PLANS AND ELEVATIONS - ELEVATORS
A-410 ENLARGED PLANS AND ELEVATIONS - PUBLIC RESTROOMS
A-411 ENLARGED PLANS AND ELEVATIONS - SHOWERS AND NURSING ROOM
A-412 ENLARGED PLANS AND ELEVATIONS - BREAK AREAS
A-413 TYPICAL LAYOUTS & MOUNTING HEIGHTS
A-414 TYPICAL LAYOUTS & MOUNTING HEIGHTS
A-420 ENLARGED PLAN - MAIN LOBBY
A-420A ENLARGED RCP - MAIN LOBBY
A-421 INTERIOR ELEVATIONS - MAIN LOBBY
A-422 INTERIOR ELEVATIONS - MAIN LOBBY
A-425 ENLARGED PLAN - MULTI-PURPOSE
A-426 INTERIOR ELEVATIONS - MULTI-PURPOSE
A-430 INTERIOR ELEVATIONS - MAIN CORRIDOR
A-430A INTERIOR ELEVATIONS - MAIN CORRIDOR
A-431 INTERIOR ELEVATIONS - MAIN CORRIDOR
A-431A INTERIOR ELEVATIONS - MAIN CORRIDOR
A-432 INTERIOR ELEVATIONS - MAIN CORRIDOR
A-433 INTERIOR ELEVATIONS - MAIN CORRIDOR
A-434 INTERIOR ELEVATIONS
A-435 INTERIOR ELEVATIONS
DOCUMENT 00 01 15 Page 4
Sheet Sheet Number Name
A-436 INTERIOR ELEVATIONS
A-437 INTERIOR ELEVATIONS
A-440 INTERIOR ELEVATIONS - CASEWORK
A-450 ENLARGED PLAN - MECHANICAL YARD AND ENCLOSURE
A-451 DETAILS - EXTERIOR ENCLOSURE
A-501A STANDARD PARTITION TYPES
A-501B STANDARD PARTITION TYPES
A-502 PARTITION HEAD DETAILS
A-503 PARTITION FRAMING DETAILS
A-504 PARTITION BLOCKING DETAILS
A-510 DETAILS - STAIRS
A-511 DETAILS - STAIRS
A-512 DETAILS - STAIR 4
A-513 DETAILS - STAIR 4
A-515 DETAILS - ELEVATOR
A-520 DETAILS - INTERIOR
A-521 DETAILS - INTERIOR - ACOUSTIC & WOOD
A-522 DETAILS - INTERIOR - WOOD
A-522A DETAILS - INTERIOR - WOOD
A-523 DETAILS - INTERIOR - METAL & GLASS
A-524 DETAILS - INTERIOR
A-530 DETAILS - INTERIOR - CEILING
A-531 DETAILS - INTERIOR - CEILING
A-532 DETAILS - INTERIOR - CEILING
A-535 DETAILS - INTERIOR - RAISED ACCESS FLOOR
A-535A DOOR DETAILS - THRESHOLDS
A-540 DETAILS - INTERIOR - CASEWORK
A-541 DETAILS - INTERIOR - CASEWORK
A-545 DETAILS - INTERIOR - STOREFRONTS
A-550 DETAILS - EXTERIOR
A-551 DETAILS - EXTERIOR
A-552 DETAILS - EXTERIOR - PLAN
A-553 DETAILS - EXTERIOR - PLAN
A-560 DETAILS - EXTERIOR - ROOF
A-561 DETAILS - EXTERIOR - DOORS
A-562 DETAILS - EXTERIOR - LOUVERS
A-563 DETAILS - EXTERIOR - CURTAIN WALL
A-564 DETAILS - EXTERIOR - CURTAIN WALL
A-565 DETAILS - EXTERIOR - CAST STONE
A-570 DETAILS - CAST STONE SHAPES
A-590 DETAILS - BELOW-GRADE WATERPROOFING
A-601 DOOR SCHEDULE - LEVEL 1
A-602 DOOR SCHEDULE - LEVEL 2
A-603 STANDARD DOOR & FRAME TYPES
A-604 DOOR AND FRAME DETAILS
A-605 EXTERIOR STOREFRONT SCHEDULE & ELEVATIONS
A-606 INTERIOR STOREFRONTS - LEVEL 1
A-607 INTERIOR STOREFRONTS - LEVEL 2
A-700 BID ALTERNATES #0001A
I-001 INTERIOR NOTES AND FINISH LEGEND
IN101 INTERIOR FINISH PLAN - FIRST FLOOR OVERALL
IN101A INTERIOR FINISH PLAN - FIRST FLOOR - AREA A
IN101B INTERIOR FINISH PLAN - FIRST FLOOR - AREA B
IN101C INTERIOR FINISH PLAN - FIRST FLOOR - AREA C
IN102 INTERIOR FINISH PLAN - SECOND FLOOR - OVERALL
IN102A INTERIOR FINISH PLAN - SECOND FLOOR - AREA A
IN102B INTERIOR FINISH PLAN - SECOND FLOOR - AREA B
DOCUMENT 00 01 15 Page 5
Sheet Sheet Number Name
IN102C INTERIOR FINISH PLAN - SECOND FLOOR - AREA C
IF101 INTERIOR FURNITURE PLAN - FIRST FLOOR OVERALL
IF101A INTERIOR FURNITURE PLAN - FIRST FLOOR - AREA A
IF101B INTERIOR FURNITURE PLAN - FIRST FLOOR - AREA B
IF101C INTERIOR FURNITURE PLAN - FIRST FLOOR - AREA C
IF102 INTERIOR FURNITURE PLAN - SECOND FLOOR OVERALL
IF102A INTERIOR FURNITURE PLAN - SECOND FLOOR - AREA A
IF102B INTERIOR FURNITURE PLAN - SECOND FLOOR - AREA B
IF102C INTERIOR FURNITURE PLAN - SECOND FLOOR - AREA C
IF401 INTERIOR FURNITURE PLAN - FURNITURE TYPICALS
IF402 INTERIOR FURNITURE PLAN - FURNITURE TYPICALS
IF403 INTERIOR FURNITURE PLAN - FURNITURE TYPICALS
IS-101A INTERIOR SIGNAGE PLAN - FIRST FLOOR - AREA A
IS-101B INTERIOR SIGNAGE PLAN - FIRST FLOOR - AREA B
IS-101C INTERIOR SIGNAGE PLAN - FIRST FLOOR - AREA C
IS-102A INTERIOR SIGNAGE PLAN - SECOND FLOOR - AREA A
IS-102B INTERIOR SIGNAGE PLAN - SECOND FLOOR - AREA B
IS-102C INTERIOR SIGNAGE PLAN - SECOND FLOOR - AREA C
IS-200 INTERIOR SIGNAGE TYPICALS
IS-600 INTERIOR SIGNAGE SCHEDULE
VOLUME 2 - BUI LDI NG SYSTEMS
G-001B COVER SHEET
G-002B INDEX OF DRAWINGS - VOL. 2 - BUILDING SYSTEMS
M-001 MECHANICAL SYMBOLS AND ABBREVIATIONS
M-002 MECHANICAL SYMBOLS AND ABBREVIATIONS
MH101 FIRST FLOOR MECHANICAL HVAC PLAN - OVERALL
MH101A1 FIRST FLOOR MECHANICAL HVAC PLAN - AREA A1
MH101A2 FIRST FLOOR MECHANICAL HVAC PLAN - AREA A2
MH101A3 FIRST FLOOR MECHANICAL HVAC PLAN - AREA A3
MH101A4 FIRST FLOOR MECHANICAL HVAC PLAN - AREA A4
MH101B1 FIRST FLOOR MECHANICAL HVAC PLAN - AREA B1
MH101B2 FIRST FLOOR MECHANICAL HVAC PLAN - AREA B2
MH101B3 FIRST FLOOR MECHANICAL HVAC PLAN - AREA B3
MH101B4 FIRST FLOOR MECHANICAL HVAC PLAN - AREA B4
MH101C1 FIRST FLOOR MECHANICAL HVAC PLAN - AREA C1
MH101C2 FIRST FLOOR MECHANICAL HVAC PLAN - AREA C2
MH101C3 FIRST FLOOR MECHANICAL HVAC PLAN - AREA C3
MH102 SECOND FLOOR MECHANICAL HVAC PLAN - OVERALL
MH102A1 SECOND FLOOR MECHANICAL HVAC PLAN - AREA A1
MH102A2 SECOND FLOOR MECHANICAL HVAC PLAN - AREA A2
MH102A3 SECOND FLOOR MECHANICAL HVAC PLAN - AREA A3
MH102A4 SECOND FLOOR MECHANICAL HVAC PLAN - AREA A4
MH102B1 SECOND FLOOR MECHANICAL HVAC PLAN - AREA B1
MH102B2 SECOND FLOOR MECHANICAL HVAC PLAN - AREA B2
MH102B3 SECOND FLOOR MECHANICAL HVAC PLAN - AREA B3
MH102B4 SECOND FLOOR MECHANICAL HVAC PLAN - AREA B4
MH102C1 SECOND FLOOR MECHANICAL HVAC PLAN - AREA C1
MH102C2 SECOND FLOOR MECHANICAL HVAC PLAN - AREA C2
MH103 ROOF MECHANICAL HVAC PLAN - OVERALL
MP101 FIRST FLOOR MECHANICAL PIPING PLAN - OVERALL
MP101A1 FIRST FLOOR MECHANICAL PIPING PLAN - AREA A1
MP101A2 FIRST FLOOR MECHANICAL PIPING PLAN - AREA A2
MP101A3 FIRST FLOOR MECHANICAL PIPING PLAN - AREA A3
MP101A4 FIRST FLOOR MECHANICAL PIPING PLAN - AREA A4
MP101B1 FIRST FLOOR MECHANICAL PIPING PLAN - AREA B1
MP101B2 FIRST FLOOR MECHANICAL PIPING PLAN - AREA B2
DOCUMENT 00 01 15 Page 6
Sheet Sheet Number Name
MP101B3 FIRST FLOOR MECHANICAL PIPING PLAN - AREA B3
MP101B4 FIRST FLOOR MECHANICAL PIPING PLAN - AREA B4
MP101C1 FIRST FLOOR MECHANICAL PIPING PLAN - AREA C1
MP101C2 FIRST FLOOR MECHANICAL PIPING PLAN - AREA C2
MP101C3 FIRST FLOOR MECHANICAL PIPING PLAN - AREA C3
MP102 SECOND FLOOR MECHANICAL PIPING PLAN - OVERALL
MP102A1 SECOND FLOOR MECHANICAL PIPING PLAN - AREA A1
MP102A2 SECOND FLOOR MECHANICAL PIPING PLAN - AREA A2
MP102A3 SECOND FLOOR MECHANICAL PIPING PLAN - AREA A3
MP102A4 SECOND FLOOR MECHANICAL PIPING PLAN - AREA A4
MP102B1 SECOND FLOOR MECHANICAL PIPING PLAN - AREA B1
MP102B2 SECOND FLOOR MECHANICAL PIPING PLAN - AREA B2
MP102B3 SECOND FLOOR MECHANICAL PIPING PLAN - AREA B3
MP102B4 SECOND FLOOR MECHANICAL PIPING PLAN - AREA B4
MP102C2 SECOND FLOOR MECHANICAL PIPING PLAN - AREA C2
M-201 AHU PLANS AND ELEVATIONS
M-301 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-604 MECHANICAL SCHEDULES
M-605 MECHANICAL SCHEDULES
M-606 MECHANICAL SCHEDULES
M-607 MECHANICAL SCHEDULES
M-608 MECHANICAL SCHEDULES
M-701 MECHANICAL DIAGRAMS
M-702 MECHANICAL DIAGRAMS
M-703 MECHANICAL DIAGRAMS
M-750 BID ALTERNATES #0001A
M-800 BUILDING AUTOMATION SYSTEM (BAS) SYMBOLS AND ABBREVIATIONS
M-801 BAS-SYSTEM ARCHITECTURE DIAGRAM
M-802 BAS-AIR HANDLING SYSTEM DIAGRAM
M-803 BAS-AHU SEQUENCE OF OPERATIONS
M-804 BAS-AHU I/O POINTS LIST
M-805 BAS-AHU I/O POINTS LIST
M-806 BAS-CHILLED WATER SYSTEM DIAGRAM
M-807 BAS- CHILLED WATER SYSTEM SEQUENCE OF OPERATION
M-808 BAS-CHILLED WATER SYSTEM I/O POINTS LIST
M-809 BAS-CHILLED WATER SYSTEM I/O POINTS LIST
M-810 BAS-CHILLED WATER SYSTEM I/O POINTS LIST
M-811 BAS-HOT WATER SYSTEM DIAGRAM
M-812 BAS-HOT WATER SYSTEM SEQUENCE OF OPERATION
M-813 BAS-HOT WATER SYSTEM I/O POINTS LIST
M-814 BAS-ROOM CONTROL DIAGRAMS
M-815 BAS-ROOM CONTROL DIAGRAMS
M-816 BAS-ROOM CONTROL DIAGRAMS
M-817 BAS-MISCELLANEOUS CONTROLS DIAGRAMS
M-818 BAS-MISCELLANEOUS I/O POINTS LIST
P-001 PLUMBING SYMBOLS AND ABBREVIATIONS
P-100A UNDERGROUND PLUMBING PLAN - PART A
P-100B UNDERGROUND PLUMBING PLAN - PART B
P-100C UNDERGROUND PLUMBING PLAN - PART C
DOCUMENT 00 01 15 Page 7
Sheet Sheet Number Name
P-101A FIRST LEVEL PLUMBING PLAN - PART A
P-101B FIRST LEVEL PLUMBING PLAN - PART B
P-101C FIRST LEVEL PLUMBING PLAN - PART C
P-102A SECOND LEVEL PLUMBING PLAN - PART A
P-102B SECOND LEVEL PLUMBING PLAN- PART B
P-102C SECOND LEVEL PLUMBING PLAN - PART C
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 SANITARY WASTE DIAGRAM
P-602 SANITARY WASTE DIAGRAM
P-603 SANITARY WASTE DIAGRAM
P-604 DOMESTIC WATER RISER DIAGRAM
P-605 DOMESTIC WATER RISER DIAGRAM
P-606 DOMESTIC WATER RISER DIAGRAM
P-607 NATURAL GAS RISER DIAGRAM
P-701 PLUMBING SCHEDULES
E-001B ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-002 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EL-101A ELECTRICAL LIGHTING PLAN - FIRST FLOOR AREA A
EL-101B ELECTRICAL LIGHTING PLAN - FIRST FLOOR AREA B
EL-101C ELECTRICAL LIGHTING PLAN - FIRST FLOOR AREA C
EL-102A ELECTRICAL LIGHTING PLAN - SECOND FLOOR AREA A
EL-102B ELECTRICAL LIGHTING PLAN - SECOND FLOOR AREA B
EL-102C ELECTRICAL LIGHTING PLAN - SECOND FLOOR AREA C
EP-101A ELECTRICAL POWER PLAN - FIRST FLOOR AREA A
EP-101B ELECTRICAL POWER PLAN - FIRST FLOOR AREA B
EP-101C ELECTRICAL POWER PLAN - FIRST FLOOR AREA C
EP-102A ELECTRICAL POWER PLAN - SECOND FLOOR AREA A
EP-102B ELECTRICAL POWER PLAN - SECOND FLOOR AREA B
EP-102C ELECTRICAL POWER PLAN - SECOND FLOOR AREA C
EG-101 ELECTRICAL GROUNDING AND LIGHTNING PROTECTION PLAN - FIRST FLOOR
EG-102 ELECTRICAL GROUNDING AND LIGHTNING PROTECTION PLAN - SECOND FLOOR
EG-103 ELECTRICAL GROUNDING AND LIGHTNING PROTECTION PLAN - ROOF
E-401 ELECTRICAL LIGHTING ELEVATIONS PLAN
E-402 ELECTRICAL ENLARGED PLAN
E-403 ELECTRICAL ENLARGED PLAN
E-404 BID ALTERNATES ELECTRICAL ENLARGED PLANNOT USED
E-405 REFERENCE SHEET
E-406 REFERENCE SHEET
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-505 ELECTRICAL DETAILS
E-506 ELECTRICAL DETAILS
E-507 ELECTRICAL DETAILS
E-601 ELECTRICAL ONLINE DIAGRAM
E-602 ELECTRICAL ONLINE DIAGRAM
E-603 ELECTRICAL GROUNDING RISER DIAGRAM
E-604 ELECTRICAL LIGHTING CONTROL RISER DIAGRAM
E-701 ELECTRICAL TRANSFORMER AND FEEDER SCHEDULES
E-702 ELECTRICAL LIGHTING FIXTURE SCHEDULES
E-703 LIGHTING CONTROL ZONE SEQUENCE OF OPERATIONS AND
LIGHITNG CONTROL SCHEDULES
E-704 PANEL SCHEDULES
E-705 PANEL SCHEDULES
E-706 PANEL SCHEDULES
DOCUMENT 00 01 15 Page 8
Sheet Sheet Number Name
E-707 PANEL SCHEDULES
E-708 PANEL SCHEDULES
E-709 PANEL SCHEDULES
E-710 PANEL SCHEDULES
E-711 PANEL SCHEDULES
E-712 PANEL SCHEDULES
E-713 PANEL SCHEDULES
E-714 PANEL SCHEDULES
E-715 PANEL SCHEDULES
E-716 PANEL SCHEDULES
E-717 PANEL SCHEDULES
E-718 PANEL SCHEDULES
FA001 LEGEND, NOTES, AND ABBREVIATIONS
FA101A FIRST FLOOR PLAN - AREA A
FA101B FIRST FLOOR PLAN - AREA B
FA101C FIRST FLOOR PLAN - AREA C
FA102A SECOND FLOOR PLAN - AREA A
FA102B SECOND FLOOR PLAN - AREA B
FA102C SECOND FLOOR PLAN - AREA C
FA501 FIRE ALARM DETAILS
FA601 RISER DIAGRAM
FA700 BID ALTERNATE #001A
FX001 LEGEND, NOTES, AND ABBREVIATIONS
FX101A FIRST FLOOR PLAN - AREA A
FX101B FIRST FLOOR PLAN - AREA B
FX101C FIRST FLOOR PLAN - AREA C
FX102A SECOND FLOOR PLAN - AREA A
FX102B SECOND FLOOR PLAN - AREA B
FX102C SECOND FLOOR PLAN - AREA C
FX700 BID ALTERNATE #001A
T-001 LEGEND, NOTES, AND ABBREVIATIONS
T-101A FIRST FLOOR TELECOM PLAN - AREA A
T-101B FIRST FLOOR TELECOM PLAN - AREA B
T-101C FIRST FLOOR TELECOM PLAN - AREA C
T-102A SECOND FLOOR TELECOM PLAN - AREA A
T-102B SECOND FLOOR TELECOM PLAN - AREA B
T-102C SECOND FLOOR TELECOM PLAN - AREA C
T-401 ENLARGED SERVER ROOM PLAN
T-501 DETAILS - TELECOM
T-601 RISER DIAGRAM AND RACK ELEVATION
T-700 BID ALTERNATE #001A
TY001 LEGEND, NOTES, AND ABBREVIATIONS
TY101A FIRST FLOOR ELECTRONIC SECURITY SYSTEM PLAN - AREA A
TY101B FIRST FLOOR ELECTRONIC SECURITY SYSTEM PLAN - AREA B
TY101C FIRST FLOOR ELECTRONIC SECURITY SYSTEM PLAN - AREA C
TY102A SECOND FLOOR ELECTRONIC SECURITY SYSTEM PLAN - AREA A
TY102B SECOND FLOOR ELECTRONIC SECURITY SYSTEM PLAN - AREA B
TY102C SECOND FLOOR ELECTRONIC SECURITY SYSTEM PLAN - AREA C
TY501 RISER DIAGRAMS AND RACK ELEVATION
TY700 BID ALTERNATE #001A
-- End of Document --
DOCUMENT 00 01 15 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 01 15 Page 10
SECTION 01 06 00
REGULATORY REQUIREMENTS
02/10
PART 1 GENERAL
1.1 SECTION INCLUDES
a. Regulatory Codes.
b. Air Force Regulations.
c. Permits.
1.2 REGULATORY CODES
The latest editions of Federal, State, Industry and local codes which govern this work include, but may not be limited to:
a. Federal:
1. Part 1926 - Chapter of Title 29, Code of Federal Regulations.
2. Part 192 - Chapter of Title 49, Code of Federal Regulations.
3. Corps of Engineers Safety and Health Requirement Manual, EM 385-1-1.
4. National Historic Preservation Act of 1966 as amended and 1980 as amended.
5. Executive Order 13101 - "Greening the Government through Waste Prevention, Recycling and Federal Acquisition"
6. Resource Conservation and Recovery Act Section 6002
7. FAR Clause 52.223-4 Recovered Materials Certification
8. FAR Clause 52.223-9 Certification of Percentage of Recovered Material Content for EPA Designated Items Used in Performance of the Contract
9. FAR Clause 52.223-10 Waste Reduction Program
b. State:
1. Virginia State Enforcement.
1.3 AIR FORCE REGULATIONS
The latest editions of the following Air Force Regulations shall apply to this work:
a. MIL Handbook 1190, Facility Planning and Design Guide.
b. Air Force Safety and Health Standard: AFR127-12, Air Force Occupational Safety and Health Program, and applicable standards.
SECTION 01 06 00 Page 1
1.4 PERMITS
a. The Contractor shall apply for and obtain the following permits, in addition to any other required permits, as applicable:
1. Disposal of Hazardous Materials.
b. The Contractor shall be responsible for payment of any fees associated with acquiring the required permits and should reflect those costs in his/her bid proposal.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
SECTION 01 06 00 Page 2
SECTION 01 11 00
SPECIAL CONDITIONS
06/14
PART 1 GENERAL
1.1 SUMMARY
The Langley Air Force Targeting Center is a control administrative facility including: command suites; open and individual administrative offices areas; a large lecture style multi-purpose room; conference, training and video tele-conference (VTC) rooms; break and lounge areas;
storage and support rooms, generator, passenger elevator, chilled beam mechanical system; lightning protection, fire protection, fire alarm mass notification, and intrusion detection systems.
Supporting facilities include all required utility systems and connections; electric (including general and security lighting); water, sewer, and gas; paving, walks, curbs and gutters; parking and site circulation; storm drainage.
Work shall include, but is not necessarily limited to, the furnishing of all labor supervision, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of the Government.
All construction work shown on the contract drawings and not expressly mentioned in the specifications, and all work specified and no shown on the contract drawings but obviously necessary to the proper execution of the same shall be performed by the Contractor, as it is not the intent to delineate or describe every detail and feature of the work.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
SECTION 01 12 00 Environmental Special Conditions Langley Air Force Base (AFB), Joint Base Langley-Eustis (JBLE)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
LANGLEY AFB, JBLE
TELECOMMUNICATIONS BUILDING (Langley AFB, JBLE Specification CABLING SYSTEMS STANDARDS 27 10 00 dated 3 April 2014 or most current version)
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control
SECTION 01 11 00 Page 1 approval. Submit the following in accordance with Section 01 33 00.00 50
SUBMITTAL PROCEDURES:
SD-03 Product Data
Material Safety Data Sheet (MSDS) for each item
Affirmative Procurement Report
Exemption Form, Annex B to LAFB Affirmative Procurement Plan
32-7080
All Employee Names and Social Security Numbers
Work Clearance Request (Air Force Form 103)
Quality Control (QC) Report
SD-11 Closeout Submittals
Survey Report
Metadata
Deliverables and Final As-builts
Three copies of Computer-Aided Draftiing and Design (CADD) didgital final as-built drawings on CD's
One As-Built Drawings (Redline)
Warranty of Construction
Equipment Warranty Certificate
Equipment Warranty/Guarantee Records
DD Form 1354 Acceptance and Transfer of Real Property Facilities
1.3.1 Submittal Procedures
1.3.1.1 Schedule of Material Submittals (Eng Form 4025-12)
Information, shop drawings, certificates, test data, etc., listed on the attached Eng Form 4025-12, Schedule of Material Submittals, shall be submitted for approval by the Contracting Officer, or his/her designated representative in accordance with the General Provisions. Whenever in this contract materials or drawings are required to be submitted by the Contractor to the Contracting Officer for approval and the material or drawings submitted are at variance with the specifications or Government drawings, but are, nevertheless, approved by the Contracting Officer, inadvertently and without consciousness of the variance, and regardless that a closer review could have revealed the variance, then such approval shall not be final unless the Contractor expressly noted in a memorandum to the Contracting Officer, on the material submittal or drawing that "this material or drawing varies from specifications in the following aspects -" or uses other works of similar clear meaning. In the event of such an inadvertent, erroneous approval, the Contracting Officer, upon
SECTION 01 11 00 Page 2 discovering the variance at any stage, have the right to require the Contractor to do such rework and/or material replacement as is necessary to obtain compliance with the specifications, and the expense of such rework and material replacement shall be borne solely by the Contractor.
a. Submittals for technical compliance of finishes may be made individually for each material. SUBMITTALS FOR PATTERN, COLOR, TEXTURE, ETC., SHALL BE MADE SIMULTANEOUSLY FOR EACH ROOM OR AREA.
Finishes shall be scheduled for each room/area to include surface, type material, manufacturer, brand name or product number, and space for the Government selection of pattern/color.
EXAMPLE:
Room 100
Floor: vinyl Tarkett Reliant (62107 Adobe)
Floor: carpet Milliken Magistrate (21 Clan Henna)
Wall: paint Pittsburgh Spread-Flow (white #21)
Wall: vinyl Flex-Wall Pls. In a Roll (Rajah Blue)
Wainscot: paneling Masonic Fireguard (walnut)
Ceiling: acoustic Gold Bond Acoustinet (fissure #21)
Trim: paint Glidden Easy-Enamel (0021 blue)
1.4 SCOPE OF WORK
The work under this project consists of a completed administration building for the Langley AFB as shown in the provided documents.
1.4.1 Work Hours
Normal duty hours for Langley AFB, JBLE are 0730 through 1630, Monday through Friday. Work on weekends, recognized Federal holidays, or other than normal duty hours must be coordinated and approved with the Contracting Officer (CO) or his/her designated representative.
1.4.2 General Working Conditions
a. Work shall be performed in such a manner as to cause minimum disruption to the users in the area.
b. The Contractor shall notify the Contracting Officer or his/her designated representative when he intends to work so Government inspection can be provided while work is in progress.
1.5 ORDER OF WORK
The Contractor shall coordinate all work with the Contracting Officer, or his/her designated representative. Before starting work at the job site, provide five days' notice to the Contracting Officer or his/her designated representative.
SECTION 01 11 00 Page 3
1.6 PHASING OF WORK
The Contractor shall use the following Sequence of Work in preparing his/her Contract Progress Schedule. It lists only highlights of the construction program and is not intended in any way as a complete scope of work. Each item shall be completed before the next item may be started.
Work items not listed may be scheduled at any time. Work to include:
a. Site preparation and excavation to include work on previous Transient Lodging Facility (TLF) site and the Munitions Response Area (MRA) within the areas of construction as necessary to safely proceed with construction. Construction of AF Targeting Center Facility as required and in accordance with the Section 01 11 00.01 CONSTRUCTION
SECURITY PLAN.
1.7 APPLICABLE CODES AND REGULATIONS
The latest edition of the following Building Codes shall be used for all construction under this contract:
a. Air Force Engineering Technical Letter ETL 01-1, Reliability and Maintainability (R&M) Design Checklist
b. American National Standards Institute (ANSI)
c. American Standards for Testing Materials (ASTM)
d. Americans with Disabilities Act (ADA)
e. ANSI C-2, National Electrical Safety Code (QIESC)
f. Applicable Unified Facilities Guide Specifications
g. HQ 25 Air Force (25 AF) Architectural / Interior Design Standards, dated 4 Jan 2017 or most current version.
h. Institute of Electrical and Electronics Engineers (IEEE)
i. International Building Code
j. International Code Council (ICC) International Plumbing Code
k. International Fire Code
l. International Mechanical Code
m. International Society of Automation (ISA)
n. Langley Air Force Base Design Compatibility Guidelines, March 2006 or most current version.
o. Langley AFB, JBLE Electrical, Fire, and Communications Design
Standards - latest edition
p. Unified Facilities Criteria (UFC) 1-200-02, High Performance and
Sustainment Building (HPSB) Requirements
q. Life Safety Code, NFPA 101
r. MIL Handbook 1190
s. National Electrical Code (NEC)
t. National Electrical Manufacturers Association (NEMA)
u. National Fire Protection Association (NFPA)
v. National Fire Protection Association Codes (NFPA) - latest edition
w. Supervisory Control and Data Acquisition (SCADA)
x. Underwriters Laboratories, Inc. (UL)
y. Unified Facilities Criteria (UFC) 3-600-01, Fire Protection
Engineering for Facilities
z. Unified Facilities Criteria (UFC) 4-020-01, DoD Security Engineering -
Facilities Planning Manual
aa. 25AF/A4C Mission Critical Facility Engineering Standard (MCFES) 15-01:
Facility Electrical and Mechanical Infrastructure Redundancy Requirements, dated 27 Oct 2015 or most current version.
NOTE: If there is a conflict between these codes or regulations and these
SECTION 01 11 00 Page 4 contract specifications, the most stringent requirements shall apply at all times.
1.8 SALVAGE
Title to all materials and equipment to be demolished, shall be vested to the Contractor upon removal from the base except as noted below. All unsalvageable material will be disposed of legally off base.
1.8.1 Items Salvaged for the Government
The Contractor shall salvage the following existing materials to the Government as indicated below. Salvaged materials shall be cleaned, sorted, identified, bundled, boxed, etc. and delivered to the collection location identified as follows:
a. No items are identified by the Government for salvage.
1.9 CONSTRUCTION STANDARDS
1.9.1 General
The Contractor is reminded that the construction site must be operated and maintained according to these specifications and is subject to inspection and enforcement according to all federal, state and local codes/regulations.
1.9.2 Office Trailers and Storage Units
1.9.2.1 Office Trailers
If a trailer is required for work and at the discretion of the Government, an office trailer may be located at the project site. The Contractor shall request Contracting Officer approval for the trailer location. The Contractor shall make the request in writing at least fourteen calendar days prior to placement of trailer at site. All office trailers shall be restricted to the staging and storage limits as noted in the contract documents. The final location shall be approved by the Contracting Officer or his/her designated representative. Any office trailer or government field office shall be provided with a skirt on all sides, in like new condition, and painted either Langley Brown (Federal Standard 595a, 20100), Langley Beige, or white. Refer to Section 01 50 02.00 50 for Government Field Office requirements. Office trailers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. Displayed on the exterior of all trailers shall be a nameplate which has the name of the Contractor's company, name for Contractor's point(s) of contact (POC) and telephone number where he or she can be reached, contract number, project number, title and date trailer was placed on site where located.
1.9.2.2 Storage Units
The Contractor shall review the limits of staging and storage in the contract documents and request final approval from the Contracting Officer for the siting, size and color of Storage Units, CONNEX boxes and dumpsters. The Contractor shall not bring any such items to the job site without the Contracting Officer's approval. All storage units shall be painted Langley Brown (Federal Standard 595a, 20100), Langley Beige or white. Displayed on the exterior of all storage units shall be a
SECTION 01 11 00 Page 5 nameplate which has the name of the Contractor's company, name for Contractor's point(s) of contact (POC) and telephone number where he or she can be reached, contract number, project number, title and date unit was placed on site where located.
1.9.3 On-Site Storage Units
Availability and size of material lay down area shall be restricted as noted on the contract documents or as discussed during the preconstruction conference. The Contractor shall consolidate all bulk or large quantities of materials at the construction site in area(s) approved by the CO. All such items shall be stored neatly grouped together. Bulky or unsightly construction materials, heavy or light equipment or tanks shall not be delivered to or stored on the construction site for any period longer than seven calendar days prior to use, installation in the project or start of construction. The Contractor shall store all supplies and equipment on project site to preclude theft or damage. Protection and security for materials and equipment on site is the sole responsibility of the Contractor. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by the CO or his/her designated representative. Refer to 01 11 00.01 CONSTRUCTION SECURITY
PLAN.
1.9.4 Fencing and Screening
Contractor shall enclose and secure all mobilization areas, to include construction sites, contract trailers, and material storage / laydown areas, with required physical barriers (to include but not be limited to temporary fence) around the perimeter unless otherwise approved in writing by the Contracting Officer. Temporary chain link fence shall be installed to a minimum height of six (6) feet and include securable gates as necessary. Temporary construction fencing shall be completely secured and obstruct visibility as necessary to limit public access to hazardous areas, maintain accountability of authorized pesonnel, prevent loss of material, prevent spread of foreign object damage (FOD) or other debris, and screen construction areas. Temporary fencing shall be completely secured at the top and bottom to prevent access. These areas shall also be screened from view in accordance with base standards or as otherwise specified. Screening shall be fabricated of 100% Polypropylene, woven, 92% blockage fabric that has been mechanically attached to the fence for the full height of the fence. The edges of each section of screening fabric shall be finished with a reinforced hem. Attachment points shall be reinforced fabric built into the hem or metal grommets built into the hem. All fabric used for screening of the construction and material storage / lay down areas shall be UV rated and dark brown or dark bronze in color unless otherwise approved by the Base Civil Engineer (BCE).
Fence screening fabric shall be inspected weekly to insure all sections remain properly in-stalled and taut at all times. Refer to section 01 11 00.01 CONSTRUCTION SECURITY PLAN for more details.
1.9.5 Locksets
If locksets are installed as a result of this project, the Contractor shall provide cylinders and cores for new locks. Cylinders and cores that the Contractor provides shall have seven-pin tumblers using the A2 system and WB keyway - except for dormitories, which use the A4 system and WC keyway. All cylinders will be from a single manufacturer. All cores will be stamped with a key control symbol in a concealed place on the core.
(For information only - the Best Premium WB Keyway, 7-pin core is part
SECTION 01 11 00 Page 6 number 1CP7WB2.) The cylinders will be fully compatible with products of the Best Lock Corporation, which have interchangeable cores that are removable by special control keys.
Provide and submit a grand master keying system and a sub-master keying system for the building that is an extension of the existing Langley AFB, JBLE keying system. Best Lock Corporation can key cores and provide keys in accordance with the Langley AFB, JBLE grand master keying system; the base grand master keying system will not be made available to outside contractors. Key the equipment spaces and mechanical rooms separately from the building systems. Key them alike to the existing Langley AFB, JBLE systems for equipment and mechanical space doors. Prior to installing any lock cylinder or cores, the contractor shall coordinate with the Langley AFB, through the Corps of Engineers JBLE locksmith to ensure compliance with the grand master keying system and master keying sequence, and that the proposed lock hardware will meet requirements of this specification.
1.9.6 Communications
The Contractor shall design and install new communications in accordance with the most current version of Section 27 10 00 TELECOMMUNICATIONS BUILDING CABLING SYSTEMS STANDARDS (Langley AFB, JBLE).
1.9.7 Electrical Panels
Any electrical panel altered by the Contractor shall have every circuit and circuit modification legibly identified as to its clear, evident and specific purpose and use. The identification shall include sufficient detail to allow each circuit to be distinguished from all others. Spare positions that contain unused overcurrent devices or switches shall be described accordingly. The identification shall be included in a circuit directory that shall be located on the face or inside of the panel door in the case of a panelboard and located at each switch in a switchboard. No circuit shall be described in a manner that depends on transient conditions of occupancy. This is in accordance with §408.4 of the 2008 version of the National Electric Code (NEC).
1.10 CONTRACTOR OPERATIONS
1.10.1 Grassy Areas
Grass and weed growth in excavated materials that are stockpiled on site shall be controlled or cut weekly. Weeds and grass within the construction site shall also be controlled or cut weekly and any bushes or shrubs shall be trimmed monthly. Areas disturbed by construction or those areas required by the plans to be "re-seeded" shall be re-established by hydroseeding only. Straw shall not be used as a cover for freshly seeded areas.
1.10.2 Privately Owned Vehicles (POVs)
POVs used by Contractor personnel to commute to work are required to park in existing parking lots. Contractor or Contractor's employees, including subcontractors, shall not park any personally owned vehicle (POV) or company or delivery vehicle on grassy areas near or in the construction site without prior approval from the Contracting Officer, or his/her designated representative. When allowed, parking on grassy areas will only be for short-term delivery purposes (to include heavy tools, equipment, construction materials, etc.). Use designated hard surfaces or existing
SECTION 01 11 00 Page 7 parking lots near or within the project site for parking of POVs or company or delivery vehicles. Tire and track impressions (ruts) created on wet or soft soil by vehicles or equipment used in the Contractor's operations shall not be left for more than one day after removal of such vehicle or equipment that cased the rutting. The Contractor shall restore the affected area(s) of the site to its original condition within that one-day period.
1.10.3 Site Cleanup
During construction, the Contractor shall maintain all areas in a neat and orderly manner. Contractor shall keep the construction site cleaned daily of all construction trash, trash generated by employees, debris or demolished building materials. If the work areas are not kept neat and orderly, the Contractor must return to the area to correct the unacceptable condition. During the laying of asphalt roads, streets or parking surfaces, areas soiled by residual asphalt shall be cleaned daily.
The Contractor shall treat with lime entrances and exits to asphalt work site at his/her own expense.
1.10.4 Access Routes
Access routes to this project shall be limited through the Base as shown on the plans. The Contractor shall not use the gates at King Street Bridge or LaSalle Gate (Nealy Avenue) for haul route entry or exit. When entering and exiting the base, the haul route shall be through the West Gate only.
1.10.5 Removal of Formwork
The Contractor shall remove all concrete formwork and boards within fourteen calendar days after concrete pour.
1.10.6 Noise Control
The Contractor shall comply with all applicable state, local and installation laws, ordinances and regulations relative to noise control, to include applicable quiet hours exclusive to Langley AFB, JBLE. Work site is in a residential area of Langley AFB, JBLE. There shall be absolutely no construction activities in or around the construction site prior to or after the hours designated in "Work Hours" paragraph above without an approval from the Contracting Officer, or his/her designated representative. This restriction also applies to holidays also.
1.10.7 Excavations
All trenches/excavations shall be back filled and compacted to 95% of maximum Proctor density. Trenches will be top dressed with no less than three inches of shifted topsoil and then compacted. The finished area will be free of all debris, rocks and then graded to conform to the surrounding area. The area will be hydroseeded in accordance with SECTION 32 92 19 SEEDING of the specifications.
1.10.8 In-Ground Obstructions
Any type of raised obstructions shall have the surrounding soil backfilled, compacted to 95% of maximum Proctor density, and graded. The area will be top dressed as above to within three inches of the top of obstruction. Ground level obstructions will have the area dressed to the
SECTION 01 11 00 Page 8 level of the obstruction. The area will be hydroseeded in accordance with SECTION 32 92 19 HYDROSEEDING of the specifications.
1.10.9 Architectural Compatibility
Due to Langley AFB, JBLE's distinct historic architecture and the high visitor traffic it receives, several special actions are required during construction:
a. The Contractor is solely responsible for spillage from his/her vehicles and such…