REGISTER.pdf

PDF 401 KB Posted

Attached to
DLA Warehouse 11 Renovation Federal contract opportunity
Solicitation number
W9123620B0017
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This submittal register outlines products and services required for the DLA Warehouse 11 Renovation project. The solicitation seeks bids for renovations including concrete work, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, equipment, furnishings, special construction, conveyance systems, mechanical systems, and electrical systems. Key submittals required cover schedules, shop drawings, product data, samples, design mixtures, manufacturer instructions, test reports, and certificates of compliance. The due dates for submissions and approvals are outlined. The Army Corps of Engineers is the contracting agency and only electronic bid submissions will be accepted by the specified due date according to the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Warehouse 11 Renovation, newest first.
File Type Posted
Warehouse 11 page 4.pdf PDF
Warehouse 11 page 2.pdf PDF
Warehouse 11 KO Signed Page 1.pdf PDF
20-B-0017 Amendment 7.pdf PDF
ProjNet Responses Amend 7.pdf PDF
A-403.pdf PDF
A-401.pdf PDF
PROJECT.pdf PDF
20B0017 Amendment 5.pdf PDF
A-132.pdf PDF
G-002.pdf PDF
A-131.pdf PDF
AD102.pdf PDF
23 52 43.00 20.pdf PDF
A-501.pdf PDF
08 51 00.pdf PDF
G-001.pdf PDF
AD103.pdf PDF
PD102.pdf PDF
A-133.pdf PDF
09 29 00.pdf PDF
07 54 19.pdf PDF
A-135.pdf PDF
A-101.pdf PDF
05 12 00.pdf PDF
A-310.pdf PDF
20-B-0017 Amendment 4.pdf PDF
A.01.13 A-201.pdf PDF
A.01.13 A-203.pdf PDF
20-B-0017 Amendment 3.pdf PDF
A.01.13 A-116.pdf PDF
A.01.13 Specs Table of Contents.pdf PDF
A.01.13 A-321.pdf PDF
A.01.13 AD100.pdf PDF
A.01.13 A-100.pdf PDF
A.01.13 07 54 19.pdf PDF
A.01.13 A-403.pdf PDF
A.01.13 10 81 00.pdf PDF
A.01.13 A-113.pdf PDF
A.01.13 A-114.pdf PDF
A.01.13 A-311.pdf PDF
A.01.13 A-115.pdf PDF
A.01.13 02 42 91.pdf PDF
WH 11 Site Visit.pdf PDF
20-B-0017 Amendment 2.pdf PDF
_RTA_Reno_to_Bldg_11_DDRV_Full_Plan_Set.pdf PDF
20-B-0017 Amend 1.pdf PDF
A.01.13 WH11 Final Specifications.pdf PDF
A.01.13 WH11 Final Drawings.pdf PDF
20-F-0017 WH 11.pdf PDF
Show all 50

DLA Warehouse 11 Renovation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 39 PAGES

Renovations to Building 11 DDRV

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.4.1 GSustainability Action Plan

1.5.2.1 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.2.1 GFinal Sustainability eNotebook

1.5.2.1 GAmended Final Sustainability

eNotebook

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Amendment 2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 39 PAGES

01 35 26 1.7.2.4 GNaval Architecture Analysis

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

1.14.1 GRadiography Operation Planning

Work Sheet

1.14.1 GPortable Gauge Operations

Planning Worksheet

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.10 GSolid Waste Management Permit

1.5.2 GRegulatory Notifications

1.6 GEnvironmental Protection Plan

1.6.9.1 GDirt and Dust Control Plan

1.5.4 GEmployee Training Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 39 PAGES

01 57 19 SD-06 Test Reports

3.6.1.1.2Laboratory Analysis

3.6.2.1 GSolid Waste Management Report

SD-07 Certificates

1.5.4 GEmployee Training Records

1.5.4.1Certificate of Competency

SD-11 Closeout Submittals

3.6.1 GWaste Determination

Documentation

3.6.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.5.4 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.6.2.1 GSolid Waste Management Report

3.6.3.1 GHazardous Waste/Debris

Management

1.5.2 GRegulatory Notifications

3.6.2.1 GSales Documentation

3.6.2.1Contractor Certification

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7 SRecords

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 39 PAGES

01 78 00 1.7.5Warranty Tags

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.5As-Built Record of Equipment and Materials

3.4Construction Contract

Specifications

2.3 GCertification of EPA Designated

Items

3.8 GInterim DD FORM 1354

3.8 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 39 PAGES

01 78 23 3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.2.4Receipts

02 42 91 SD-01 Preconstruction Submittals

1.2 GWork Plan

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

3.2 GOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.7 GRecordkeeping

3.7 GException Report

3.8Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 39 PAGES

02 81 00 1.4.2 GTraining

1.4.3Certification

3.3.3 GShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.6Waste Minimization

02 82 16.00 20 SD-03 Product Data

3.1.4 GLocal exhaust equipment

3.1.5 GVacuums

3.1.1.1 GRespirators

3.1.4 GPressure differential automatic

recording instrument

1.2.2 GAmended water

1.3.8 GMaterial Safety Data Sheets

(MSDS) for all materials

2.1 GEncapsulants

SD-06 Test Reports

1.5.5 GAir sampling results

1.5.6 GPressure differential recordings

for local exhaust system

3.3.3.2 GAsbestos disposal quantity report

3.2.6.3 GClearance sampling

SD-07 Certificates

1.3.9 GAsbestos hazard abatement plan

1.3.10 GTesting laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 39 PAGES

02 82 16.00 20 1.5.1 GPrivate qualified person documentation

1.5.4 GContractor's license

1.5.2 GCompetent person

1.5.3 GWorker's license

1.3.11 GLandfill approval

1.3.3 GEmployee training

1.3.12 GMedical certification

1.3.11 GWaste shipment records

1.3.6 GRespiratory Protection Program

1.3.11 GDelivery tickets

3.1.5 GVacuums

3.1.2.3 GWater filtration equipment

3.1.5 GVentilation systems

3.1 Gequipment used to contain

airborne asbestos fibers

2.1 Gencapsulants

1.3.4Notifications

SD-11 Closeout Submittals

1.3.4 GNotifications

1.6.1 GRental equipment

1.3.6.1 GRespirator program records

1.3.4 GPermits and licenses

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.2 GLead Compliance Plan

1.5.1.1 GCompetent Person

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 39 PAGES

02 83 13.00 20 1.5.1.2 GTraining Certification

1.5.2.8 Glead waste management plan

1.5.2.4 GMedical Examinations

SD-06 Test Reports

1.5.2.3 Gsampling results

1.5.2.3 GOccupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.3 GTesting laboratory

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

3.5.2.1 Gturn-in documents or weight

tickets

03 01 00 SD-01 Preconstruction Submittals

1.5.2 GQualifications

1.5.3 GWork Plan

1.6.1 GWork Plan

SD-03 Product Data

2.4Conventional Concrete

2.5Polymers

2.6Miscellaneous Materials And

Equipment

SD-04 Samples

2.3Reinforcement And

Reinforcement Supports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 39 PAGES

03 01 00 SD-05 Design Data

3.1.3 GFormwork And Shoring

1.5.1 GRepair Procedures

2.7 GMixture Proportioning

SD-06 Test Reports

2.7Mixture Proportioning

3.1.5Quality Control

3.2.3Quality Control

3.3.3Quality Control

SD-07 Certificates

1.5.2Qualifications

2.3Reinforcement And

Reinforcement Supports

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.1.1Formwork

1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 39 PAGES

03 30 00 SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.3Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Retarder and Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 39 PAGES

03 30 00 1.6.4.3Aggregates

3.14.2.3 GCompressive Strength Tests

3.14.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets

1.8.1Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

03 35 36 SD-03 Product Data

2.1.1 APenetrating Dye

SD-07 Certificates

1.3.1 CInstaller Qualifications

05 12 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 39 PAGES

05 12 00 1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.1.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

SD-05 Design Data

1.4.3 GDesign Calculations for Steel

Connections

1.4.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 39 PAGES

05 12 00 1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13 SD-02 Shop Drawings

2.5 GAngles and Plates

SD-03 Product Data

2.4 GAbrasive metal nosings

2.1 SRecycled Content

2.1 GCertificates of Compliance

05 52 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 39 PAGES

05 52 00 1.2.1 GFabrication Drawings

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-03 Product Data

2.2Roof Decking

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.8.1Certificates of Grade

1.7Preservative Treatment

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-04 Samples

1.5 GSamples

SD-07 Certificates

1.7.1.1 GCertificates of Grade

2.1.3 SIndoor Air Quality for Hardwood

Plywood

06 61 16 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 39 PAGES

06 61 16 1.5.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2 SRecycled Content for Insulation

Materials

2.3Accessories

2.2Acoustic Batt Insulation

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 39 PAGES

07 21 16 3.2.1Insulation

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.13 GGutters

3.1.14 GDownspouts

2.2.1 GGravel Stops and fascia

3.1.15 GSplash Pans

3.1.10 GCounterflashing

3.1.12 GDrip Edges

2.1 SRecycled Content

SD-08 Manufacturer’s Instructions

1.4.2 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.2 GCleaning and Maintenance

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 39 PAGES

07 92 00 2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.5 SIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.1 SRecycled Content for Steel Door

Product

2.5 GFrames

2.5 GFrames

2.5 SRecycled Content for Steel Frame

Product

2.3Accessories

SD-03 Product Data

2.1 GDoors

2.5 GFrames

2.3Accessories

08 11 76 SD-03 Product Data

2.3 GBifolding Metal Doors

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 39 PAGES

08 14 00 1.5Warranty

SD-11 Closeout Submittals

1.5Warranty

08 51 00 SD-02 Shop Drawings

3.1 GSchedule Of Work

SD-03 Product Data

2.2.2 GFasteners

3.1 GWindow

2.1.1 GSelf Adhering Air Barrier

08 60 45 SD-02 Shop Drawings

3.2 GShop Drawings

SD-03 Product Data

2.1 GTranslucent Panels

1.6Warranty

SD-06 Test Reports

2.1Test Reports

SD-07 Certificates

2.4Systems

1.4Qualifications

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.4 GKeying System

SD-03 Product Data

2.3 GHardware Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 39 PAGES

08 71 00 SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.3Glazing Accessories

2.2.3.1Sealants

SD-08 Manufacturer’s Instructions

2.2Setting and Sealing Materials

3.2Glass Setting

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.2Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.3Abuse Resistant Gypsum Board

2.1.6Accessories

2.1.1Gypsum Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 39 PAGES

09 29 00 2.1.1 SRecycled Content for Gypsum

Board

2.1.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.1.4 SVOC Content of Joint Compound

SD-07 Certificates

2.1 GAsbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GMosaic Tile

2.1.1 SRecycled Content for Mosaic Tile

2.1.2 GGlazed Wall Tile

2.1.2 SRecycled Content for Glazed Wall

Tile

2.3 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.3.2 GGrout

SD-07 Certificates

2.3 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.6Maintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 39 PAGES

09 30 10 SD-10 Operation and Maintenance

Data

3.2 GInstallation

09 51 00 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SD-03 Product Data

2.3 SRecycled Content for Suspension

Systems

SD-04 Samples

2.2 GAcoustical Units

SD-07 Certificates

2.2.1.1 SIndoor Air Quality for Type XX

Ceiling Tiles

2.7 SIndoor Air Quality for Sealants

09 65 00 SD-02 Shop Drawings

2.8 GResilient Flooring and

Accessories

SD-03 Product Data

2.8 GResilient Flooring and

Accessories

2.4Adhesives

SD-04 Samples

2.8 GResilient Flooring and

Accessories

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 39 PAGES

09 65 00 3.3 GMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1 SIndoor Air Quality for Vinyl

Composition Tile

2.2 SIndoor Air Quality for Wall Base

2.4 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.8 GResilient Flooring and

Accessories

09 90 00 SD-03 Product Data

2.1 GCoating

3.3.5Sealant

SD-04 Samples

1.10 GColor

SD-07 Certificates

1.4Applicator's Qualifications

1.5.1.2 GQualification Testing

2.1Indoor Air Quality for Paints and

Primers

SD-08 Manufacturer’s Instructions

3.4.1Application Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 39 PAGES

09 90 00 3.8.2Mixing

1.8.2Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

10 21 13 SD-02 Shop Drawings

2.1 GFabrication Drawings

3.2 GInstallation Drawings

SD-03 Product Data

2.1Cleaning and Maintenance

Instructions

2.7 GColors And Finishes

2.2.1 GAnchoring Devices and Fasteners

2.2.2 GHardware and Fittings

2.2.3 GDoor Hardware

2.5 GPilaster Shoes

SD-04 Samples

2.7 GColors and Finishes

SD-07 Certificates

1.6Warranty

SD-11 Closeout Submittals

2.3 SIndoor air quality for solid

phenolic, black core partitions and screens

10 28 13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 39 PAGES

10 28 13 2.2 GAccessory Items

2.1 SRecycled content for stainless

steel toilet accessories

SD-07 Certificates

2.2Accessory Items

1.3.1Baby Changing Stations

10 81 00 SD-02 Shop Drawings

2.1 GBird Control Devices

SD-03 Product Data

2.1 GBird Control Devices

SD-04 Samples

2.1 GBird Control Devices

SD-08 Manufacturer’s Instructions

2.1Bird Control Devices

21 13 17.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.9As-Built Drawings

SD-03 Product Data

1.4.1List of Submittals

2.1 GMaterials and Equipment

1.6Spare Parts

1.4.1 GFire Protection Specialist

1.4.2 GInstaller Qualifications

3.10 GOnsite Training

SD-06 Test Reports

3.8Preliminary Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 39 PAGES

21 13 17.00 10 3.9Final Acceptance Test

SD-07 Certificates

3.3Inspection by Fire Protection

Specialist

SD-10 Operation and Maintenance

Data

3.10 GOperating and Maintenance

Instructions

22 00 00 SD-03 Product Data

2.4Fixtures

2.4.2Flush Valve Water Closets

2.4.2 SWaterSense Label for Flush

Valve Water Closet

2.4.3Flush Valve Urinals

2.4.3 SWaterSense Label for Urinal

2.4.5Countertop Lavatories

2.4.1 SWaterSense Label for Lavatory

Faucet

2.4.6Kitchen Sinks

1.5.1Welding

3.4 GVibration-Absorbing Features

3.8.1Plumbing System

SD-06 Test Reports

3.8Tests, Flushing and Disinfection

SD-07 Certificates

1.3Materials and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 39 PAGES

22 00 00 2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.8.1 GPlumbing System

22 07 19.00 40 SD-02 Shop Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.3 GAdhesives

2.3 GCoatings

2.3 GInsulating Cement

2.3 GInsulation Materials

2.3 GJacketing

2.3 GTape

SD-08 Manufacturer’s Instructions

3.1 GInstallation Manual

SD-11 Closeout Submittals

3.4Record Drawings

2.3 SAdhesives

2.3 SCoatings

2.3 SInsulation Materials

1.3.1 SRecycled Materials

23 00 00 SD-03 Product Data

2.9.1.1 GPropeller Type Power Roof

Ventilators

2.9.1.2 GCeiling Exhaust Fans

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 39 PAGES

23 00 00 3.8 GPerformance Tests

SD-07 Certificates

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.10.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.10.1 GOperation and Maintenance

Manuals

2.9.1.1 GPropeller Type Power Roof

Ventilators

2.9.1.2 GCeiling Exhaust Fans

23 05 93 SD-01 Preconstruction Submittals

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 GTAB Design Review Report

1.5.7.1 GTAB Firm

1.2 GTAB Team Assistants

1.2 GTAB Team Engineer

1.5.7.2 GTAB Specialist

1.2 GTAB Team Field Leader

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 39 PAGES

23 05 93 1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.1.3 GTAB Related HVAC Submittals

1.5.7.4 GTAB Related HVAC Submittals

1.5.6 GTAB Procedures

1.5.6 GCalibration

1.3.3 GSystems Readiness Check

1.5.8 GTAB Execution

SD-06 Test Reports

1.5.3.2 GPrerequisite HVAC Work

Checkout List

3.6 GSeason 1

1.5.3.1 GTAB Design Review Report

1.5.9.1 GTAB Report for Season 1

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 GTAB Submittal and Work

Schedule

1.5.3.2 GTAB Pre-Field Engineering

Report

1.5.5 GInstrument Calibration

Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 39 PAGES

23 05 93 3.6 GSeason 1

1.5.7.1 GTAB Firm

1.3.3 GDesign Review Report

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 53.00 20 SD-02 Shop Drawings

1.7.1 GControl System Diagrams

1.7.2 GOperating Parameters

1.7.4 GSequence of Operation

1.7.3 GWiring Diagram

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 39 PAGES

23 09 53.00 20 SD-03 Product Data

2.2 GSensors

2.3 GThermostats

SD-06 Test Reports

3.3.5 GPerformance Verification Test

SD-07 Certificates

3.3.4 GCertification of Completion

SD-08 Manufacturer’s Instructions

3.4.1 GTraining Course Documentation

SD-10 Operation and Maintenance

Data

1.9.5 GSpace Temperature Control

System

SD-11 Closeout Submittals

3.5 GQualified Service Organization

List

23 21 13.00 20 SD-02 Shop Drawings

1.3.1Hot water heating system

SD-03 Product Data

2.3.3 GExpansion tanks

2.3.4 GExternal air separation tanks

2.1.1Hot water heating pipe

SD-06 Test Reports

3.3.2Hydrostatic test of piping system

SD-07 Certificates

1.5.4.1 GWelding procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 39 PAGES

23 21 13.00 20 1.5.4.2 GWelder's qualifications

23 52 43.00 20 SD-02 Shop Drawings

1.3.2.2Fuel Train

1.3.2.2Wiring Diagram

SD-03 Product Data

2.1Boilers

2.3Boiler Trim and Control

Equipment

2.2Burners and Control Equipment

2.3.18Stack, Breeching, Combustion Air

Intake Duct and Supports

SD-06 Test Reports

3.4.1Operational Tests

1.3.3Water Analysis

SD-07 Certificates

2.1Boilers

2.2Burners and Control Equipment

2.3Boiler Trim and Control

Equipment

SD-08 Manufacturer’s Instructions

2.1Boilers

2.3.8Feedwater Treatment Feeder

SD-10 Operation and Maintenance

Data

2.1Boilers

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 39 PAGES

23 52 43.00 20 2.1Boilers

23 81 00 SD-03 Product Data

3.7.1Spare Parts

3.4Posted Instructions

3.6 GSystem Performance Tests

3.4 GTraining

2.1 GSupplied Products

2.2 GManufacturer's Standard Catalog

Data

SD-06 Test Reports

3.5Refrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates

3.7.2Service Organizations

SD-11 Closeout Submittals

2.2.2.3 SOzone Depleting Substances

23 82 00.00 20 SD-03 Product Data

2.1Unit Heaters

SD-10 Operation and Maintenance

Data

2.1Unit Heaters

23 83 00.00 20 SD-02 Shop Drawings

3.1Heater installation drawing

SD-03 Product Data

2.1Electric wall heaters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 39 PAGES

23 83 00.00 20 SD-10 Operation and Maintenance

Data

2.1Electric wall heaters

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1Material, Equipment, and Fixture

Lists

SD-03 Product Data

2.1.1 GConduits and Raceways

2.1.2 GWire and Cable

3.2.1.8 GSplices and Connectors

2.1.3 GSwitches

2.1.4 GReceptacles

2.1.5 GOutlet Boxes, Pull Boxes and

Junction Boxes

2.1.7 GCircuit Breakers

2.1.6 GPanelboards

2.1.8 GLamps and Lighting Fixtures

2.1.10 GDry-Type Distribution

Transformers

SD-06 Test Reports

3.3 GContinuity Test

3.3 GPhase-Rotation Tests

3.3 GInsulation Resistance Test

SD-08 Manufacturer’s Instructions

3.1Manufacturer's Instructions

26 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 39 PAGES

26 20 00 2.12 GPanelboards

2.14 GTransformers

2.25 GWireways

3.1.8.1 GMarking strips

SD-03 Product Data

2.11 GReceptacles

2.12.3 GCircuit breakers

2.9 GSwitches

2.14 GTransformers

2.17 GManual motor starters

2.26 GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.5 GGrounding system test

3.5.3 GTransformer tests

3.5.4 GGround-fault receptacle test

SD-07 Certificates

2.10 GFuses

SD-09 Manufacturer’s Field

Reports

2.28.1Transformer factory tests

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

26 28 01.00 10 SD-03 Product Data

2.9Fault Current Analysis

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 39 PAGES

26 28 01.00 10 2.9Protective Device Coordination

Study

2.1Equipment

1.4.1System Coordinator

3.3.5Protective Relays

3.2Installation

SD-06 Test Reports

3.3Field Testing

26 51 00 SD-02 Shop Drawings

1.5.1 GLuminaire Drawings

1.5.2 GOccupancy/Vacancy Sensor

Coverage Layout

SD-03 Product Data

2.2 GLuminaires

2.4 GLight Sources

2.3Drivers

1.6.1 GLED Luminaire Warranty

1.5.4 GLuminaire Design Data

2.5.3.2 GVacancy Sensors

2.5.2 GDimming Controllers (Dimmers)

2.6.1 GExit Signs

2.6.2 GLED Emergency Drivers

2.5.3.1 GOccupancy Sensors

3.1.7 GAmbient Light Level Sensor

2.5.4 GLighting Control Panel

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 39 PAGES

26 51 00 1.5.5 GLED Luminaire - IES LM-79 Test

Report

1.5.6 GLED Light Source - IES LM-80

Test Report

1.5.7 GLED Light Source - IES TM-21

Test Report

1.5.8 GOccupancy/Vacancy Sensor

Verification Tests

1.5.11.3 GEnergy Efficiency

SD-07 Certificates

1.6.1.1 GLuminaire Useful Life Certificate

1.5.3 GLED Driver and Dimming Switch

Compatibility Certificate

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

1.6.1 GLED Luminaire Warranty

SD-02 Shop Drawings

1.5.1.1 GLuminaire Drawings

SD-03 Product Data

2.2 GLED Luminaires

2.2.2 GLuminaire Light Sources

2.2.3 GLuminaire Power Supply Units

(Drivers)

2.3.1 GPhotocell

2.4Brackets

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 39 PAGES

26 56 00 1.5.3 GDesign Data for Luminaires

SD-06 Test Reports

1.5.4 GLED Luminaire - IES LM-79 Test

Report

1.5.5 GLED Light Source - IES LM-80

Test Report

3.2Operating Test

SD-07 Certificates

1.6.1 GLuminaire Useful Life Certificate

28 31 64.00 10 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

2.5 GStorage Batteries

2.1.2 GLow Battery Voltage

1.6 GSpecial Tools and Spare Parts

1.4 GTechnical Data and Computer

Software

3.6 GTraining

3.7 GTesting

SD-06 Test Reports

3.7 GTesting

SD-07 Certificates

2.1.6 GEquipment

1.3.1 GQualifications

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 39 PAGES

28 31 64.00 10 3.6 GOperating and Maintenance

Instructions

32 17 23 SD-03 Product Data

2.1.1.2 GSurface Preparation Equipment

List

2.1.2 GApplication Equipment List

3.2Exterior Surface Preparation

1.4.1 GSafety Data Sheets

2.2.9.2 GReflective media for roads

2.2.5 GThermoplastic compound

3.3.2 GThermoplastic compound

SD-06 Test Reports

2.2.9.2 GReflective Media for Roads

2.2.5 GThermoplastic Compound

3.3.2 GThermoplastic Compound

SD-07 Certificates

1.4.2 GQualifications

2.2.9.2Reflective Media for Roads

1.4.1 GVolatile Organic Compound

2.2.5Thermoplastic Compound

3.3.2Thermoplastic Compound

SD-08 Manufacturer’s Instructions

2.2.5 GThermoplastic Compound

3.3.2 GThermoplastic Compound

33 71 02 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 39 PAGES

33 71 02 2.9 GProtective Devices and

Coordination

SD-06 Test Reports

3.14.1 GField Acceptance Checks and

Tests

3.3 GCable Installation Plan and

Procedure

34 71 13.16 SD-02 Shop Drawings

2.1 GGuardrail Posts

2.2 GW-Beam Guardrail

SD-03 Product Data

2.2 GW-Beam Guardrail

SD-08 Manufacturer’s Instructions

3.3End Anchorage

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .