This submittal register outlines products and services required for the DLA Warehouse 11 Renovation project. The solicitation seeks bids for renovations including concrete work, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, equipment, furnishings, special construction, conveyance systems, mechanical systems, and electrical systems. Key submittals required cover schedules, shop drawings, product data, samples, design mixtures, manufacturer instructions, test reports, and certificates of compliance. The due dates for submissions and approvals are outlined. The Army Corps of Engineers is the contracting agency and only electronic bid submissions will be accepted by the specified due date according to the solicitation.
View the file
Other files for this federal contract opportunity
Show all 50
DLA Warehouse 11 Renovation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 39 PAGES
Renovations to Building 11 DDRV
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.4.1 GSustainability Action Plan
1.5.2.1 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.2.1 GFinal Sustainability eNotebook
1.5.2.1 GAmended Final Sustainability
eNotebook
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Amendment 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 39 PAGES
01 35 26 1.7.2.4 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-06 Test Reports
2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.10 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.6 GEnvironmental Protection Plan
1.6.9.1 GDirt and Dust Control Plan
1.5.4 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 39 PAGES
01 57 19 SD-06 Test Reports
3.6.1.1.2Laboratory Analysis
3.6.2.1 GSolid Waste Management Report
SD-07 Certificates
1.5.4 GEmployee Training Records
1.5.4.1Certificate of Competency
SD-11 Closeout Submittals
3.6.1 GWaste Determination
Documentation
3.6.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.4 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.6.2.1 GSolid Waste Management Report
3.6.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.6.2.1 GSales Documentation
3.6.2.1Contractor Certification
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7 SRecords
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 39 PAGES
01 78 00 1.7.5Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
3.5As-Built Record of Equipment and Materials
3.4Construction Contract
Specifications
2.3 GCertification of EPA Designated
Items
3.8 GInterim DD FORM 1354
3.8 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 39 PAGES
01 78 23 3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.2.4Receipts
02 42 91 SD-01 Preconstruction Submittals
1.2 GWork Plan
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.7 GRecordkeeping
3.7 GException Report
3.8Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 39 PAGES
02 81 00 1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.6Waste Minimization
02 82 16.00 20 SD-03 Product Data
3.1.4 GLocal exhaust equipment
3.1.5 GVacuums
3.1.1.1 GRespirators
3.1.4 GPressure differential automatic
recording instrument
1.2.2 GAmended water
1.3.8 GMaterial Safety Data Sheets
(MSDS) for all materials
2.1 GEncapsulants
SD-06 Test Reports
1.5.5 GAir sampling results
1.5.6 GPressure differential recordings
for local exhaust system
3.3.3.2 GAsbestos disposal quantity report
3.2.6.3 GClearance sampling
SD-07 Certificates
1.3.9 GAsbestos hazard abatement plan
1.3.10 GTesting laboratory
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 39 PAGES
02 82 16.00 20 1.5.1 GPrivate qualified person documentation
1.5.4 GContractor's license
1.5.2 GCompetent person
1.5.3 GWorker's license
1.3.11 GLandfill approval
1.3.3 GEmployee training
1.3.12 GMedical certification
1.3.11 GWaste shipment records
1.3.6 GRespiratory Protection Program
1.3.11 GDelivery tickets
3.1.5 GVacuums
3.1.2.3 GWater filtration equipment
3.1.5 GVentilation systems
3.1 Gequipment used to contain
airborne asbestos fibers
2.1 Gencapsulants
1.3.4Notifications
SD-11 Closeout Submittals
1.3.4 GNotifications
1.6.1 GRental equipment
1.3.6.1 GRespirator program records
1.3.4 GPermits and licenses
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.2 GLead Compliance Plan
1.5.1.1 GCompetent Person
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 39 PAGES
02 83 13.00 20 1.5.1.2 GTraining Certification
1.5.2.8 Glead waste management plan
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 Gsampling results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.3 GTesting laboratory
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 Ghazardous waste manifest
3.5.2.1 Gturn-in documents or weight
tickets
03 01 00 SD-01 Preconstruction Submittals
1.5.2 GQualifications
1.5.3 GWork Plan
1.6.1 GWork Plan
SD-03 Product Data
2.4Conventional Concrete
2.5Polymers
2.6Miscellaneous Materials And
Equipment
SD-04 Samples
2.3Reinforcement And
Reinforcement Supports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 39 PAGES
03 01 00 SD-05 Design Data
3.1.3 GFormwork And Shoring
1.5.1 GRepair Procedures
2.7 GMixture Proportioning
SD-06 Test Reports
2.7Mixture Proportioning
3.1.5Quality Control
3.2.3Quality Control
3.3.3Quality Control
SD-07 Certificates
1.5.2Qualifications
2.3Reinforcement And
Reinforcement Supports
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.1.1Formwork
1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 39 PAGES
03 30 00 SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.3Recycled Aggregate Materials
2.3.1Cementitious Materials
2.4.6Vapor Retarder and Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 39 PAGES
03 30 00 1.6.4.3Aggregates
3.14.2.3 GCompressive Strength Tests
3.14.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.8.1Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
03 35 36 SD-03 Product Data
2.1.1 APenetrating Dye
SD-07 Certificates
1.3.1 CInstaller Qualifications
05 12 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 39 PAGES
05 12 00 1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.1.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
SD-05 Design Data
1.4.3 GDesign Calculations for Steel
Connections
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 39 PAGES
05 12 00 1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13 SD-02 Shop Drawings
2.5 GAngles and Plates
SD-03 Product Data
2.4 GAbrasive metal nosings
2.1 SRecycled Content
2.1 GCertificates of Compliance
05 52 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 39 PAGES
05 52 00 1.2.1 GFabrication Drawings
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-03 Product Data
2.2Roof Decking
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.8.1Certificates of Grade
1.7Preservative Treatment
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
2.1.3 SIndoor Air Quality for Hardwood
Plywood
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 39 PAGES
06 61 16 1.5.1Qualifications
2.3Fabrications
2.2.4 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
2.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.3Accessories
2.2Acoustic Batt Insulation
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 39 PAGES
07 21 16 3.2.1Insulation
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.13 GGutters
3.1.14 GDownspouts
2.2.1 GGravel Stops and fascia
3.1.15 GSplash Pans
3.1.10 GCounterflashing
3.1.12 GDrip Edges
2.1 SRecycled Content
SD-08 Manufacturer’s Instructions
1.4.2 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.2 GCleaning and Maintenance
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 39 PAGES
07 92 00 2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.5 GFrames
2.5 GFrames
2.5 SRecycled Content for Steel Frame
Product
2.3Accessories
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
08 11 76 SD-03 Product Data
2.3 GBifolding Metal Doors
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 39 PAGES
08 14 00 1.5Warranty
SD-11 Closeout Submittals
1.5Warranty
08 51 00 SD-02 Shop Drawings
3.1 GSchedule Of Work
SD-03 Product Data
2.2.2 GFasteners
3.1 GWindow
2.1.1 GSelf Adhering Air Barrier
08 60 45 SD-02 Shop Drawings
3.2 GShop Drawings
SD-03 Product Data
2.1 GTranslucent Panels
1.6Warranty
SD-06 Test Reports
2.1Test Reports
SD-07 Certificates
2.4Systems
1.4Qualifications
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.4 GKeying System
SD-03 Product Data
2.3 GHardware Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 39 PAGES
08 71 00 SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.3Glazing Accessories
2.2.3.1Sealants
SD-08 Manufacturer’s Instructions
2.2Setting and Sealing Materials
3.2Glass Setting
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.2Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.3Abuse Resistant Gypsum Board
2.1.6Accessories
2.1.1Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 39 PAGES
09 29 00 2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.1.4 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GMosaic Tile
2.1.1 SRecycled Content for Mosaic Tile
2.1.2 GGlazed Wall Tile
2.1.2 SRecycled Content for Glazed Wall
Tile
2.3 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.3.2 GGrout
SD-07 Certificates
2.3 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.6Maintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 39 PAGES
09 30 10 SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
2.3 SRecycled Content for Suspension
Systems
SD-04 Samples
2.2 GAcoustical Units
SD-07 Certificates
2.2.1.1 SIndoor Air Quality for Type XX
Ceiling Tiles
2.7 SIndoor Air Quality for Sealants
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories
SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives
SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 39 PAGES
09 65 00 3.3 GMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1 SIndoor Air Quality for Vinyl
Composition Tile
2.2 SIndoor Air Quality for Wall Base
2.4 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.8 GResilient Flooring and
Accessories
09 90 00 SD-03 Product Data
2.1 GCoating
3.3.5Sealant
SD-04 Samples
1.10 GColor
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2 GQualification Testing
2.1Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
3.4.1Application Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 39 PAGES
09 90 00 3.8.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 21 13 SD-02 Shop Drawings
2.1 GFabrication Drawings
3.2 GInstallation Drawings
SD-03 Product Data
2.1Cleaning and Maintenance
Instructions
2.7 GColors And Finishes
2.2.1 GAnchoring Devices and Fasteners
2.2.2 GHardware and Fittings
2.2.3 GDoor Hardware
2.5 GPilaster Shoes
SD-04 Samples
2.7 GColors and Finishes
SD-07 Certificates
1.6Warranty
SD-11 Closeout Submittals
2.3 SIndoor air quality for solid
phenolic, black core partitions and screens
10 28 13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 39 PAGES
10 28 13 2.2 GAccessory Items
2.1 SRecycled content for stainless
steel toilet accessories
SD-07 Certificates
2.2Accessory Items
1.3.1Baby Changing Stations
10 81 00 SD-02 Shop Drawings
2.1 GBird Control Devices
SD-03 Product Data
2.1 GBird Control Devices
SD-04 Samples
2.1 GBird Control Devices
SD-08 Manufacturer’s Instructions
2.1Bird Control Devices
21 13 17.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.9As-Built Drawings
SD-03 Product Data
1.4.1List of Submittals
2.1 GMaterials and Equipment
1.6Spare Parts
1.4.1 GFire Protection Specialist
1.4.2 GInstaller Qualifications
3.10 GOnsite Training
SD-06 Test Reports
3.8Preliminary Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 39 PAGES
21 13 17.00 10 3.9Final Acceptance Test
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10 GOperating and Maintenance
Instructions
22 00 00 SD-03 Product Data
2.4Fixtures
2.4.2Flush Valve Water Closets
2.4.2 SWaterSense Label for Flush
Valve Water Closet
2.4.3Flush Valve Urinals
2.4.3 SWaterSense Label for Urinal
2.4.5Countertop Lavatories
2.4.1 SWaterSense Label for Lavatory
Faucet
2.4.6Kitchen Sinks
1.5.1Welding
3.4 GVibration-Absorbing Features
3.8.1Plumbing System
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
SD-07 Certificates
1.3Materials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 39 PAGES
22 00 00 2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.8.1 GPlumbing System
22 07 19.00 40 SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.3 GAdhesives
2.3 GCoatings
2.3 GInsulating Cement
2.3 GInsulation Materials
2.3 GJacketing
2.3 GTape
SD-08 Manufacturer’s Instructions
3.1 GInstallation Manual
SD-11 Closeout Submittals
3.4Record Drawings
2.3 SAdhesives
2.3 SCoatings
2.3 SInsulation Materials
1.3.1 SRecycled Materials
23 00 00 SD-03 Product Data
2.9.1.1 GPropeller Type Power Roof
Ventilators
2.9.1.2 GCeiling Exhaust Fans
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 39 PAGES
23 00 00 3.8 GPerformance Tests
SD-07 Certificates
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.10.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.10.1 GOperation and Maintenance
Manuals
2.9.1.1 GPropeller Type Power Roof
Ventilators
2.9.1.2 GCeiling Exhaust Fans
23 05 93 SD-01 Preconstruction Submittals
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Design Review Report
1.5.7.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.7.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 39 PAGES
23 05 93 1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
1.5.7.4 GTAB Related HVAC Submittals
1.5.6 GTAB Procedures
1.5.6 GCalibration
1.3.3 GSystems Readiness Check
1.5.8 GTAB Execution
SD-06 Test Reports
1.5.3.2 GPrerequisite HVAC Work
Checkout List
3.6 GSeason 1
1.5.3.1 GTAB Design Review Report
1.5.9.1 GTAB Report for Season 1
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Submittal and Work
Schedule
1.5.3.2 GTAB Pre-Field Engineering
Report
1.5.5 GInstrument Calibration
Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 39 PAGES
23 05 93 3.6 GSeason 1
1.5.7.1 GTAB Firm
1.3.3 GDesign Review Report
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 09 53.00 20 SD-02 Shop Drawings
1.7.1 GControl System Diagrams
1.7.2 GOperating Parameters
1.7.4 GSequence of Operation
1.7.3 GWiring Diagram
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 39 PAGES
23 09 53.00 20 SD-03 Product Data
2.2 GSensors
2.3 GThermostats
SD-06 Test Reports
3.3.5 GPerformance Verification Test
SD-07 Certificates
3.3.4 GCertification of Completion
SD-08 Manufacturer’s Instructions
3.4.1 GTraining Course Documentation
SD-10 Operation and Maintenance
Data
1.9.5 GSpace Temperature Control
System
SD-11 Closeout Submittals
3.5 GQualified Service Organization
List
23 21 13.00 20 SD-02 Shop Drawings
1.3.1Hot water heating system
SD-03 Product Data
2.3.3 GExpansion tanks
2.3.4 GExternal air separation tanks
2.1.1Hot water heating pipe
SD-06 Test Reports
3.3.2Hydrostatic test of piping system
SD-07 Certificates
1.5.4.1 GWelding procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 39 PAGES
23 21 13.00 20 1.5.4.2 GWelder's qualifications
23 52 43.00 20 SD-02 Shop Drawings
1.3.2.2Fuel Train
1.3.2.2Wiring Diagram
SD-03 Product Data
2.1Boilers
2.3Boiler Trim and Control
Equipment
2.2Burners and Control Equipment
2.3.18Stack, Breeching, Combustion Air
Intake Duct and Supports
SD-06 Test Reports
3.4.1Operational Tests
1.3.3Water Analysis
SD-07 Certificates
2.1Boilers
2.2Burners and Control Equipment
2.3Boiler Trim and Control
Equipment
SD-08 Manufacturer’s Instructions
2.1Boilers
2.3.8Feedwater Treatment Feeder
SD-10 Operation and Maintenance
Data
2.1Boilers
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 39 PAGES
23 52 43.00 20 2.1Boilers
23 81 00 SD-03 Product Data
3.7.1Spare Parts
3.4Posted Instructions
3.6 GSystem Performance Tests
3.4 GTraining
2.1 GSupplied Products
2.2 GManufacturer's Standard Catalog
Data
SD-06 Test Reports
3.5Refrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates
3.7.2Service Organizations
SD-11 Closeout Submittals
2.2.2.3 SOzone Depleting Substances
23 82 00.00 20 SD-03 Product Data
2.1Unit Heaters
SD-10 Operation and Maintenance
Data
2.1Unit Heaters
23 83 00.00 20 SD-02 Shop Drawings
3.1Heater installation drawing
SD-03 Product Data
2.1Electric wall heaters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 39 PAGES
23 83 00.00 20 SD-10 Operation and Maintenance
Data
2.1Electric wall heaters
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1Material, Equipment, and Fixture
Lists
SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.2 GWire and Cable
3.2.1.8 GSplices and Connectors
2.1.3 GSwitches
2.1.4 GReceptacles
2.1.5 GOutlet Boxes, Pull Boxes and
Junction Boxes
2.1.7 GCircuit Breakers
2.1.6 GPanelboards
2.1.8 GLamps and Lighting Fixtures
2.1.10 GDry-Type Distribution
Transformers
SD-06 Test Reports
3.3 GContinuity Test
3.3 GPhase-Rotation Tests
3.3 GInsulation Resistance Test
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 20 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 39 PAGES
26 20 00 2.12 GPanelboards
2.14 GTransformers
2.25 GWireways
3.1.8.1 GMarking strips
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.9 GSwitches
2.14 GTransformers
2.17 GManual motor starters
2.26 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
3.5.3 GTransformer tests
3.5.4 GGround-fault receptacle test
SD-07 Certificates
2.10 GFuses
SD-09 Manufacturer’s Field
Reports
2.28.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 28 01.00 10 SD-03 Product Data
2.9Fault Current Analysis
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 39 PAGES
26 28 01.00 10 2.9Protective Device Coordination
Study
2.1Equipment
1.4.1System Coordinator
3.3.5Protective Relays
3.2Installation
SD-06 Test Reports
3.3Field Testing
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
1.5.2 GOccupancy/Vacancy Sensor
Coverage Layout
SD-03 Product Data
2.2 GLuminaires
2.4 GLight Sources
2.3Drivers
1.6.1 GLED Luminaire Warranty
1.5.4 GLuminaire Design Data
2.5.3.2 GVacancy Sensors
2.5.2 GDimming Controllers (Dimmers)
2.6.1 GExit Signs
2.6.2 GLED Emergency Drivers
2.5.3.1 GOccupancy Sensors
3.1.7 GAmbient Light Level Sensor
2.5.4 GLighting Control Panel
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 39 PAGES
26 51 00 1.5.5 GLED Luminaire - IES LM-79 Test
Report
1.5.6 GLED Light Source - IES LM-80
Test Report
1.5.7 GLED Light Source - IES TM-21
Test Report
1.5.8 GOccupancy/Vacancy Sensor
Verification Tests
1.5.11.3 GEnergy Efficiency
SD-07 Certificates
1.6.1.1 GLuminaire Useful Life Certificate
1.5.3 GLED Driver and Dimming Switch
Compatibility Certificate
26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
1.6.1 GLED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1 GLuminaire Drawings
SD-03 Product Data
2.2 GLED Luminaires
2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Power Supply Units
(Drivers)
2.3.1 GPhotocell
2.4Brackets
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 39 PAGES
26 56 00 1.5.3 GDesign Data for Luminaires
SD-06 Test Reports
1.5.4 GLED Luminaire - IES LM-79 Test
Report
1.5.5 GLED Light Source - IES LM-80
Test Report
3.2Operating Test
SD-07 Certificates
1.6.1 GLuminaire Useful Life Certificate
28 31 64.00 10 SD-02 Shop Drawings
1.3.2 GDetail Drawings
SD-03 Product Data
2.5 GStorage Batteries
2.1.2 GLow Battery Voltage
1.6 GSpecial Tools and Spare Parts
1.4 GTechnical Data and Computer
Software
3.6 GTraining
3.7 GTesting
SD-06 Test Reports
3.7 GTesting
SD-07 Certificates
2.1.6 GEquipment
1.3.1 GQualifications
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 39 PAGES
28 31 64.00 10 3.6 GOperating and Maintenance
Instructions
32 17 23 SD-03 Product Data
2.1.1.2 GSurface Preparation Equipment
List
2.1.2 GApplication Equipment List
3.2Exterior Surface Preparation
1.4.1 GSafety Data Sheets
2.2.9.2 GReflective media for roads
2.2.5 GThermoplastic compound
3.3.2 GThermoplastic compound
SD-06 Test Reports
2.2.9.2 GReflective Media for Roads
2.2.5 GThermoplastic Compound
3.3.2 GThermoplastic Compound
SD-07 Certificates
1.4.2 GQualifications
2.2.9.2Reflective Media for Roads
1.4.1 GVolatile Organic Compound
2.2.5Thermoplastic Compound
3.3.2Thermoplastic Compound
SD-08 Manufacturer’s Instructions
2.2.5 GThermoplastic Compound
3.3.2 GThermoplastic Compound
33 71 02 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 39 PAGES
33 71 02 2.9 GProtective Devices and
Coordination
SD-06 Test Reports
3.14.1 GField Acceptance Checks and
Tests
3.3 GCable Installation Plan and
Procedure
34 71 13.16 SD-02 Shop Drawings
2.1 GGuardrail Posts
2.2 GW-Beam Guardrail
SD-03 Product Data
2.2 GW-Beam Guardrail
SD-08 Manufacturer’s Instructions
3.3End Anchorage
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR