AD102.pdf
PDF 187 KB Posted
- Attached to
- DLA Warehouse 11 Renovation Federal contract opportunity
- Solicitation number
- W9123620B0017
About this file
This document package includes a demolition floor plan and specifications for renovations to Building 11 at the Defense Supply Center Richmond in Richmond, Virginia, as well as the corresponding federal contract solicitation.
The demolition floor plan outlines the scope of work for Phases 2 through 6 of the project, showing areas and components to be removed in Bays C, D, E, F, G, H, I, K, and L. Key aspects include demolishing plumbing fixtures and piping, doors and frames, floor finishes and base, internal downspouts, and a through-the-wall air conditioning unit. The specifications provide general demolition notes and hazardous material notes regarding lead-based paint and asbestos containing materials.
The solicitation is posted as an Invitation for Bid under number W9123620B0017 for the DLA Warehouse 11 Renovation project. The Army Corps of Engineers Norfolk District is listed as the contracting agency. Electronic bid submissions only will be accepted, as outlined in the IFB.
View the file
Other files for this federal contract opportunity
Show all 50
DLA Warehouse 11 Renovation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
K
I
H
G
F
E
D
C
B
A
14 15 16 17 18 19 20 21 22 23 24 25
BAY C
11-C
BAY D
11-D
OFFICE C
11C-5
TRANSPORTATION
POINT 1
11C-1
UNISEX
11C-2
COMM ROOM
11C-4
E195
E
E
E156E154
E104
A D
A D
3 3
5 2
13 13
15 15 15 15
15151515
20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV
NOTE: DIMENSIONS TYPICAL, ALL BAYS
120'-0" +/- FV
UNISEX
11C-3
= EXISTING PARTITIONS, DOORS, FRAMES,
CASEWORK, WOODWORK, PLUMBING FIXTURES,
ETC. TO BE REMOVED
= INDICATES EXISTING DOOR, AND SIDELITE
(WHEN INDICATED)
TO REMAIN
DEMOLITION PLAN SYMBOL LEGEND
= EXISTING CONSTRUCTION TO REMAIN
= NO WORK IN THIS AREA, NOT IN CONTRACT
= DASHED INDICATES EXISTING DOOR, FRAME,
HARDWARE AND SIDELITE (WHEN INDICATED) TO
BE REMOVED.
1. ONLY WORKERS SKILLED AND KNOWLEDGABLE IN THEIR RESPECTIVE
TRADES SHALL BE EMPLOYED IN THE DEMOLITION WORK.
2. BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. PROVIDE DUST
PARTITIONS TO SEPARATE DEMOLITION AREA FROM OCCUPIED
SPACES. CONTRACTOR TO PROVIDE ACCESS IN DUST PARTITIONS AS
REQUIRED TO PERFORM WORK AND MAINTAIN BUILDING EGRESS.
3. WHERE EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED,
THIS INCLUDES BUT IS NOT LIMITED TO PARTITIONS, DOOR
ASSEMBLIES, MISCELLANEOUS FIXTURES AND ATTACHMENTS, REFER
TO MEP, FP AND STRUCTURAL DRAWINGS FOR ADDITIONAL
REMOVALS NOT INDICATED HERE. COORDINATE EXTENT OF
DEMOLITION WITH NEW WORK, TYPICAL.
4. ALL EXISTING PARTITIONS NOTED TO BE REMOVED ARE NOMINAL 8"
C.M.U. UNLESS NOTED OTHERWISE.
5. FOR ALL REMOVALS, PATCH AND OR INFILL FLUSH WITH ADJACENT
EXISTING TO REMAIN. PREPARE ALL SURFACES TO ACCEPT NEW
FINISHES, TYPICAL.
6. SEE MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION
DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS NOT
INDICATED HERE, TYPICAL.
7. ALL SUPERSTRUCTURE COLUMNS, BEAMS, JOISTS, AND DECKS SHALL
REMAIN UNLESS NOTED TO BE REMOVED ON THE STRUCTURAL
DRAWINGS, TYPICAL.
8. SEE EQUIPMENT DEMO PLAN FOR ADDITIONAL INFORMATION NOT
INDICATED ON THIS PLAN.
DEMOLITION PLAN GENERAL NOTES:
0' 8' 16' 32' 64'
KEY PLAN
CB DA E F G H I K L
T R
U E
N O
R T H
PLAN
NORTH
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
N O
R F
O L K
D
IS
T R
IC
T
F
R O
N T
S T
R E
E T
N O
R F
O L K
V
IR
G
IN
IA
J
O N
E S
F R
A N
K L
IN
R D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
F
IL
E N
A M
E
C A
T E
G O
R Y
C O
D E
N
A O
F
IL
E N
O
W -2
-B
-0
W -1
-F
-0
D S
A L T
S M
A N
FOR OFFICIAL USE ONLY
FOR CONSTRUCTION
AD102
D E
M O
L
IT
IO
N
F L
O O
R P
L A
N
B A
Y C
D
P
H A
S E
D E
F E
N S
E S
U P
P L Y
C E
N T
E R
R
IC
H M
O N
D R
IC
H
M O
N D
V A
R M
O R
S O
N
T S
H O
U S
E
P Z
O O
K
M
A R
C H
R E
N O
V A
T
IO
N S
T O
B U
IL
D
IN
G
D
D R
V
P R
O J E
C T
N U
M B
E R
P
.0
.0
A D
.D
W G
1/16" = 1'-0"AD102
DEMOLITION FLOOR PLAN - BAY C & D
- PHASE 2
DEMOLITION PLAN KEYNOTES
2 DEMO EXISTING PLUMBING FIXTURES, PIPING, AND SUPPORTS
3 DEMO EXISTING DOOR, FRAME, AND HARDWARE. PREPARE
OPENING TO RECEIVE NEW DOOR, HARDWARE, AND FRAME
5 DEMO EXISTING FLOOR FINISHES AND BASE. CLEAN AND
REMOVE ADHESIVES TO ACCEPT NEW FLOOR FINISH
9 PATCH EXISTING WALLS GYPSUM DRYWALL TO MATCH
EXISTING OF SUFFICIENT THICKNESS TO MAINTAIN UNIFORM
WALL THICKNESS. ALL EXPOSED PORTIONS OF WALL SHALL BE
SANDED AND LEFT IN A PAINT READY CONDITION
10 EXISTING CMU WALL TO REMAIN AND BE REPAINTED
12 REPAIR EXISTING STAIRS AND RAILINGS
13 REPAIR EXISTING WINDOW AS NECESSARY (REPAIR/REPLACE
GLASS, RE-PUTTY, SAND, AND REPAINT)
15 REMOVE EXISTING INTERNAL DOWNSPOUTS AND CAP AT SLAB,
SEE 9/S501
18 DEMOLISH THRU-THE-WALL PACKAGED TERMINAL AIR
CONDITIONING UNIT, INFILL WALL TO MATCH EXISTING
HAZARDOUS BUILDING MATERIAL NOTES
1. PERIMETER WALLS PAINTED RED AND BROWN ARE COATED WITH
LEAD-BASED PAINT.
2. BRICK WALLS WITHIN BREAK ROOM AND OFFICE / COMMUNICATION
ROOM PAINTED GREEN OVER WHITE, GREEN OVER WHITE OVER OFF-
WHITE, GREEN OVER GRAY, AND TEAL OVER OFF-WHITE ARE COATED
WITH LEAD-BASED PAINT.
3. WOODEN DOORS FOR BREAK ROOM AND OFFICE PAINTED GREEN AND
OFF-WHITE OVER WHITE OVER GRAY OVER GREEN ARE COATED WITH
LEAD-BASED PAINT.
4. METAL DOOR CASINGS IN C BAY, D BAY, BREAK ROOM AND OFFICE /
COMMUNICATION ROOM PAINTED OFF-WHITE, OFF-WHITE OVER
GREEN, WHITE OVER GREEN, AND GREEN ARE COATED WITH LEAD-
BASED PAINT.
5. CONCRETE HEADER IN BREAK ROOM PAINTED GREEN IS COATED WITH
LEAD-BASED PAINT.
6. CONCRETE WINDOW APRONS PAINTED GREEN AND TEAL OVER WHITE
AND METAL WINDOW SASHES IN BREAK ROOM AND OFFICE /
COMMUNICATION ROOM PAINTED GREEN AND OFF- WHITE OVER
WHITE OVER, AND GRAY OVER GREEN ARE COATED WITH LEAD-BASED
PAINT.
7. COVE BASE IN OFFICE PAINTED BLACK OVER WHITE IS COATED WITH
LEAD-BASED PAINT.
8. CONTRACTOR TO ASSESS STAIR / STAIR RAILINGS PRIOR TO
DEMOLITION FOR LEAD-BASED PAINT.
9. LEAD-BASED PAINT SUMMARY BASED ON SCREENING PERFORMED BY
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, LLC DETAILED
ON FIGURE TITLED “WAREHOUSE NO. 11” AND DATA SHEETS TITLED “X-
RAY FLUORESCENCE (XRF) LEAD DATA – WAREHOUSE 11”. SCREENING
WAS PERFORMED ON APRIL 24 AND 25, AND ON AUGUST 22, 2013.
10.TELECOMMUNICATION ROOM WAS REPORTEDLY NON-ACCESSIBLE
(LEAD-BASED PAINT SCREENING IN 2013). CONTRACTOR TO ASSESS
ROOM FOR LEAD-BASED PAINT PRIOR TO DEMOLITION ACTIVITIES.
11.EXISTING DOORS FOR DEMOLITION NOT ANTICIPATED TO BE
ASBESTOS CONTAINING. PUMP ROOM DOORS LOCATED ON THE EAST
SIDE OF THE BUILDING ARE ASBESTOS CONTAINING. SEE U.S. ARMY
CORPS OF ENGINEERS, BALTIMORE DISTRICT REPORT TITLED
“ASBESTOS RE-INSPECTION REPORT FOR BUILDING NO. 11 AT
DEFENSE SUPPLY CENTER RICHMOND, RICHMOND, VIRGINIA” DATED
JUNE 5, 2018.
12.12-INCH BY 12-INCH BROWN AND LIGHT BROWN FLOOR TILES IN C BAY
OFFICE / COMMUNICATION ROOM ARE ASBESTOS CONTAINING.
13.CANVAS WRAPPED AIRCELL PIPE INSULATION AND MUD FITTINGS IN C
BAY BREAK ROOM ARE ASBESTOS CONTAINING.
14.EXISTING DOORS FOR DEMOLITION NOT ANTICIPATED TO BE
ASBESTOS CONTAINING. PUMP ROOM DOORS LOCATED ON THE EAST
SIDE OF THE BUILDING ARE ASBESTOS CONTAINING. SEE U.S. ARMY
CORPS OF ENGINEERS, BALTIMORE DISTRICT REPORT TITLED
“ASBESTOS RE-INSPECTION REPORT FOR BUILDING NO. 11 AT
DEFENSE SUPPLY CENTER RICHMOND, RICHMOND, VIRGINIA” DATED
JUNE 5, 2018.
15.CONTRACTOR TO ASSESS SHEET ROCK AND SHEET ROCK MUD FOR
ASBESTOS PRIOR TO DEMOLITION.
A
M E
N D
M E
N T
/6
/2
| Sheets |
| A-101 - FLOOR PLAN - BAY A & B - PHASE 1 |
| A-131 - FINISH FLOOR PLAN - BAY A & B - PHASE 1 |
| A-132 - FINISH FLOOR PLAN - BAY C & D - PHASE 2 |
| A-133 - FINISH FLOOR PLAN - BAY E & F - PHASE 3 |
| A-134 - FINISH FLOOR PLAN - BAY G & H - PHASE 4 |
| A-135 - FINISH FLOOR PLAN - BAY I & K - PHASE 5 |
| A-136 - FINISH FLOOR PLAN - BAY L - PHASE 6 |
| A-310 - TRANSVERSE BUILDING SECTIONS |
| A-311 - TRANSVERSE BUILDING SECTIONS |
| A-321 - WALL SECTIONS |
| A-401 - ENLARGED FLOOR PLANS |
| A-403 - ENLARGED FLOOR PLANS AND SECTIONS |
| A-404 - ENLARGED TOILET PLANS, SECTIONS, AND ELEVATIONS |
| A-405 - ENLARGED TOILET PLANS, SECTIONS, AND ELEVATIONS |
| A-501 - MISCELLANEOUS DETAILS |
| AD102 - DEMOLITION FLOOR PLAN - BAY C & D - PHASE 2 |
| AD103 - DEMOLITION FLOOR PLAN - BAY E & F - PHASE 3 |
| G-001 - COVER SHEET |
| G-002 - SHEET INDEX |
File details come from the government source that posted it. Updated .