This amendment modifies an invitation for bid for renovation services at Defense Logistics Agency Warehouse 11. The solicitation seeks bids for construction services including electrical, mechanical, and architectural work. Bids must be submitted electronically by the date specified in the IFB. Drawings and specifications are provided as attachments outlining the scope of work. Eligible vendors will renovate the building systems and interior spaces at the agency facility located in Norfolk, Virginia. The Department of the Army Corps of Engineers Engineering District Norfolk will evaluate bids and award a firm-fixed price contract for the base year of work.
View the file
Other files for this federal contract opportunity
Show all 50
DLA Warehouse 11 Renovation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is issued to add a technical draw ing to this IFB due to RFI response
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B0017
X 9B. DATED (SEE ITEM 11)
01-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-May-2020
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123620B0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Amend 6 A502 1 page
Amendments:
Specifications:
01 11.00 05 50 16 pages 01 32 01 00 10 18 pages 01 33 29 14 pages
05 12 00 14 pages 07 54 19 13 pages 08 51 00 5 pages 09 29 00 11 pages 23 52 43 00 20 10 pages
Drawings A-101 1 page A-131 1 page A-132 1 page A-133 1 page A-134 1 page A-135 1 page A-136 1 page A-310 1 page A-311 1 page A-321 1 page A-401 1 page A-403 1 page A-501 1 page AD102 1 page AD103 1 page G-001 1 page G-002 1 page PD102 1 page Project. 3 pages (specifications) Register 39 pages (submittals)
RTA Reno to Bldg 1001 dated 12/ MARCH 2020 145 pages
The Following Solicitation Wil have the following Atachments:
Final Drawings DSCR Building 11 10 Oct2019 144 Pages Technical Specifications Renovation to Bldg 11 1 Oct 2019 1,142 pages
Drawings Revisions
A-100 1 Page A-111 1 Page A-112 1 Page A-113 1 Page A-114 1 Page A-115 1 Page A-116 1 Page A-201 1 Page A-202 1 Page
Technical Specifications Renovation to Bldg 11 1 Oct 2019 1,142 pages
(End of clause)
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
ATTACHMENTS
Amendment 0006
A502 1 page
Amentment 0005 revised drawings/specifications
Specifications:
01 11.00 05 50 16 pages 01 32 01 00 10 18 pages 01 33 29 14 pages 05 12 00 14 pages 07 54 19 13 pages 08 51 00 5 pages 09 29 00 11 pages 23 52 43 00 20 10 pages
Drawings A-101 1 page A-131 1 page A-132 1 page A-133 1 page A-134 1 page A-135 1 page A-136 1 page A-310 1 page A-311 1 page A-321 1 page A-401 1 page A-403 1 page A-501 1 page AD102 1 page AD103 1 page G-001 1 page G-002 1 page PD102 1 page Project. 3 pages (specifications) Register 39 pages (submittals)
RTA Reno to Bldg 1001 dated 12/ MARCH 2020 145 pages
The Following Solicitation Wil have the following Atachments:
Technical Specifications Renovation to Bldg 11 1 Oct 2019 1,142 pages
Drawings Revisions
A-100 1 Page A-111 1 Page A-112 1 Page A-113 1 Page A-114 1 Page A-115 1 Page A-116 1 Page A-201 1 Page A-202 1 Page A-203 1 Page A-310 1 Page A-311 1 Page A-321 1 Page A-403 1 Page A-501 1 Page AD100 1 Page
Spec Revision
02 42 91 5 Pages 07 54 19 13 Pages 10 81 00 6 Pages Spec Table of Contant 3 Pages
(End of Summary of Changes)