AD103.pdf

PDF 193 KB Posted

Attached to
DLA Warehouse 11 Renovation Federal contract opportunity
Solicitation number
W9123620B0017
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This demolition floor plan and related federal contract opportunity provide details for renovations to Building 11 at the Defense Supply Center in Richmond, Virginia. The solicitation is an IFB posted by the Department of the Army Corps of Engineers seeking demolition and renovation services across multiple phases for Bays A through L. Electronic bid submissions only will be accepted by the June 5, 2020 deadline. The demolition floor plan depicts the scope of work for Phases 3 and 4, including removal of partitions, plumbing fixtures, doors and frames, floor finishes and hazardous materials from Bays E and F. Notes specify preparation and patching requirements and identify lead-based paint locations. The opportunity is firm-fixed price and involves multiple military construction appropriations.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Warehouse 11 Renovation, newest first.
File Type Posted
Warehouse 11 KO Signed Page 1.pdf PDF
Warehouse 11 page 3.pdf PDF
ProjNet Responses Amend 7.pdf PDF
A-502.pdf PDF
20-B-0017 Amendment 6.pdf PDF
AD102.pdf PDF
23 52 43.00 20.pdf PDF
A-501.pdf PDF
08 51 00.pdf PDF
G-001.pdf PDF
PD102.pdf PDF
A-133.pdf PDF
09 29 00.pdf PDF
07 54 19.pdf PDF
A-135.pdf PDF
A-101.pdf PDF
05 12 00.pdf PDF
A-310.pdf PDF
_RTA_Reno_to_Bldg_11_DDRV_Full_Plan_Set_thru_Amendment02.pdf PDF
A-134.pdf PDF
A-136.pdf PDF
01 33 29.pdf PDF
01 11 00.05 50.pdf PDF
A-321.pdf PDF
A-311.pdf PDF
01 32 01.00 10.pdf PDF
20-B-0017 Amendment 4.pdf PDF
A.01.13 Specs Table of Contents.pdf PDF
A.01.13 A-321.pdf PDF
A.01.13 AD100.pdf PDF
A.01.13 A-100.pdf PDF
A.01.13 07 54 19.pdf PDF
A.01.13 A-403.pdf PDF
A.01.13 10 81 00.pdf PDF
A.01.13 A-113.pdf PDF
A.01.13 A-114.pdf PDF
A.01.13 A-311.pdf PDF
A.01.13 A-115.pdf PDF
A.01.13 02 42 91.pdf PDF
A.01.13 A-501.pdf PDF
A.01.13 A-111.pdf PDF
A.01.13 A-112.pdf PDF
A.01.13 A-310.pdf PDF
A.01.13 A-202.pdf PDF
WH 11 Site Visit.pdf PDF
20-B-0017 Amendment 2.pdf PDF
_RTA_Reno_to_Bldg_11_DDRV_Full_Plan_Set.pdf PDF
_P_2015_01503_003_specs_RTA.pdf PDF
20-B-0017 Amend 1.pdf PDF
A.01.13 WH11 Final Drawings.pdf PDF
Show all 50

DLA Warehouse 11 Renovation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K

I

H

G

F

E

D

C

B

A

26 27 28 29 30 31 32 33 34 35 36 37

BAY E

11-E

BAY F

11-F

OFFICE

11F-6

TRANSPORTATION

POINT 2

11F-1

OFFICE F

11F-5

BREAK ROOM F

11F-2

WOMEN'S

TOILET

11F-3

VESTIBULE

11F-4

MEN'S TOILET

11F-4

E106

E193

E191

E

E

E189

E

E

E160E158

A D

A D

32 4

PUMP ROOM

15 15 15 15

15151515

20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV 20'-0" +/- FV

NOTE: DIMENSIONS TYPICAL, ALL BAYS

120'-0" +/- FV

9 18

= EXISTING PARTITIONS, DOORS, FRAMES,

CASEWORK, WOODWORK, PLUMBING FIXTURES,

ETC. TO BE REMOVED

= INDICATES EXISTING DOOR, AND SIDELITE

(WHEN INDICATED)

TO REMAIN

DEMOLITION PLAN SYMBOL LEGEND

= EXISTING CONSTRUCTION TO REMAIN

= NO WORK IN THIS AREA, NOT IN CONTRACT

= DASHED INDICATES EXISTING DOOR, FRAME,

HARDWARE AND SIDELITE (WHEN INDICATED) TO

BE REMOVED.

1. ONLY WORKERS SKILLED AND KNOWLEDGABLE IN THEIR RESPECTIVE

TRADES SHALL BE EMPLOYED IN THE DEMOLITION WORK.

2. BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. PROVIDE DUST

PARTITIONS TO SEPARATE DEMOLITION AREA FROM OCCUPIED

SPACES. CONTRACTOR TO PROVIDE ACCESS IN DUST PARTITIONS AS

REQUIRED TO PERFORM WORK AND MAINTAIN BUILDING EGRESS.

3. WHERE EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED,

THIS INCLUDES BUT IS NOT LIMITED TO PARTITIONS, DOOR

ASSEMBLIES, MISCELLANEOUS FIXTURES AND ATTACHMENTS, REFER

TO MEP, FP AND STRUCTURAL DRAWINGS FOR ADDITIONAL

REMOVALS NOT INDICATED HERE. COORDINATE EXTENT OF

DEMOLITION WITH NEW WORK, TYPICAL.

4. ALL EXISTING PARTITIONS NOTED TO BE REMOVED ARE NOMINAL 8"

C.M.U. UNLESS NOTED OTHERWISE.

5. FOR ALL REMOVALS, PATCH AND OR INFILL FLUSH WITH ADJACENT

EXISTING TO REMAIN. PREPARE ALL SURFACES TO ACCEPT NEW

FINISHES, TYPICAL.

6. SEE MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION

DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS NOT

INDICATED HERE, TYPICAL.

7. ALL SUPERSTRUCTURE COLUMNS, BEAMS, JOISTS, AND DECKS SHALL

REMAIN UNLESS NOTED TO BE REMOVED ON THE STRUCTURAL

DRAWINGS, TYPICAL.

8. SEE EQUIPMENT DEMO PLAN FOR ADDITIONAL INFORMATION NOT

INDICATED ON THIS PLAN.

DEMOLITION PLAN GENERAL NOTES:

0' 8' 16' 32' 64'

KEY PLAN

CB DA E F G H I K L

T R

U E

N O

R T H

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

N O

R F

O L K

D

IS

T R

IC

T

F

R O

N T

S T

R E

E T

N O

R F

O L K

V

IR

G

IN

IA

J

O N

E S

F R

A N

K L

IN

R D

S U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

F

IL

E N

A M

E

C A

T E

G O

R Y

C O

D E

N

A O

F

IL

E N

O

W -2

-B

-0

W -1

-F

-0

D S

A L T

S M

A N

FOR OFFICIAL USE ONLY

FOR CONSTRUCTION

AD103

D E

M O

L

IT

IO

N

F L O

O R

P L A

N

B A

Y E

F

P

H A

S E

D E

F E

N S

E S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D R

IC

H

M O

N D

V A

R M

O R

S O

N

T S

H O

U S

E

P Z

O O

K

M

A R

C H

R E

N O

V A

T

IO

N S

T O

B U

IL

D

IN

G

D

D R

V

P R

O J E

C T

N U

M B

E R

P

.0

.0

A D

.D

W G

1/16" = 1'-0"AD103

DEMOLITION FLOOR PLAN - BAY E & F

- PHASE 3

DEMOLITION PLAN KEYNOTES

1 DEMO EXISTING TOILET ROOM PARTITIONS AS REQUIRED FOR

NEW CONSTRUCTION

2 DEMO EXISTING PLUMBING FIXTURES, PIPING, AND SUPPORTS

3 DEMO EXISTING DOOR, FRAME, AND HARDWARE. PREPARE

OPENING TO RECEIVE NEW DOOR, HARDWARE, AND FRAME

4 DEMO EXISTING COUNTERTOPS, BASE, AND UPPER CABINETS

5 DEMO EXISTING FLOOR FINISHES AND BASE. CLEAN AND

REMOVE ADHESIVES TO ACCEPT NEW FLOOR FINISH

9 PATCH EXISTING WALLS GYPSUM DRYWALL TO MATCH

EXISTING OF SUFFICIENT THICKNESS TO MAINTAIN UNIFORM

WALL THICKNESS. ALL EXPOSED PORTIONS OF WALL SHALL BE

SANDED AND LEFT IN A PAINT READY CONDITION

12 REPAIR EXISTING STAIRS AND RAILINGS

13 REPAIR EXISTING WINDOW AS NECESSARY (REPAIR/REPLACE

GLASS, RE-PUTTY, SAND, AND REPAINT)

15 REMOVE EXISTING INTERNAL DOWNSPOUTS AND CAP AT SLAB,

SEE 9/S501

18 DEMOLISH THRU-THE-WALL PACKAGED TERMINAL AIR

CONDITIONING UNIT, INFILL WALL TO MATCH EXISTING

HAZARDOUS BUILDING MATERIAL NOTES

1. PERIMETER BRICK WALLS PAINTED RED, WHITE AND BROWN ARE

COATED WITH LEAD-BASED PAINT

2. METAL DOOR CASINGS IN E AND F BAYS PAINTED OFF-WHITE OVER

GREEN AND GREEN ARE COATED WITH LEAD-BASED PAINT.

3. METAL DOOR CASINGS IN NORTH AND EAST WALLS IN THE OFFICE

PAINTED OFF-WHITE OVER GREEN ARE COATED WITH LEAD-BASED

PAINT.

4. WOODEN DOOR CASINGS IN THE BAY EXTERIOR PAINTED DARK

BROWN OVER YELLOW ARE COATED WITH LEAD-BASED PAINT.

5. METAL DOOR JAMB PAINTED DARK BROWN IN VESTIBULE IS COATED

WITH LEAD-BASED PAINT.

6. WHITE CERAMIC SINK BASIN IN MEN’S BATHROOM IS COATED WITH

LEAD-BASED PAINT.

7. OFF-WHITE CERAMIC WALLS IN THE MEN’S AND WOMEN’S BATHROOM

CONTAINS LEAD- BASED COATING.

8. CONTRACTOR TO ASSESS STAIR / STAIR RAILINGS PRIOR TO

DEMOLITION FOR LEAD-BASED PAINT.

9. LEAD-BASED PAINT SUMMARY BASED ON SCREENING PERFORMED BY

ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, LLC DETAILED

ON FIGURE TITLED “WAREHOUSE NO. 11” AND DATA SHEETS TITLED “X-

RAY FLUORESCENCE (XRF) LEAD DATA – WAREHOUSE 11”.

SCREENING WAS PERFORMED ON APRIL 24 AND 25, AND ON AUGUST

22, 2013.

10.TELECOMMUNICATION ROOM WAS REPORTEDLY NON-ACCESSIBLE

(LEAD-BASED PAINT SCREENING IN 2013). CONTRACTOR TO ASSESS

ROOM FOR LEAD-BASED PAINT PRIOR TO DEMOLITION ACTIVITIES.

A

M E

N D

M E

N T

/6

/2

Sheets
A-101 - FLOOR PLAN - BAY A & B - PHASE 1
A-131 - FINISH FLOOR PLAN - BAY A & B - PHASE 1
A-132 - FINISH FLOOR PLAN - BAY C & D - PHASE 2
A-133 - FINISH FLOOR PLAN - BAY E & F - PHASE 3
A-134 - FINISH FLOOR PLAN - BAY G & H - PHASE 4
A-135 - FINISH FLOOR PLAN - BAY I & K - PHASE 5
A-136 - FINISH FLOOR PLAN - BAY L - PHASE 6
A-310 - TRANSVERSE BUILDING SECTIONS
A-311 - TRANSVERSE BUILDING SECTIONS
A-321 - WALL SECTIONS
A-401 - ENLARGED FLOOR PLANS
A-403 - ENLARGED FLOOR PLANS AND SECTIONS
A-404 - ENLARGED TOILET PLANS, SECTIONS, AND ELEVATIONS
A-405 - ENLARGED TOILET PLANS, SECTIONS, AND ELEVATIONS
A-501 - MISCELLANEOUS DETAILS
AD102 - DEMOLITION FLOOR PLAN - BAY C & D - PHASE 2
AD103 - DEMOLITION FLOOR PLAN - BAY E & F - PHASE 3
G-001 - COVER SHEET
G-002 - SHEET INDEX

File details come from the government source that posted it. Updated .