This is an amendment to a solicitation for the DLA Warehouse 11 Renovation project. The amendment revises specifications, drawings, and other contract documents. Key changes include removing commissioning and sustainability requirements, deleting several specification sections, adding and revising drawings, and adjusting notes and requirements across multiple drawings. The solicitation number is W9123620B0017 and electronic bid submissions are required by the specified due date. The solicitation is for renovation work to be performed at Building 11 and is issued by the Department of the Army Corps of Engineers Norfolk District.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Warehouse 11 Renovation, newest first.
File Type Posted
Warehouse 11 KO Signed Page 1.pdf PDF
Warehouse 11 page 4.pdf PDF
Warehouse 11 page 2.pdf PDF
ProjNet Responses Amend 7.pdf PDF
20-B-0017 Amendment 7.pdf PDF
A-502.pdf PDF
AD102.pdf PDF
23 52 43.00 20.pdf PDF
A-501.pdf PDF
08 51 00.pdf PDF
G-001.pdf PDF
AD103.pdf PDF
PD102.pdf PDF
A-133.pdf PDF
09 29 00.pdf PDF
07 54 19.pdf PDF
A-135.pdf PDF
A-101.pdf PDF
05 12 00.pdf PDF
A-310.pdf PDF
_RTA_Reno_to_Bldg_11_DDRV_Full_Plan_Set_thru_Amendment02.pdf PDF
A-403.pdf PDF
A-401.pdf PDF
PROJECT.pdf PDF
A-132.pdf PDF
REGISTER.pdf PDF
20-B-0017 Amendment 4.pdf PDF
A.01.13 Specs Table of Contents.pdf PDF
A.01.13 A-321.pdf PDF
A.01.13 AD100.pdf PDF
A.01.13 A-100.pdf PDF
A.01.13 07 54 19.pdf PDF
A.01.13 A-403.pdf PDF
A.01.13 10 81 00.pdf PDF
A.01.13 A-113.pdf PDF
A.01.13 A-114.pdf PDF
A.01.13 A-311.pdf PDF
A.01.13 A-115.pdf PDF
A.01.13 02 42 91.pdf PDF
A.01.13 A-201.pdf PDF
A.01.13 A-203.pdf PDF
20-B-0017 Amendment 3.pdf PDF
A.01.13 A-116.pdf PDF
WH 11 Site Visit.pdf PDF
20-B-0017 Amendment 2.pdf PDF
_RTA_Reno_to_Bldg_11_DDRV_Full_Plan_Set.pdf PDF
20-B-0017 Amend 1.pdf PDF
A.01.13 WH11 Final Drawings.pdf PDF
A.01.13 WH11 Final Specifications.pdf PDF
20-F-0017 WH 11.pdf PDF
Show all 50

DLA Warehouse 11 Renovation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is issued to incorporate the technical revisions in response to RFI's

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B0017

X 9B. DATED (SEE ITEM 11)

01-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-May-2020

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123620B0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

AMENDMENT #2:

The solicitation is amended as follows:

The following items represent changes to the contract scope. These changes apply across the entire solicitation.

REQUEST FOR PROPOSAL IS AMENDED AS FOLLOWS:

1. SPECIFICATION TOC:

REPLACE Specification Table of Contents with Updated TOC.

2. SPECIFICATION SUBMITTAL REGISTER:

DELETE HPSB Checklist submittals DELETE 07 22 00 submittals DELETE 08 33 23 submittals ADD 08 51 00 submittals

3. SPECIFICATION SECTION 01 11 00.05 50:

DELETE “repair brick walls” from para. 1.2.1.

4. SPECIFICATION SECTION 01 32 01.00 10:

DELETE commissioning requirements and references thereto.

5. SPECIFICATION SECTION 01 33 29:

DELETE the “High Performance and Sustainable Building checklist” requirement and all corresponding text thereto.

6. SPECIFICATION SECTION 05 12 00:

DELETE para. 1.3 AISC QUALITY CERTIFICATION.

7. SPECIFICATION SECTION 07 54 19:

DELETE insulation requirements and references thereto.

8. SPECIFICATION SECTION 08 33 23:

DELETE Section 08 33 23 OVERHEAD COILING DOORS in its entirety.

9. SPECIFICATION SECTION 08 51 00:

ADD Section 08 51 00 METAL WINDOWS to the Project.

10. SPECIFICATION SECTION 09 29 00:

REVISED paragraph 3.3 to remove Level 5 finish.

11. DRAWING G-001

UPDATE VICINITY MAP AND HAUL ROUTE

12. DRAWING G-002

ADDED NEW SHEET – A-405

13. DRAWING AD102

REMOVED DEMO NOTE 1 IN ROOM 11C-2

SHIFTED DEMO NOTES 18 AND 9 IN ROOM 11C-5

14. DRAWING AD103

ADJUSTED EXISTING WINDOWS IN ROOMS 11F-2 AND 11F-5

15. DRAWING A-101

ADJUSTED NOTE:

“EXISTING” FIXED LADDER

16. DRAWING A-131

ADJUSTED NOTE:

ALL HOLLOW-METAL DOOR FRAMES TO MATCH BUILDING STANDARD, UNLESS NOTES

OTHERWISE

17. DRAWING A-132

ADJUSTED NOTE:

ALL HOLLOW-METAL DOOR FRAMES TO MATCH BUILDING STANDARD, UNLESS NOTES

OTHERWISE

18. DRAWING A-133

ADJUSTED NOTE:

ALL HOLLOW-METAL DOOR FRAMES TO MATCH BUILDING STANDARD, UNLESS NOTES

OTHERWISE

19. DRAWING A-134

ADJUSTED NOTE:

ALL HOLLOW-METAL DOOR FRAMES TO MATCH BUILDING STANDARD, UNLESS NOTES

OTHERWISE

20. DRAWING A-135

ADJUSTED NOTE:

ALL HOLLOW-METAL DOOR FRAMES TO MATCH BUILDING STANDARD, UNLESS NOTED

OTHERWISE

21. DRAWING A-136

ADJUSTED NOTE:

ALL HOLLOW-METAL DOOR FRAMES TO MATCH BUILDING STANDARD, UNLESS NOTED

OTHERWISE

22. DRAWING A-401

ADDED WINDOW TAG IN VIEW 1/A-401 IN ROOM 11C-5

ADJUSTED EXISTING WINDOWS IN VIEW 2/A-401 IN ROOM 11F-2 AND 11F-5

23. DRAWING A-403

ADJUSTED TEXT IN 1/A-403 AND 5/A-403

ADJUSTED RAILING TO MEET ABA STANDARDS IN THE FOLLOWING VIEWS:

1/A-403

2/A-403

5/A-403

6/A-403

8/A-403

24. DRAWING A-404

UPDATED EQUIPMENT IN TOILET ROOMS IN VIEWS:

9/A-404

10/A-404

ADDED INERIOR ELEVATIONS IN ROOMS 11I-2 AND 11I-3

ADDED DIMNSIONS IN VIEW 11/A-404

ADJUSTED NOTE IN VIEW 11/A-404

ADDED NOTE TO REFER TO SHEET G-005 FOR MOUNTING HEIGHTS

25. DRAWING A-405

NEW SHEET

ENLARGED FLOOR PLAN OF TOILET ROOMS IN BAY F

INTERIOR ELEVATIONS OF TOILET ROOMS IN BAY F

ADDED NOTE TO REFER TO SHEET G-005 FOR MOUNTING HEIGHTS

26. DRAWING PD102

DELETE existing plumbing fixtures on 1/PD102 DEMOLITION ENLARGED PLAN – BAY C

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Amendments:

Specifications:

01 11.00 05 50 16 pages 01 32 01 00 10 18 pages 01 33 29 14 pages 05 12 00 14 pages 07 54 19 13 pages 08 51 00 5 pages 09 29 00 11 pages 23 52 43 00 20 10 pages

Drawings A-101 1 page A-131 1 page A-132 1 page A-133 1 page A-134 1 page A-135 1 page A-136 1 page A-310 1 page A-311 1 page A-321 1 page A-401 1 page A-403 1 page A-501 1 page AD102 1 page AD103 1 page G-001 1 page G-002 1 page PD102 1 page Project. 3 pages (specifications)

Register 39 pages (submittals)

RTA Reno to Bldg 1001 dated 12/ MARCH 2020 145 pages

The Following Solicitation Wil have the following Atachments:

Final Drawings DSCR Building 11 10 Oct2019 144 Pages Technical Specifications Renovation to Bldg 11 1 Oct 2019 1,142 pages

Drawings Revisions

A-100 1 Page A-111 1 Page A-112 1 Page A-113 1 Page A-114 1 Page A-115 1 Page A-116 1 Page A-201 1 Page A-202 1 Page

Technical Specifications Renovation to Bldg 11 1 Oct 2019 1,142 pages

(End of clause)

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

ATTACHMENTS

Amentment 0005 revised drawings/specifications

Specifications:

01 11.00 05 50 16 pages 01 32 01 00 10 18 pages 01 33 29 14 pages 05 12 00 14 pages 07 54 19 13 pages 08 51 00 5 pages 09 29 00 11 pages 23 52 43 00 20 10 pages

Drawings A-101 1 page A-131 1 page

A-132 1 page A-133 1 page A-134 1 page A-135 1 page A-136 1 page A-310 1 page A-311 1 page A-321 1 page A-401 1 page A-403 1 page A-501 1 page AD102 1 page AD103 1 page G-001 1 page G-002 1 page PD102 1 page Project. 3 pages (specifications) Register 39 pages (submittals)

RTA Reno to Bldg 1001 dated 12/ MARCH 2020 145 pages

The Following Solicitation Wil have the following Atachments:

Technical Specifications Renovation to Bldg 11 1 Oct 2019 1,142 pages

Drawings Revisions

A-100 1 Page A-111 1 Page A-112 1 Page A-113 1 Page A-114 1 Page A-115 1 Page A-116 1 Page A-201 1 Page A-202 1 Page A-203 1 Page A-310 1 Page A-311 1 Page A-321 1 Page A-403 1 Page A-501 1 Page AD100 1 Page

Spec Revision

02 42 91 5 Pages 07 54 19 13 Pages 10 81 00 6 Pages Spec Table of Contant 3 Pages

(End of Summary of Changes)