08 51 00.pdf

PDF 18 KB Posted

Attached to
DLA Warehouse 11 Renovation Federal contract opportunity
Solicitation number
W9123620B0017
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document package includes an invitation for bid (IFB) for renovations to Building 11 at a Department of Defense Logistics Agency (DLA) warehouse and the corresponding technical specifications.

The IFB solicits bids for renovations that include removal and reinstallation of existing windows in the building's clerestory area and repairs to glazed openings on the ground floor. Electronic bid submissions are due by the date specified in the IFB, with no phone inquiries accepted. The technical specifications provide details on the required materials and execution of the window renovations. Key aspects include removing existing clerestory windows while keeping frames undamaged, refinishing frames, installing new glass, and reinstalling windows. The specifications also outline repairing ground floor openings, installing flashing and weatherstripping, and making all glazed areas weather tight. The Army Corps of Engineers district in Norfolk is the contracting agency overseeing the project.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Warehouse 11 Renovation, newest first.
File Type Posted
Warehouse 11 KO Signed Page 1.pdf PDF
Warehouse 11 page 3.pdf PDF
ProjNet Responses Amend 7.pdf PDF
20-B-0017 Amendment 6.pdf PDF
A-502.pdf PDF
AD102.pdf PDF
23 52 43.00 20.pdf PDF
A-501.pdf PDF
G-001.pdf PDF
AD103.pdf PDF
PD102.pdf PDF
A-133.pdf PDF
09 29 00.pdf PDF
A-134.pdf PDF
A-136.pdf PDF
01 33 29.pdf PDF
01 11 00.05 50.pdf PDF
A-321.pdf PDF
A-311.pdf PDF
01 32 01.00 10.pdf PDF
07 54 19.pdf PDF
A-135.pdf PDF
A-101.pdf PDF
05 12 00.pdf PDF
A-310.pdf PDF
_RTA_Reno_to_Bldg_11_DDRV_Full_Plan_Set_thru_Amendment02.pdf PDF
20-B-0017 Amendment 4.pdf PDF
A.01.13 Specs Table of Contents.pdf PDF
A.01.13 A-321.pdf PDF
A.01.13 AD100.pdf PDF
A.01.13 A-100.pdf PDF
A.01.13 07 54 19.pdf PDF
A.01.13 A-403.pdf PDF
A.01.13 10 81 00.pdf PDF
A.01.13 A-113.pdf PDF
A.01.13 A-501.pdf PDF
A.01.13 A-111.pdf PDF
A.01.13 A-112.pdf PDF
A.01.13 A-310.pdf PDF
A.01.13 A-202.pdf PDF
A.01.13 A-114.pdf PDF
A.01.13 A-311.pdf PDF
A.01.13 A-115.pdf PDF
A.01.13 02 42 91.pdf PDF
WH 11 Site Visit.pdf PDF
20-B-0017 Amendment 2.pdf PDF
_RTA_Reno_to_Bldg_11_DDRV_Full_Plan_Set.pdf PDF
_P_2015_01503_003_specs_RTA.pdf PDF
20-B-0017 Amend 1.pdf PDF
A.01.13 WH11 Final Drawings.pdf PDF
Show all 50

DLA Warehouse 11 Renovation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovations to Building 11 DDRV Solicitation No.: W91236-20-B-0017 DSCR Richmond, Virginia

SECTION TABLE OF CONTENTS

DIVISION 08 - OPENINGS

SECTION 08 51 00

METAL WINDOWS

05/20

PART 1 GENERAL

1.1 WORK INCLUDED

1.2 REFERENCES

1.3 SUBMITTALS

1.4 STORAGE

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 SELF ADHERING AIR BARRIER

2.1.2 Screws and Bolts

2.2 ACCESSORIES

2.2.1 Anchors

2.2.2 Fasteners

2.2.3 Metal Sub-frames and Stools

PART 3 EXECUTION

3.1 EXAMINATION

3.2 REMOVAL AND RE-FINISHING CLERESTORY WINDOWS

3.3 WINDOW OPENING PREPARATION

3.4 CLERESTORY WINDOW RE-INSTALLATION

3.5 REPAIR OF GROUND FLOOR GLAZED OPENINGS

3.6 ANCHORS AND FASTENINGS

3.7 WEATHERSTRIPPING

3.8 ADJUSTMENTS AFTER INSTALLATION

3.9 CLEANING

-- End of Section Table of Contents --

SECTION 08 51 00 Page 1

FOR CONSTRUCTION

Amendment 2

SECTION 08 51 00

METAL WINDOWS

05/20

PART 1 GENERAL

1.1 WORK INCLUDED

Work of this section includes removal and re-installation of existing windows in building clerestory area and repair of glazed openings on ground floor level of the building.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B18.6.3 (2013; R 2017) Machine Screws, Tapping Screws, and Machine Drive Screws (Inch Series)

ASTM INTERNATIONAL (ASTM)

ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Schedule Of Work ; G

SD-03 Product Data

Fasteners ; G

Window photo; G

Self Adhering Air Barrier ; G

SECTION 08 51 00 Page 2

1.4 STORAGE

Store removed windows and components on edge, out of contact with the ground, under weathertight covering, and arranged to avoid bending, warping, or other damage.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 SELF ADHERING AIR BARRIER

Provide minimum 0.040 inch thick self-adhering, vapor permeable, air barrier membrane consisting of a cross-laminated high density polyethylene (HDPE) film, fully coated with rubberized asphalt adhesive. Provide membrane in rolls of various widths interleaved with disposable silicone release paper. Self-adhering air barrier must exhibit no visible water leakage when tested in accordance with ASTM E331 and must perform as a liquid water drainage plane flashed to discharge to the exterior any incidental condensation or water penetration. Use regular or low temperature formulation depending on site conditions, within temperature ranges specified by manufacturer.

2.1.2 Screws and Bolts

ASME B18.6.3 as applicable.

2.2 ACCESSORIES

Provide windows with hardware, clips, anchors, glazing beads, and fastenings, necessary for complete installation.

2.2.1 Anchors

Use hot-dip galvanized steel anchors. Secure anchors and fastenings to heads, jambs, and sills of openings, and fasten securely to windows or frames. Use anchors recommended by window manufacturer for specific type of construction and conceal. Anchor each frame at jambs with minimum of three adjustable steel anchors.

2.2.2 Fasteners

Stainless steel or aluminum materials as required to match frame material. Prime exposed heads of coated or plated fasteners and finish to match adjacent material.

2.2.3 Metal Sub-frames and Stools

If required to match original windows, provide standard type designed to suit the particular window. Match exposed surfaces to windows.

PART 3 EXECUTION

3.1 EXAMINATION

Examine all windows, glazed entrances, and other glazed openings for condition of frames and existing glass. Document examination and prepare schedule of work required for each framed window and glazed entrance unit. Include itemized list of defects that preclude weathertight

SECTION 08 51 00 Page 3 conditions.

Submit digital photgraphs of each type window with location referenced to the schedule.

3.2 REMOVAL AND RE-FINISHING CLERESTORY WINDOWS

Remove existing clerestory window units by extracting existing fasteners such that the frames remain undamaged and reusable. Remove all traces of existing sealant and caulking from window frame components. Clean and remove oil residue, mold, mildew, and other stains from the frame components.

Remove existing glass and prepare and paint frames as specified in Section 09 90 00 PAINTS AND COATINGS; color to match existing color.

Install new clear tempered glass into frames prior to re-installation or after frames are re-installed at contractors option.

3.3 WINDOW OPENING PREPARATION

Strip and remove existing caulking, sealant, and flashing down to the existing building jamb, head and sill framing. Install self-adhering air-barrier material to all perimeter surfaces. Install metal flashing at heads, jambs, and sills of same metal as used for original installation and of same configuration.

3.4 CLERESTORY WINDOW RE-INSTALLATION

Install re-finished window units without forcing into prepared window openings. Install windows in same location and orientation as they were previously. Set at proper elevation, location, and reveal; plumb, square, level, and in alignment. Brace and stay to prevent distortion and misalignment. Bed screws or bolts in sill members, joints at mullions, contacts of windows with sills, built-in fins, and subframes in mastic sealant. Install and seal windows in a manner that will prevent entrance of water and wind.

Any materials that show visual evidence of biological growth due to the presence of moisture must not be installed on the building project.

3.5 REPAIR OF GROUND FLOOR GLAZED OPENINGS

Clean and remove oil residue, mold, mildew, and other stains from the metal frame components. Remove all broken or cracked glass and replace with clear tempered glass as specified in Section 08 80 00 GLAZING. Use new glazing materials for new glass. Replace exterior sealant and interiou caulking as required to make glazed openings weathertight.

3.6 ANCHORS AND FASTENINGS

Make provision for securing units to each other and to adjoining construction. Build in new anchors and fastenings to jambs of openings and fasten securely to windows or frames and to adjoining construction.

Space new anchors not more than 16 inches apart on jambs and sills, and install a minimum of three anchors on each side of each opening. Anchors and fastenings must have sufficient strength to hold member firmly in position. Where type, size, or spacing of anchors is not shown or specified, use expansion or toggle bolts or screws as best suited to construction material. Provide expansion shield and bolt assemblies of

SECTION 08 51 00 Page 4 type designed to give holding power beyond tensile and shearing strength of bolt. Minimum fastener penetration must be not less than that recommended by manufacturer for type fastener and wall material involved.

3.7 WEATHERSTRIPPING

As required to match original installation, provide bronze, spring-brass, or stainless steel and secure with non-ferrous screws. Secure weatherstripping or rubbing-blocks to parting-strip and each end of meeting-rails. For solid bar stock windows, use weatherstripping inserted into groove.

Install new sealant to exterior perimeter of window units and apply new caulking to interior perimeter as specified in Sectin 07 92 00 JOINT

SEALANTS.

3.8 ADJUSTMENTS AFTER INSTALLATION

After installation of windows and completion of glazing and field painting, adjust units as required to provide weathertight sealing.

Lubricate hardware and operating parts. Verify units are properly installed, connected, and adjusted.

3.9 CLEANING

Clean interior and exterior surfaces of window units of paint spattering spots, and other foreign matter to present a neat appearance. Clean and touch up abraded surfaces.

-- End of Section --