This document outlines requirements for a federal contract to provide emergency power services. The U.S. Army Corps of Engineers seeks contractors to install, fuel, operate, maintain and repair government-provided diesel generators ranging from 5KW to 3MW at critical facilities following natural or man-made disasters. Critical facilities include hospitals, water infrastructure, shelters and other lifesaving or life-sustaining sites. Contractors must be able to deploy resources within 21-24 hours of a task order. The contract consists of four geographic regions with values up to $75-110 million. Awards will be made using a best value tradeoff method. Offerors must submit technical and price proposals by 30 days after a March 5th anticipated solicitation date. The System for Award Management database must be utilized for registration purposes.
Template Table A3-1 - Production Rates
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Production Rates Template
| Major Activity | PERSONNEL | EQUIPMENT | |||||||||||||
| Required Personnel | |||||||||||||||
| (Line Item) | DAY SHIFT | NIGHT SHIFT | Required Equipment | ||||||||||||
| (Line Item) | DAY SHIFT | NIGHT SHIFT | |||||||||||||
| Deployment Package | Deployment Package | Deployment Package | Deployment Package | ||||||||||||
| Type II Quantity | Type III Quantity | Type IV Quantity | Type II Quantity | Type III Quantity | Type IV Quantity | Type II Quantity | Type III Quantity | Type IV Quantity | Type II Quantity | Type III Quantity | Type IV Quantity | ||||
| Insert Labor Description and Line Item. Ensure any labor on the rate schedule required to perform the activity is listed. Add rows as needed to identify labor required for each activity. | Insert Average Rate/12-hour Shift/Lxx. Rates shall be in whole numbers. For example, if each MHE operator can offload 5 generators per 12-hours shift, the rate is 5. | Insert Labor Description and Line Item. Ensure any labor on the rate schedule required to perform the activity is listed. Add rows as needed to identify equipment required for each activity. | Insert Average Rate/12-hour Shift/Exx. Rates shall be in whole numbers. For example, if each forklift can offload 5 generators per 12-hours shift, the rate is 5. | ||||||||||||
| Avg Rate/12-hr Shift/Lxx | Avg Rate/12-hr Shift/Lxx | Avg Rate/12-hr Shift/Lxx | Avg Rate/12-hr Shift/Lxx | Avg Rate/12-hr Shift/Lxx | Avg Rate/12-hr Shift/Lxx | Avg Rate/12-hr Shift/Exx | Avg Rate/12-hr Shift/Exx | Avg Rate/12-hr Shift/Exx | Avg Rate/12-hr Shift/Exx | Avg Rate/12-hr Shift/Exx | Avg Rate/12-hr Shift/Exx | ||||
| Unloading Generators | i.e., MHE Operator (Lxx) | i.e., Forklift (Exx) |
Inventorying BOM Kits i.e., Electrical Foreman i.e. None
| Prepping Generators | i.e., Electrical Team Lead (Lxx) | i.e., Fuel Caddie (Exx) | ||
| i.e., Electrical Helper (Lxx) | ||||
| Installing Generators | ||||
| (includes haul, initial fuel and SCR) | i.e., Electrical Team Lead (Lxx) | i.e., Electrical Team Truck (Exx) | ||
| i.e., Hauling Driver (Lxx) | i.e. Hauling Truck (Exx) | |||
| i.e., Fuel Truck (Exx) |
Fueling Generators
Preventative Maintenance of Generators
Routine Servicing of Generators
Repairing Generators
De-installing Generators (includes SCR, de-fuel and haul)
Assessing Power Needs at Critical Facilities
TEMPLATE TABLE A3-1
**RED TEXT PROVIDES DIRECTION TO THE OFFEROR**
**GREEN TEXT IS INTENDED TO BE REPLACED BY THE OFFEROR**