Attachment_5_-_PreInstallation_Work_Order_Updated_05_Feb_2018.pdf

PDF 195 KB Posted

Attached to
Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP) Federal contract opportunity
Solicitation number
W911WN-18-R-3005
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

This document includes a pre-installation inspection form and related federal contract opportunity notice. The pre-installation inspection form collects facility and power load information to assess emergency power needs. It also documents existing on-site generator details.

The related federal contract opportunity is a requirements contract for Advanced Contract Initiative temporary emergency power support services across four geographical quadrants. The U.S. Army Corps of Engineers seeks contractors to assess power requirements, install, fuel, operate, maintain and repair government-provided generators ranging from 5KW to 3MW at critical facilities from 21-24 hours after a task order. Services are needed in response to natural and man-made disasters. The contract type is firm-fixed price with some reimbursable items over a five year period. Proposals are due 30 days after the anticipated March 5, 2018 solicitation date. Evaluation will use a best value tradeoff method considering technical and price factors.

Attachment 5 - Pre-Installation Work Order

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP), newest first.
File Type Posted
Amendment_5.pdf PDF
Revised_Attachment_1_-_Rate_Schedule_Updated_09_May_2018.xlsx XLSX spreadsheet
Revised_Attachment_8_-_Daily_Expenditure_Report_Updated_09_May_2018.xlsx XLSX spreadsheet
Amendment_4.pdf PDF
Revised_TEMPLATE_TABLE_A3-1_Production_Rates_-_09_May_2018.xlsx XLSX spreadsheet
Conformed_Contract_-_10_May_2018.pdf PDF
Amendment_3.pdf PDF
Conformed_Contract_25_April_2018.pdf PDF
Revised_Attachment_15_-_Small_Biz_Participation_Proposal_Updated_03_April_2018.pdf PDF
Amendment_02.pdf PDF
Revised_Attachment_8_-_Daily_Expenditure_Report_Updated_05_Feb_2018.xlsx XLSX spreadsheet
Revised_Attachment_1_-_Rate_Schedule_Updated_04_April_2018.xlsx XLSX spreadsheet
Revised_TEMPLATE_TABLE_A3-1_Production_Rates.xlsx XLSX spreadsheet
W911WN-18-R-3005-0004.pdf PDF
Attachment_4_-_Generator_Maintenance_Profile_Updated_05_Feb_2018.pdf PDF
Attachment_2_-_BOM_Kit_Updated_05_Feb_2018.pdf PDF
Attachment_16_-_Utilization_of_Small_Biz_Collection_Sheet_Updated_13_Feb_2018.pdf PDF
Attachment_12_-_Wage_Determination_Rates_Updated_05_Feb_2018.pdf PDF
Attachment_3_-_Generator_Power_Packs_Updated_05_Feb_2018.pdf PDF
Attachment_13_-_Deployment_Package_Descriptions_Updated_05_Feb_2018.pdf PDF
TEMPLATE_TABLE_B3-2_Equip_Salient_Features_Template.xlsx XLSX spreadsheet
Attachment_15_-_Small_Biz_Participation_Proposal_Updated_26_Feb_2018.pdf PDF
Attachment_17_-_Generator_Inventories_Updated_21_Feb_2018.xlsx XLSX spreadsheet
Attachment_1_-_Rate_Schedule_Updated_05_Feb_2018.xlsx XLSX spreadsheet
Attachment_10_-_Emergency_Power_Deployment_Packages.pdf PDF
RFP_W911WN-18-R-3005.pdf PDF
Attachment_9_-_DER_Acceptance_Memo.pdf PDF
TEMPLATE_TABLE_B2-1_Asset_Location.xlsx XLSX spreadsheet
TEMPLATE_TABLE_A3-1_Production_Rates.xlsx XLSX spreadsheet
Attachment_7_-_Deinstallation_Work_Order_Updated_05_Feb_2018_.pdf PDF
Attachment_8_-_Daily_Expenditure_Report_Updated_05_Feb_2018_.xlsx XLSX spreadsheet
Attachment_6_-_Installation_Work_Order_Updated_05_Feb_2018.pdf PDF
TEMPLATE_TABLE_B3-1_Labor_Qual_Certs_Template.xlsx XLSX spreadsheet
Attachment_14_-_Past_Performance_Questionaire_Updated_05_Feb_2018.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Installation Inspection US Army Corps of Engineers

Emergency Power

Power Tasking: ___________ Date/Time Generated: ___________

Facility Information

PII - Assessor Information

PII - Facility Power Information

Load Cable Information

Ground Cable Information

1. Mission Number:

2. Facility and building use:

3. Address:

4. City:

5. State: 6. County:

7a. Latitude: 7b. Longitude:

8. Facility Amerage(amp): 9. Facility Power(kw):

10. Facility Voltage(v): 11. Facility Phase:

12. Facility POC:

13. Office Phone: 14. Cell Phone:

15. Fax: 16. Email:

17. Assessor Name:

18. Assessor Qualification:

19. Assessor State Qualification:

20. Assessor Qualification Date:

21. Assessment Completed Date/Time:

22. Calculated Load: 23. Voltage:

24. Output Phase: 25. Configuration:

26. Amperage (amp):

27. Cable Size: 28. Cable runs per phase:

29. Neutral Runs: 30. Neutral Runs:

31. Cable-Distance to Connection:

32. Ground Cable Size: 33. Ground Cable Runs:

34. Bare Copper Length: 35. Total Ground Rods:

Attachment 5

Pre-Installation Inspection US Army Corps of Engineers

Emergency Power

On-Site Generator

Critical Load Data

PII - On-site Generator

Remarks

Assigned Date

36. Does this facility have an existing on-site backup generator?

37. Can an alternate generator be connected via that hookup?

38a. Latitude: 38b. Longitude :

39. Output Phase: 40. Configuration:

41. Calculated Load: 42. Voltage:

43. Amperage (amp):

44a. Latitude: 44b. Longitude :

45. Output Phase: 46. Configuration:

47. Calculated Load: 48. Voltage:

49. Fuel Type: 50. Fuel Capacity:

51. Amperage (amp): 52. Meter Reading (hrs):

53. Generator Remarks:

54. Directions/Remarks:

55. Tasking Received by Action Officer Date/Time:

56. Date/Time Tasking Received by Mission Manager:

57. Date/Time Tasking Passed to the 249th:

58. Inspection Team: