Attachment_1_-_Rate_Schedule_Updated_05_Feb_2018.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP) Federal contract opportunity
- Solicitation number
- W911WN-18-R-3005
About this file
This document provides details on a federal contract opportunity for temporary emergency power services. The U.S. Army Corps of Engineers will award four contracts for generator set support during natural and man-made disasters across four quadrants of the United States and its territories. Contractors will be responsible for assessing power needs, installing, fueling, operating, maintaining and repairing generators ranging from 5KW to 3MW at critical public facilities for up to five years. The anticipated solicitation date is March 5, 2018 with proposals due 30 days thereafter. Contractors may bid on any or all quadrants, with values not to exceed $75 million for the first three quadrants and $110 million for the fourth quadrant covering Puerto Rico and the U.S. Virgin Islands. Selection will be based on best value using technical and price proposals.
Attachment 1 - Rate Schedule
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rate Schedule
| **The tables below are samples and are to be tailored to each contractor's specific proposal.** | |||||||||||
| Contract Regions: | |||||||||||
| Rate Schedule | Base Year | 1st Option Year | 2nd Option Year | 3rd Option Year | 4th Option Year | ||||||
| Line Item | Labor Rates | Regular | Standby | Regular | Standby | Regular | Standby | Regular | Standby | Regular | Standby |
| L01 | Operations Manager | ||||||||||
| L02 | Site Manager | ||||||||||
| L03 | Admin Support | ||||||||||
| L04 | Yard Superintendent | ||||||||||
| L05 | Fuel Manager | ||||||||||
| L06 | Quality Control Manager | ||||||||||
| L07 | Safety Officer | ||||||||||
| L08 | Equipment Operator | ||||||||||
| L09 | Mechanical Team Leader | ||||||||||
| L10 | Electrical Team Leader | ||||||||||
| L11 | Mechanic | ||||||||||
| L12 | Electrician | ||||||||||
| L13 | Laborer | ||||||||||
| L14 | Truck Driver | ||||||||||
| L15 | "contractor labor" | ||||||||||
| L16 | "contractor labor" | ||||||||||
| L17 | "contractor labor" | ||||||||||
| L18 | "contractor labor" | ||||||||||
| Lxx | "contractor labor" | ||||||||||
| Base Year | 1st Option Year | 2nd Option Year | 3rd Option Year | 4th Option Year | |||||||
| Rate (Day) | Rate (Day) | Rate (Day) | Rate (Day) | Rate (Day) | |||||||
| Line Item | Equipment Rates | Regular | Standby | Regular | Standby | Regular | Standby | Regular | Standby | Regular | Standby |
| E01 | Crane, Hyd, Self-Propelled (capacity) | ||||||||||
| E02 | Fork Lift, Rough Terrain,(capacity) | ||||||||||
| E03 | Lighting Sets, Trailer Mounted 1500 W | ||||||||||
| E04 | Truck, Pick-up, (capacity) | ||||||||||
| E05 | Truck, Highway,(capacity) | ||||||||||
| E06 | Truck, Semi Tractor | ||||||||||
| E07 | Truck Trailer, Flatbed, <= 15 ton | ||||||||||
| E08 | Truck Trailer, Flatbed, > 15 ton | ||||||||||
| E09 | Truck Trailer, Lowboy, <= 50 ton | ||||||||||
| E10 | Truck Trailer, Lowboy, > 50 ton | ||||||||||
| E11 | Truck Trailer, Fuel Tanker | ||||||||||
| E12 | Truck, Fuel, <1000 gal | ||||||||||
| E13 | Truck, Fuel, 1000 to 4,000 gal | ||||||||||
| E14 | Truck, Fuel, > 4000 gal | ||||||||||
| E15 | Tank, Fuel Storage | ||||||||||
| E16 | Fuel Caddy | ||||||||||
| E17 | Pump, Fuel, Portable (flow rate) | ||||||||||
| E18 | Pressure Washer, Low | ||||||||||
| E19 | Pressure Washer, High | ||||||||||
| E20 | Office Trailer | ||||||||||
| E21 | Trailer Euipment stoage | ||||||||||
| E22 | Conex Container Storage | ||||||||||
| E23 | Load Bank, < 500 kW | ||||||||||
| E24 | "contractor equipment" | ||||||||||
| Exx | "contractor equipment" |
| Base Year | 1st Option Year | 2nd Option Year | 3rd Option Year | 4th Option Year | ||
| Rate per Mile | Rate per Mile | Rate per Mile | Rate per Mile | Rate per Mile | ||
| Line Item | Mobilization/Demobilizaton | NTE 200 Miles | NTE 200 Miles | NTE 200 Miles | NTE 200 Miles | NTE 200 Miles |
| ME02 | Fork Lift, Rough Terrain,(capacity) | |||||
| ME03 | Lighting Sets, Trailer Mounted 1500 W | |||||
| ME15 | Tank, Fuel Storage | |||||
| ME16 | Fuel Caddy | |||||
| ME17 | Pump, Fuel, Portable | |||||
| ME18 | Pressure Washer, Low, < 5000 psi | |||||
| ME19 | Pressure Washer, High >= 5000 psi | |||||
| ME20 | Office Trailer | |||||
| ME21 | Trailer Euipment storage | |||||
| ME22 | Conex Container Storage | |||||
| ME23 | Load Bank, < 500 kW | |||||
| ME24 | "contractor equipment" | |||||
| MEXX | "contractor equipment" |
| Base Year | 1st Option Year | 2nd Option Year | 3rd Option Year | 4th Option Year | ||
| Rate per | Rate per | Rate per | Rate per | Rate per | ||
| Line Item | Parts for Servicing Generators | Service | Service | Service | Service | Service |
| P01 | 0 to 29 kW | |||||
| P02 | 30 to 59 kW | |||||
| P03 | 60 to 99 kW | |||||
| P04 | 100 to 199 kW | |||||
| P05 | 200 to 299 kW | |||||
| P06 | 300 to 399 kW | |||||
| P07 | 400 to 499 kW | |||||
| P08 | 500 to 699 kW | |||||
| P09 | 700 to 900 kW | |||||
| P10 | 901 kW to 1.9MW | |||||
| P11 | 2 - 3 MW | |||||
| Line Item | Reimbursable Items | |||||
| R1 | Diesel Fuel - Generators | |||||
| R2 | Fuel for Government Vehicles - Gas | |||||
| R3 | Fuel for Government Vehicles - Diesel | |||||
| R4 | Travel Costs | |||||
| R5 | Materials and Supplies | |||||
| R6 | Credit for Recycling BOM | |||||
| R7 | Other Negotiated Items |
ATTACHMENT 1 - Rate Schedule
File details come from the government source that posted it. Updated .