W911RQ-26-S-C001-AOI A008 Supplemental Labor Management 9 FEB.pdf
PDF 405 KB Posted
- Solicitation number
- W911RQ-26-S-C001
About this file
This is an Area of Interest (AoI) announcement issued by Army Contracting Command-Red River Army Depot (ACC-RRAD) for supplemental labor management solutions. Released on February 9, 2026, under CSO W911RQ-26-S-C001, the AoI seeks commercial solutions to consolidate fragmented labor contracts currently managed separately across four Army facilities: Red River Army Depot (RRAD), Sierra Army Depot (SIAD), Anniston Army Depot (ANAD), and Watervliet Arsenal (WVA). The Army's Organic Industrial Base (OIB) currently manages fluctuating surge labor demands through multiple individual contracts, and this consolidation effort aims to standardize labor practices, reduce administrative overhead, and improve cost-effectiveness.
The Government is seeking solutions that go beyond traditional staff augmentation services and must address minimum objectives including: centralized management of sourcing, onboarding, and administration across geographically dispersed facilities; workforce agility to rapidly source, vet, and deploy skilled personnel for equipment maintenance and repair; standardization of labor categories and skill requirements; streamlined process efficiency reducing administrative burden; real-time data and analytics capabilities for workforce visibility and forecasting; and talent sourcing and retention strategies for skilled trades in a competitive market. Interested parties must submit a written solution brief by 5:00 P.M. CDT on February 25, 2026, to usarmy.rrad.acc.mbx.cso@army.mil with the subject line "SOLUTION for Supplemental Labor AoI A008," conforming to requirements outlined in Section 3.2 of master CSO solicitation W911RQ-26-S-C001. Any selected company must be registered in the System for Award Management (SAM.gov) prior to award. Questions should be directed to CSO/AoI POC Jacob Horn at jacob.j.horn.civ@army.mil.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Agency: Army Office: Army Contracting Command-Red River Army Depot (ACC-RRAD) AoI Title: Solutions for Supplemental Labor Management CSO AoI Number: A008 AoI Release Date: 9 FEB 2026 Responses: See CSO W911RQ-26-S-C001 for Procedure Details
1. General Information
1.1 Introduction
This announcement is for a Supplemental Labor Management Area of Interest (AoI) under the ACC- RRAD Commercial Solutions Opening (CSO) W911RQ-26-S-C001 and IAW Section 1823 of the Fiscal Year 2026 (FY26) Modifications to Commercial Solutions Opening (CSO). Interested parties are highly encouraged to visit SAM.gov to review the ACC-RRAD CSO special posting in its entirety to obtain more information on the process for submission and evaluation of CSO AoI Responses. This CSO AoI seeks to solicit commercial solutions that meet the objectives detailed in Sections 1.2 and 1.3.
1.2 AoI Background
TACOM has directed Red River Army Depot (RRAD), Sierra Army Depot (SIAD), Anniston Army Depot (ANAD), and Watervliet Arsenal (WVA) to address fluctuating (aka surge) labor demands across the Army's Organic Industrial Base (OIB). Currently, this is managed through multiple, fragmented contracts for labor at individual depots and arsenals. The Army seeks to consolidate these requirements to standardize labor practices, reduce administrative overhead and duplication, and improve overall efficiency and cost-effectiveness. This AoI is seeking commercial solutions that can provide a centralized, efficient, and agile approach to managing this supplemental workforce.
1.3 Desired Capabilities & Areas of Interest
ACC-RRAD is interested in a commercial solution for the management and fulfillment of supplemental labor requirements that will improve upon the current fragmented process. The Government is seeking solutions beyond traditional staff augmentation services. At a minimum, the proposed solution should address the following objectives IAW Appendix 01 (PWS) of this AOI:
• Centralized Management: A solution to manage the sourcing, onboarding, and administration of supplemental labor across multiple geographically dispersed OIB facilities.
• Workforce Agility: An ability to rapidly source, vet, and deploy skilled personnel to meet fluctuating surge labor demands equipment maintenance, repair, and related services.
• Standardization: A method to standardize labor categories, skill requirements, and performance metrics across different depots and arsenals.
• Process Efficiency: A streamlined solution that reduces administrative overhead for both the Government and the contractor. This may include new approaches to timekeeping, invoicing, and reporting.
• Data & Analytics: The ability to provide real-time visibility into the supplemental workforce, including skill inventories, personnel status, project allocation, and overall cost. The solution should provide data analytics to support better forecasting and decision-making.
• Talent Sourcing & Retention: Strategies for attracting and retaining skilled trades and technical personnel in a competitive labor market.
2. AoI Constraints Any selected company/companies will be required to be registered in the System for Award Management (SAM.gov) prior to award.
3. Submission Requirements A written solution brief must be sent via e-mail submission by 5:00 P.M. (CDT) on 25 Feb 2026, with the subject line stating SOLUTION for Supplemental Labor AoI A008 to usarmy.rrad.acc.mbx.cso@army.mil
Solution briefs must conform to the requirements outlined in Section 3.2 of the master CSO solicitation
W911RQ-26-S-C001.
Point of Contacts AoI questions can be sent to:
• CSO/AoI POC: Jacob Horn, jacob.j.horn.civ@army.mil mailto:usarmy.rrad.acc.mbx.cso@army.mil
Performance Work Statement (PWS) Organic Industrial Base (OIB)
Supplemental Labor Task Order Contract
1. Scope: The contractor shall provide a supplemental labor workforce, a minimum of 500 full time equivalent employees, to support Department of Defense (DoD) Organic Industrial Base (OIB) operations and mission requirements at Red River Army Depot (RRAD), Anniston Army Depot (ANAD), Sierra Army Depot (SIAD), and Watervliet Arsenal (WVA). The contractor shall also be responsible for establishing off-site work centers at both CONUS and OCONUS locations, sometimes within thirty (30) days, to accomplish OIB mission requirements. The labor force shall consist of a variety of labor categories in support of combat/tactical vehicle and equipment production, facilities’ maintenance, warehousing, hazardous materials handling for disposal, and other Garrison or Mission related activities.
2. Acronyms and Definitions:
a. AAR: After Action Report
b. COR: Contracting Officer Representative
c. CONUS: Continental United States
d. OCONUS: Outside of Continental United States
e. CDRL: Contract Data Requirements List
f. CRC: CONUS Replacement Center
g. DFARS: Defense Federal Acquisition Regulation
h. FAR: Federal Acquisition Regulation
i. IAW: In Accordance With
j. KO: Contracting Officer (used interchangeably with PCO)
k. OIB: Organic Industrial Base
l. PCO: Procurement Contracting Officer
m. PIEE: Procurement Integrated Enterprise Environment
n. POP: Period of performance
o. SPM: Surveillance and Performance Monitoring
p. SoWM: Start of Work Meeting
q. RRAD: Red River Army Depot
r. ANAD: Anniston Army Depot
s. SIAD: Sierra Army Depot
t. USG: United States Government
u. WVA: Watervliet Arsenal
v. Non-production time: Time periods within work hours where employees are not actively engaged in tasks that directly contribute to their core job responsibilities or the organization's goals.
3. Applicable Documents:
a. Federal Acquisition Regulation (FAR) 52.222-41 Service Contract Act (SCA) of 1965
b. FAR 52.222-6 Davis Bacon Act (DBA)
c. Army Regulation (AR) 25-2
d. Title18 USC 499
e. Title18 USC 701
f. Department of Defense Instruction 2000.16, DoD Anti-Terrorism Standards
g. AR 530-1
h. Occupational Safety and Health Administration (OSHA) 1910.132 I. OSHA standard “269”
j. 18 U.S.C. 1382
k. FAR 52.245-1 (h)(1)
l. AR 600-55
m. FAR 52.245-1
n. Optional Form (OF) 346
o. FAR 52.217.8
p. FAR 52.217.9
q. AR 380-67
r. DoD 5200.2-R
s. Homeland Security Presidential Directive (HSPD) 12
t. American Standard Test Method (ASTM) F1506
u. FAR 52.222-17
3.1 Red River Army Depot (RRAD) Applicable Documents
a. RRAD ISO 9001:2015 Quality Management System (QMS)
b. RRAD Regulation 385-1, RRAD Safety Manual
c. RRAD’s Drug Free Workplace Policy 60 (Drug Use)
d. RRAD’s Smoke Free Workplace Policy 09 (Tobacco Use)
3.2 Sierra Army Depot (SAID) Applicable Documents
a. SIAD ISO 9001:2015 Quality Management System (QMS)
b. SIAD Regulation 385-1, SIAD Safety Manual
3.3 Anniston Army Depot (ANAD) Applicable Documents
a. ANAD QM-01, Anniston Army Depot Quality Manual
b. ANAD Regulation 385-20, Contractor Safety and Occupational Health Program
4. General Requirements:
4.1 Period of Performance (POP):
4.1.1 The Base period of performance (POP) of this task order may be up to twelve
(12) months, which may, at the Government’s sole discretion, be extended for up to an additional forty-eight (48) months, in the form of four (4) twelve (12) month option periods (52.217-9 Option). Please note, some POPs and option periods may be shorter.
4.1.2 The Procuring Contracting Officer (PCO) may elect to exercise the options (wholly or in part at any time prior to the end of the base period or during either option period. Labor rates specified for each site in this task order remain in effect until the expiration of the previous option and billed according to each site’s Price Evaluation Sheet, Attachment 0002.
4.2 Place Of Performance:
4.2.1 Red River Army Depot (RRAD): Contractor services in support of this task order will be performed primarily at RRAD in Bowie County, Texas. Work not performed by the contractor at RRAD will be performed while on temporary duty
(TDY).
4.2.2 Sierra Army Depot (SAID): Contractor services in support of this task order will be performed at Sierra Army Depot in Herlong, California. Contractor personnel shall be physically located at SIAD, and the Government will provide workspace for the onsite work activity there. The contractor personnel performing services at SIAD shall utilize the same facilities and equipment used by the SIAD civilian workforce.
4.2.3 Anniston Army Depot (ANAD): Contractor services in support of this task order will be performed at Anniston Army Depot in Anniston, Alabama. Contractor personnel shall be physically located at ANAD, and the Government will provide workspace for the onsite work activity there. The contractor personnel performing services at ANAD shall utilize the same facilities and equipment used by the ANAD civilian workforce.
4.2.4 Watervliet Arsenal (WVA): Contractor services in support of this task order will be performed at Watervliet Arsenal in Watervliet New York. Contractor personnel shall be physically located at WVA.
4.2.5 Off-Site Locations: Offsite locations may be established as dictated by mission requirements. These locations may be situated within the Continental United States (CONUS) or Outside the Continental United States (OCONUS). Upon identification of the need for an offsite location, establishment shall commence within thirty (30) calendar days to support OIB mission accomplishment.
4.3 Start of Work Meeting (SoWM): The contractor shall host a SoWM meeting and shall coordinate with the Contracting Officer at least seven calendar days prior to scheduling the meeting. The Government will provide a location at each site to conduct the meeting. The contractor shall prepare and submit written minutes identifying meeting attendees and summarizing the points discussed at the meeting In Accordance With (IAW) Contract Data Requirements List (CDRL) Attachment 0013, (CDRL A001).
4.4 Phase-in Period Plan and Accountability/ Ramp up and Property Accountability:
4.4.1 The contractor shall provide a detailed description at the SoWM, in section 4.3, of the procedures it will employ during the Phase-In period (meaning the initial 30 calendar days after task-order award) to meet full mission and operational capability. These procedures shall describe the steps the contractor will take and the processes it will use in order to be prepared to assume complete responsibility for the performance of the services at each site at the end of the Phase-In period. These procedures shall include a detailed milestone chart and narrative describing the chronological sequence of events that will be accomplished during phase-in.
4.4.2 The 30-calendar day phase-in period shall run concurrently with the last 30 calendar days of the predecessor task order period of performance. During the phase-in period the contractor will be provided with a certified list of the names of the service employees working under the existing task order for the purposes of offering employment as required by FAR 52.222
4.4.3 Government property will be transferred from the Government to the new contractor and shall be managed by the contractor IAW FAR 52.245-1 unless otherwise specified in this task order. Where there is a conflict between FAR 52.245-1 and this task order, the task order will take precedence. The contractor shall be liable for loss, theft, damage or destruction of Government property furnished or acquired under the task order.
4.4.4 GFP shall be issued to contractor employees by means of a hand receipt. The contractor shall ensure that contractor personnel are responsible for the proper care, use, safeguarding, accountability and routine inspection of GFP. The contractor shall ensure the safety and operability of all equipment and notify the Government when necessary maintenance is beyond operator level.
4.4.5 Contractor personnel shall be required to sign a tool room receipt or Government hand receipt for site property items to ensure accountability IAW AR 735-5 and refer to sections applicable to each location for specific site guidelines. The contractor shall be fully liable for the reimbursement to the Government for all tool/property loss, theft, destruction or damage. If there is a loss, theft, destruction or damage of GFP/GFE by the contractor employee, a Property Loss/Financial Liability or other appropriate investigation will be conducted by the Government. The Government official responsible for investigating lost, theft, damage or destruction of Government property is the Property Loss Specialist/Financial Liability Investigation Coordinator. The PCO will inform the contractor of the location of the Property Loss Specialist/Financial Liability Investigation Coordinator. A Financial Liability Investigation of Property Loss (FLIPL) or other appropriate investigation shall be initiated by the Government. If The contractor is determined to be pecuniary liable based on the findings, review by the Site Legal Office, and concurrence of Site Deputy Commander, the contractor shall be responsible to make reimbursement to the Government made payable to U.S. Treasury. The contractor shall be provided written notification by the PCO concerning disposition of the investigation. It is the contractor's responsibility to seek financial recovery from their employees and sub-contractors not the Government. The contractor must reimburse the Government within 45 calendar days of PCOs notification of disposition of the investigation.
4.4.6 When a contractor employee ceases employment at the site the contractor shall furnish a written notification to the COR and Property Loss Specialist/Financial Liability Investigation Coordinator within 7 business days.
4.4.7 Upon termination or completion of this task order, all material, tools and equipment issued to the contractor for performance of the task order shall be returned to the Government, and any material, tools, and equipment purchased by the contractor for performance of this task order shall become the property of the Government. A final inventory of property acquired by the contractor to accomplish tasks under this task order shall be provided to the COR within 30 calendar days of either task order completion or receipt of a notice of termination of the task order. After review of the inventory, the Government will provide disposition instructions to the contractor.
4.4.8 When an employee leaves the employer of the prime or subcontractor or is terminated, the contractor shall conduct an inventory of any Government Property assigned to that employee before the employee leaves the site grounds.
The inventory shall be recorded and any unaccounted-for Government Property listed and provided to the COR prior to the end of the workday.
4.4.9 The contractor is responsible for any loss of Government Property caused by a failure to return any issued Government Property or for any damage caused by other than normal wear and tear of the equipment. The contractor will reimburse the Government within 15 calendar days of the loss of Government Property under these circumstances. This provision supersedes FAR 52.245-1 (h) (1). The contractor is liable for the loss of Government property under these circumstances.
4.5 Phase-Out: Before the completion of this Task Order (to include option periods), an observation period may occur, at which time management personnel of the incoming workforce may observe operations and performance methods of the incumbent contractor. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of service. The contractor shall not defer any requirements for the purpose of avoiding responsibility or of transferring such responsibility to the succeeding contractor. The contractor shall fully cooperate with the succeeding contractor and the Government so as not to interfere with their work or duties.
Irrespective of this section, the Government reserves the right to observe contractor personnel for time management purposes at any point during the period of performance of this task order.
4.6 Recognized Holidays:
4.6.1 Contractor personnel shall not perform services under this task order on standard
Federal holidays without prior written approval from the PCO. If the holiday to be worked represents overtime, the overtime approval process applies.
4.6.2 The following are the standard Federal holidays:
a. New Years Day
b. Martin Luther King Jr. Birthday
c. Presidents Day
d. Memorial Day
e. June-teenth Day
f. Independence Day
g. Labor Day
h. Columbus Day
i. Veterans Day
j. Thanksgiving Day
k. Christmas Day
l. Any other specific day recognized by Office of Personal Management (OPM)
4.7 Hours of Operations:
4.7.1 Each site’s work schedule and shift assignments may change to accommodate workload fluctuations but shall mirror the government work schedule. The contractor’s personnel performing services at each site shall be capable of working any day of the week. The COR will provide written notice to the contractor's Site Supervisor no less than 48 hours in advance on all changes to the shift’s schedules and workload mix. This can include adding or deleting shifts;
changes to the shift days/times and an increase or decrease in hours; and changes to the required mission workload. The Site Supervisor shall be responsible for adjusting contractor employees’ schedules as necessary to meet changes in workload and shall submit a revised staffing plan within 48 hours of notice. All modifications to work schedules and shift assignments require COR/PCO approval. All contractor employees shall perform assigned duties during established hours listed in paragraph 4.7.2 of this PWS, Any contractor request for changes to work schedules outside of standard hours requires prior approval from COR/PCO. **On occasion, the Government may require the contractor to adjust work schedules with less than 48 hours’ notice. In this scenario, the contractor shall provide a new staffing plan by close of business of the next duty day.**
4.7.2 Work Shift Schedule:
4.7.2.1 RRAD
a. Standard day shift: 0630-1700 (Monday - Thursday)
b. Standard night shift: 1630-0300 (Monday - Thursday)
c. Alternate night shift: 1700-0330, 1730-0400, 2000-0630 (Monday -
Thursday)
4.7.2.2 SIAD
a. Standard day shift runs from 0630-1700 (Monday-Thursday)
b. Standard night shift runs from 1630-0300, (Monday-Thursday)
4.7.2.3 ANAD
a. Standard day shift: 0600-1530 (Monday-Thursday) 0600-1430 (Friday)
b. Standard day shift: 0700-1630 (Monday-Thursday) 0700-1530
c. Standard night shift: 2030-0600 (Monday-Thursday) 2130-0600
4.7.2.4 Watervliet Arsenal
a. Standard day shift 0630-1600 (Monday-Thursday) and 0630-1500 every-other Friday.
4.7.3 Non-productive time: The contractor shall not bill the Government for non-productive time; situations include but are not limited to: meals, company meetings, union activities, random drug screening, and any other activities not specifically required by this task order are considered nonproductive time.
4.7.4 Rest Periods: Rest periods granted as the result of a safety issue identified by the site-specific Safety Directorate, commonly for heat and humidity conditions are considered productive time under this contract and may be directly billed.
There will be two 15 (fifteen) minute rest periods: first rest period – taken between the start of the shift and prior to the meal break; second rest period -taken between the end of the meal break and the end of shift. Both rest periods shall be taken at the same time as scheduled for Government employees in the areas the contractor employees are assigned to. Both rest periods are considered productive time and may be directly invoiced.
4.7.5 Administrative Leave: Contract employees are not allowed periods of
Administrative Leave that are granted to Government employees by local Commanders for attendance at various Government functions, i.e. early holiday dismissals.
4.8 Government Shutdown:
4.8.1 Unplanned shutdowns of Government operations at each site can be influenced by parts availability, administrative shutdowns from higher command, and local administrative shutdowns of a short duration, acts of God, other emergencies, or other reasons. There may be extended periods with no mission and, therefore, the contractor is not assured of any level of work. The contractor shall not bill the Government for non-work or non-productive time due to these or similar events.
4.8.2 In the event the Government plans a shutdown at any of the sites for any reason, The contractor will also be required to observe these designated non-workdays when notified by the COR or PCO in advance. Such non-workdays shall not be billed to the Government. Priorities will be coordinated between the contractors Site Supervisor and the COR.
4.9 Shift differential rates: The Government will not pay shift differential premiums for labor performed under this task order. The contractor shall be responsible for complying with all wage and fringe benefits for its employees IAW FAR 52.222-41 -- Service Contract Labor Standards and any other applicable labor laws.
4.10 Overtime:
4.10.1 The Government shall pay the contractor overtime rates for labor utilized on an as needed basis (for approved locations). A detailed Weekly Overtime Report (CDRL A015) shall be submitted to the COR by close of business on the next duty day for any overtime worked.
4.10.2 IAW DFARS subpart 222.4, Labor Standards for Contracts Involving Construction, the contractor shall ensure that service calls or orders issued by the COR are annotated as repair or maintenance and work hours are properly documented. Work-hours which will require less than 32 work-hours to perform shall be considered to be maintenance subject to the Service Contract Act.
4.10.3 Advance written permission from the PCO shall be obtained to utilize overtime rates for each payroll period. The PCO will provide authorization for any overtime usage 24 hours in advance of the requirement in conjunction with the 24-hour advance notice for the additional support up to a maximum of 5,000 hours per week for each site. The request for overtime support will be finalized between the site-specific COR and site-specific contractor representatives prior to the overtime being worked. The request may be modified by the COR, but only downward from the notification that was provided by the PCO in advance. The 5,000 hours per week for each site does not represent the limit of additional support the Government may direct, only the limit of additional support that may be billed using the contract overtime rates.
4.11 Security Requirements: Prior to start of work, all contractor personnel shall obtain the level of clearance as required in the DD Form 254. (See section 4.11.1 For WVA).
Additionally, IAW CDRL A011, all contractor personnel shall obtain a security clearance prior to start of work. A favorable security investigation shall be obtained prior to accessing the sites databases and Local Area Network IAW AR 25-2, AR 380-67, DoD 5200.2R, and Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12. If the contractor personnel are unable to gain and maintain a favorable security clearance, the contractor shall reassign those persons to a position that does not require security clearance for which they are qualified or take other personnel action as contractor personnel policies require. All information and data developed or obtained in performance of this task order belongs to and is the property of the U.S. Government and shall be classified and documented For Official Use Only (FOUO) The contractor shall not release any information or data without the express written approval of the PCO. Non-Use and Non-Disclosure Agreements, SF85 and DD 2875s, are required of all contractor personnel performing under this task order. All contractor employees will receive an initial Security briefing to familiarize them with any unique site requirements. All contractor personnel performing work under this task order shall:
(a) be U.S. citizens.
(b) be capable of reading, writing and speaking English.
(c) be required to submit a complete SF85 form to the COR. In addition, contractor personnel performing work under this task order that necessitates access to Government computer systems or networks qualify at each site for and obtain a Common Access Card (CAC) card to access the computer systems. To maintain system access, first line supervisors shall ensure that all contract employees are logging into the network at minimum once weekly. Additionally, such employees are required to submit completed SF85 and DD 2875 (CDRL A011) forms to the site Security Manager for approval so the Government can perform a background check before gaining access to the network.
(d) be required to provide a valid state driver’s license, vehicle registration and current insurance to obtain vehicle access for their privately owned vehicles (POVs); and
(e) be responsible for obtaining the necessary identification badges and (possibly) vehicle registration decals to gain access. The contractor must ensure:
(i) The identification badge issued to each employee is used only by that employee and is not loaned or given to anyone else. (The misuse of the Government identification badge, such as permitting others to use it, may result in criminal charges under Title18 USC 499 and 701, and the possible barring of the employee).
(ii) Each of its employees working at each site understands:
1. that the safeguarding of Government-furnished identification is the responsibility of each contractor employee and that contractor employees are responsible for paying the cost of reissuance of any lost badge, if appropriate (as determined by The Directorate of Emergency Services) and,
2. if requested by any site security personnel or the COR, they may be required to prepare and swear to an affidavit describing the circumstances of a lost badge, before a new badge is issued; and
3. Upon employment termination of contractor employees or upon task order expiration, all Government-furnished identification shall be turned in to The Directorate of Emergency Services on the date of employment termination or task-order expiration. Contractor personnel performing work at each site under this task order shall be cognizant of and comply with all security requirements related to Physical and Personnel Security, and Force Protection Measures. The Physical and Personnel Security, and the Force Protection Measures requirements, will be presented by The Directorate of Emergency Services personnel at SoWM.
4.11.1 The contractor shall hold the level of Facility Security Clearance (FCL) required in the DD Form 254 or higher. The FCL shall be active, and is required for the positions of Network Administrator, System Administrator, IT Specialist (LE Systems Admin), and IT Specialist (Industrial System Admin) under WVA.
4.11.2 CONTRACTOR INVESTIGATION/CLEARANCE: All contractors and consultants that access government owned or operated automated information systems, networks, or databases and to safeguard controlled unclassified information shall have a favorable background investigation as required above references positions designated as IT-I, IT-II or IT-III to perform functions stipulated in this PWS. The minimum investigative requirements are as follows: IT-I (Privileged Access) = Single Scope Background Investigation (SSBI); IT-II (Limited Privileged Access) = National Agency Check with Law and Credit Check (NACLC); IT-III (Non-Privileged Access) = National Agency Check with Inquiries (NACI). An investigation in-process is acceptable if the 7th Signal Command Designated Approval Authority (DAA) has granted an IT Waiver. Investigations will be coordinated with the Directorate of Risk Management, Force Protection applicable to location. Non-U.S. citizens shall be Permanent Resident Aliens with requisite investigation. All personnel shall receive and certify to an Information Systems Security Briefing.
(a) Contractor personnel performing Information Assurance/Technology workforce functions identified in DoD 8570.01M shall meet training and certification requirements for Information Assurance (IA) Support Personnel as specified by AR 25-2, Chapter 3-3, appropriate Army Best Business Practices (BBPs), DoD 8570.1 (M) and ALARACT 284/2011 (Computing Environment Certifications for the Army Information Assurance Workforce).
Contractor personnel that fail to meet and maintain those requirements outlined in AR 25-2, Training and Certification BBP and DoD 8570.01M will have their elevated permissions revoked and shall be removed from performing service from the task order.
(b) Contractor personnel supporting Information Assurance functions in Chapters 3, 4, 10, and 11 shall be appropriately certified prior to being engaged. The contracting officer will ensure that contractor personnel are appropriately certified and provide verification to the Defense Manpower Data Center (DMDC) database: https://www.dmdc.osd.mil/appj/dwp/index.jsp Additional training on local or system procedures may be provided by each location.
4.11.3 **OCONUS HIRING EXCEPTION**: Notwithstanding the foregoing, Contractor may be required to operate in locations outside the continental United States of America (OCONUS), in which Contractor may employ Other Country Nationals (OCNs) to perform work on this task order. Contractor may also enter into first tier and second-tier subcontractor agreements with foreign entities, and such entities may also employ OCNs to perform work on this task order.
4.11.4 Force Protection Conditions (FPCON): Impact on contractor performance during increased FPCON during periods of increased threat: During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher threat.
Services will resume when FPCON level is reduced to level Bravo or lower. The FPCON descriptions will be provided in the site-specific AT training. The COR will keep the contractors informed on the current FPCON or any possible FPCON change.
4.12 DoD Identification: Contractor personnel that are not in possession of a valid DoD
Identification Card, Transportation Worker Identification Credential (TWIC), or other acceptable federally issued ID Card shall appear in person at each site’s Visitor Control Center to have their identity confirmed and be vetted to determine their fitness for access to the installation. Background checks will be conducted via the National Crime Information Center (NCIC) at no expense to the contractor. Derogatory information discovered during a background investigation may result in denial of access to the installation or detention in the event of an outstanding warrant. 3.12 DoD Anti-Terrorism Standards: Pursuant to Department of Defense Instruction 2000.16, DoD Anti-Terrorism Standards, contractor personnel requiring access to a federally controlled facility shall take the Level 1 antiterrorism awareness training. This training is publicly available at https://atlevel1.dtic.mil/at. Each contract employee who needs access to a federally controlled facility must complete the training and receive a certificate of completion.
Completion certificates shall be forwarded to the COR.
4.13 OPSEC Training: IAW AR 530-1, the Government will give Operational Security (OPSEC) orientation training to contractor personnel who will be working at each site.
Such OPSEC training will be provided within the first 30 calendar days of their initial assignment to work at each site and annually thereafter to familiarize them with unique sites requirements. Completion certificates shall be forwarded to the COR.
4.14 Health, Safety and Environmental (HSE): The contractor shall develop and manage a comprehensive HSE Plan in order to comply with the following:
4.14.1 National Consensus Standards (NCS) shall apply to all workplaces. The rules and procedures set forth shall conform to the OSHA and American Conference of Governmental Industrial Hygienists (ACGIH) program policies, directives, organization responsibilities and reporting requirements contained in all of the applicable provisions of the Code of Federal Regulations (CFR) National Fire Protection Association (NFPA) codes. Local Safety Regulations and Safety Manuals, and any pertinent local Standing Operating Procedures (SOPs), or Letter of Instructions (LOIs) that pertain to the operations being performed are available in each site’s Safety Office. Documents identified in this paragraph shall be made available to the contractor in electronic format upon request to the COR. The contractor shall cooperate with and participate in effectively implementing and maintaining the OSHA Voluntary Protection Program (VPP) for each site’s certification goal. Accidents that require medical attention shall be reported to the COR and PCO who will inform each site’s local Safety Office as appropriate. These are reportable on a Department of Army Form 285 (DA FORM 285) when they occur on U.S. Federal property. The contractor shall report safety data to each site’s local Safety Office upon request during the life of the task order. Contractor shall implement and maintain a consolidated Safety and Health Management System that includes Incident Reporting, Hazard Identification & Tracking, and Training.
4.14.2 The contractor is responsible for meeting any OSHA requirements for employees exposed to cadmium and other regulated exposures IAW depot abatement plans.
If there are no provisions notated in OSHA or American Conference of Governmental Industrial Hygienists (ACGIH), and no military standards exist the contractor will utilize other applicable standards. Testing/screening records shall be kept on file for the duration of this task order and shall be provided to COR upon request.
(a) National Institute for Occupational Safety and Health
(b) U.S. Department of Transportation
(c) Chemical/Substance Manufacture
(d) American Society of Heating, Refrigerating and Air Conditioning Engineering
(e) American National Standards Institute (ANSI) If there are multiple standards then the contractor will use the most stringent standard that applies. Specific areas include each site’s wash rack, blast bays, and the dust collectors associated with these areas.
4.14.3 At no expense to the USG, the contractor shall ensure all its employees (If IAW
Attachment 0009) assigned to perform work at each site, for this task order shall receive physical examinations and are medically fit, prior to reporting to each site for duty. Records of these physicals shall be kept on file for the duration of this task order.
4.14.4 Environmental Requirements: Hazardous waste generation by contractor personnel working at sites shall be handled, transported, stored, and/or treated in a manner consistent with local, state, and federal policies and procedures.
(a) RRAD: The contractor shall obtain the RRAD Regulation 385-1, RRAD
Safety Manual from the RRAD Safety Office located in Building 421 in addition to other safety requirements IAW paragraph 4.14.
(b) SAID: In the event of an accident or other incident involving hazardous materials (HAZMAT), contractor personnel shall take appropriate action to contain the problem immediately and notify SIAD Department of Emergency Services at 530-855-4345, in accordance with Local, State and Federal requirements
4.14.5 Any waste (hazardous or non-hazardous) generated shall be handled in a manner consistent with Local, State, and Federal policies and procedures. In the event of an accident or other incident involving HAZMAT or waste, contractor personnel shall take appropriate action to contain the problem immediately and notify proper authorities, according to local requirements. The reporting format will be identified at the start of work (SoWM) meeting. The local Environmental Division will provide all information relating to environmental processes and procedures. Prior to hiring environmental personnel, the contractor shall provide documentation of training certificates and licensee information (CDRL A021) required by federal and state regulations for persons working with and around hazardous waste and/or a member of the emergency spill response team at contractor’s expense. Additionally, the contractor shall ensure yearly refresher courses or new training is accomplished at the contractor’s expense. The contractor shall provide information regarding environmental team task accomplishments weekly to the Government to facilitate reporting requirements by the U.S. Army, state or federal environmental agencies.
4.14.6 Use of Hazardous Materials: Contractor shall assign all hazardous materials management responsibilities to the appointed Environmental Compliance Director (ECD). The contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. The contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored onsite during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list without prior written approval from DGR and/or COR.
4.14.7 Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of- Forces Agreement. The contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).
4.15 Drug Free Workplace:
4.15.1 All new personnel shall be drug tested at contractor expense prior to hiring.
Additionally, the contractor shall provide and maintain a random drug testing program at their expense to ensure a drug free workforce. The contractor will specify the method and time frame for the random drug tests and shall notify RRAD Supervision prior to removing an employee from the cost center. The time contract employees are performing drug testing shall be considered non-productive and shall not be invoiced.
4.15.2 The contractor shall - within 30 calendar days after the award:
(a) Publish a statement notifying its employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
(b) Establish an ongoing drug-free awareness program to inform such employees about
i. The dangers of drug abuse in the workplace.
ii. The contractor’s policy of maintaining a drug-free workplace.
iii. Any available drug counseling, rehabilitation, and employee assistance programs; and
iv. The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace.
(c) Provide all employees engaged in performance of the task order with a copy of the statement required by subparagraph (1) of this provision.
(d) Notify such employees in writing in the statement required by subparagraph
(1) of this provision that, as a condition of continued employment on this task order, the employee will –
i. Abide by the terms of the statement; and
ii. Notify the employer in writing of the employee’s conviction under a criminal drug statute for a violation occurring in the workplace no later than 5 calendar days after such conviction.
(e) Notify the PCO in writing within 10 calendar days after receiving notice under subdivision (4) (ii) of this clause, from an employee or otherwise receiving actual notice of such.
(f) Within 30 calendar days after receiving notice under subdivision (d)(ii) of this provision, of a conviction, take one of the following actions with respect to any employee who is convicted of a drug abuse violation occurring in the workplace:
i. Take appropriate personnel action against such employee, up to and including termination; or,
ii. Require such employee to satisfactorily participate in a drug abuse assistance or rehabilitation program approved for such purposes by a Federal, State, or local health, law enforcement, or other appropriate agency; and (7) Make a good faith effort to maintain a drug-free workplace through implementation of subparagraphs (1) though (6) of this clause.
4.15.3 Tobacco Use in the Workplace: The contractor will notify its employees upon reception of the award of the local sites Tobacco Workplace Policy. The PCO will notify the contractor of the sites Tobacco Workplace Policy.
4.16 Accident Reporting: The contractor shall report (within one hour by telephone or e-mail) to the Government supervisor of the area where the incident occurred and Contracting Officer’s Representative all available facts relating to each instance of damage to Government property/material or injury to contractor personnel.
4.16.1 If the Government elects to conduct an investigation of an accident, the contractor shall cooperate fully and assist the Government personnel until the investigation is completed.
4.17 Personal Protective Equipment (PPE):
4.17.1 The Government shall provide all standard PPE to perform assigned tasks, including, but not limited to, standard hearing protection (earplugs) and eye protection (impact resistant safety glasses). The Government shall also provide all specialized or non-standard PPE to contractor employees as required to perform their assigned jobs. All specialized, standard, and/or non-standard PPE provided by the Government-to-Government employees in the same or similar job class will be provided to Contractor employees.
4.17.2 The contractor shall, at its own expense, provide safety footwear, prescription safety glasses (when a prescription is required) and specialized hearing protection. IAW 29 CFR 1910.136, safety shoes must meet the requirements of ASTM F2412, Standard Test Methods for Foot Protection, and ASTM F2413, Standard Specification for Performance Requirements for Protective (Safety) Toe Cap Footwear. Safety shoes must be sturdy and have an impact-resistant toe.
Only shoes meeting or exceeding the ANSI Class 75 impact standard are approved.
4.17.3 The contractor shall enforce the use of both standard and nonstandard personal protective equipment (PPE) by its employees.
4.18 Staffing:
4.18.1 The contractor shall furnish supervision, including a Site Supervisor, who shall be available on site as the Point of Contact (POC) during each shift when contractor employees are present for duty. All contractor supervisors shall use their Government E-mail for official communication concerning contractual issues. All contractor supervision shall have a local phone number. The contractor shall ensure adequate skilled labor is available to meet production requirements and shall strategically station supervisors within the production locations to minimize travel time and ensure rapid response to incidents. The contractor shall not allow supervisory personnel to be a production line worker or a production line worker to be a supervisor. The Site Supervisor will have the authority to act on behalf of the contractor with respect to contractor operations, and they must be able to specify individual contractor employees by name, date of birth, location and contact phone number that are present for duty. The POC must be able to identify where on site each employee is working (which building or area).
4.18.2 Contract Manager: The contractor shall designate in writing a contract manager and an alternate to act on behalf of the contractor to the PCO. The contract manager or alternate shall be responsible for the performance of work provided by the contractor. The contract manager or alternate shall have full authority to act for the contractor on all contractual matters of daily operation of this task order. The contract manager’s salary shall be included in the overhead costs, and the contractor is prohibited from invoicing separately for this position.
4.18.3 Site Supervisor: The contractor shall designate in writing to the COR and PCO one site supervisor and an alternate (this shall be a First Line Supervisor as required in 4.19.4 below) to act on behalf of the contractor to the PCO, COR, and other site officials. A site supervisor or alternate shall be present at the site during assigned standard day shift IAW 4.7.2 when contractor personnel are performing work at the site, and will serve as the interface with on-site officials, as well as serving as a point of contact for the PCO. While on duty, the site supervisor or alternate is responsible for the performance of work provided by the contractor under this task order. All other shifts shall utilize a first line supervisor to act as site supervisor on behalf of the contractor while work is being performed. The site supervisor’s salary shall be included in the overhead costs, and the contractor is prohibited from invoicing separately for this position.
4.18.4 First line supervisor: With exception to WVA, the contractor shall maintain no less than two supervisory personnel. If the number of employees exceeds the exact group of 75, the contractor shall, upon PCO approval, add a first line supervisor (e.g. 151 employees would require three First Line Supervisors). First line supervisors shall be present during all assigned standard hours. Outside of assigned standard hours (ref 4.7.2), only one First Line Supervisor shall be required. First line supervisors shall attend one TIER 1/start of work meeting daily in a cost center which they supervise contract employees in. The contractor shall strategically place first line supervisors based on employee density (75 per supervisor) to alleviate travel time between cost centers enabling supervisors to respond faster when situations arise that demand their attention. This location should be within a production shop that they are assigned to oversee employees
in. Since the first line supervisors will be required to work over-time as needed to meet mission requirements, the first line supervisors’ salary IS REIMBURSABLE and shall not be factored into overhead rates.
4.18.5 Contractor’s Office Personnel: All personnel necessary for the contractor’s daily operations—such as administrative, clerical, human resources, and accounting staff—shall, without exception, be treated as overhead costs. The contractor shall not invoice separately for the salaries of these positions.
4.18.6 Employee Classification: The classifications provided by the Government to assist the contractor with estimating the wage and benefit requirements for the position were selected to match the requirements of the work to be performed as well as to provide the higher wage and benefit requirement when compared between the DBA and SCA requirements. Any guidance provided by the Government was for the contractor’s benefit. The contractor is solely responsible, based on the requirements of this contract, to classify employees appropriately between the DBA Classification Descriptions and the SCA Directory of Occupations, as appropriate.
4.18.7 Employee conduct: USG supervision will notify, via Government E-mail, the assigned contractor first line supervisor when a contractor employee is not meeting expectations of standards of conduct or assigned job duties. The first line supervisor shall communicate, via Government email, the level of corrective action taken for transparency. The contractor is responsible for the conduct of its employees at all times while the employees are on the installation. The Installation Commander may, at his discretion, bar an individual from the installation pursuant to 18 U.S.C. 1382. Such exclusion shall not excuse the contractor of delay or failure to perform work in this task order. At no time will a contractor commit the Government to a purchase or be the decision maker on a product being procured. Contractor personnel shall at no times direct the activities of a Government employee or assume their responsibilities. All acceptance documentation must be approved/signed by an authorized Government employee.
4.18.8 During the period of performance, the contractor shall obtain the advance written consent of the PCO prior to making personnel substitutions and back filling positions. Replacements for all labor categories shall possess qualifications equal to or exceeding the minimum qualifications of that labor category. The PCO may require, in writing, that the contractor remove from the labor pool any employee the PCO deems incompetent, careless, or otherwise objectionable.
4.19 Parking: All contractor personnel and their Privately Owned Vehicles (POV) will strictly adhere to state and federal regulations regarding licensing and registration at each site.
All contractor personnel will register their vehicles at each sites Visitor Control Center for access to the site and abide by the strict security levels when deemed necessary.
4.19.1 RRAD: All contractor personnel shall register their Privately Owned Vehicle at
Building 455A IAW paragraph 4.20. There are no reserved parking places for the contractors and their employees. Parking is a first come first serve availability.
4.19.2 SIAD: At times when central parking is required due to heightened security levels,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .