Specific AoI Camera Monitoring System W911RQ-26-S-C001-A002.pdf

PDF 122 KB Posted

Attached to
Army Contracting Command – Red River Army Depot (ACC-RRAD) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)
Solicitation number
W911RQ-26-S-C001
Issued by

About this file

This document is a Commercial Solutions Opening (CSO) Area of Interest (AoI) issued by the Army Contracting Command-Red River Army Depot (ACC-RRAD) for a Camera Monitoring System. The solicitation seeks innovative solutions to replace or refurbish a camera system at the RRAD vehicle test track, which was previously disabled by a lightning strike. The current system consists of fourteen pole-mounted cameras connected via fiber optics, positioned around a one-mile oval track used for testing tactical and combat vehicles.

Interested vendors must submit a written solution via email by 5:00 P.M. (CDT) on 20 Nov 2025, with the subject line "INNOVATIVE SOLUTION" to usarmy.rrad.acc.mbx.cso@army.mil. Respondents must be registered in the System for Award Maintenance (sam.gov). The CSO is not an obligation to award, and all solutions from partial to complete replacement will be considered. The solicitation is authorized under DoD Class Deviation 2022-O0007 and seeks technology that is new or represents a novel application of existing technology as of the proposal submission date.

View the file

Other files

File Type Posted
W911RQ-26-S-C001-A021 406A Facilty Upgrades.pdf PDF
W911RQ-26-S-C001-A020 468 Electrical Repairs.pdf PDF
W911RQ-26-S-C001-A019 Wire Harness Production Facility.pdf PDF
W911RQ-26-S-C001-A018 Rubber Strip Stock AoI.pdf PDF
W911RQ-26-S-C001-A017 bldg 325.pdf PDF
Advanced Planning Briefing to Industry.pdf PDF
W911RQ-26-S-C001-A016 Overhead Reactionary Torque Arm System.pdf PDF
Advanced Planning Briefing to Industry.pdf PDF
W911RQ-26-S-C001-A015 Caterpillar Engine Sustainment and Operations Support.pdf PDF
W911RQ-26-S-C001-A012 Micro Trucks.pdf PDF
412B AoI Platform Lift Install 5.0 W911RQ-26-S-C001-A013.pdf PDF
W911RQ-26-S-C001-A012 Micro Trucks.pdf PDF
Track Disassembly W911RQ-26-S-C001-A014.pdf PDF
W911RQ-26-S-C001-A012 Micro Trucks.pdf PDF
W911RQ-26-S-C001-A012 Micro Trucks.pdf PDF
W911RQ-26-S-C001-A011 T-130 track blocks.pdf PDF
W911 RQ-26-S-C001-A010 T-158 Pin Bushing Press.pdf PDF
W911RQ-26-S-C001-A009 DSB ATLAS Crane AoI.pdf PDF
W911 RQ-26-S-C001-A010 T-158 Pin Bushing Press.pdf PDF
W911RQ-26-S-C001-A009 DSB ATLAS Crane AoI 01 May 26.pdf PDF
W911RQ-26-S-C001-A009 DSB ATLAS Crane AoI.pdf PDF
W911RQ-26-S-C001-A006 - Blast Booth 364.pdf PDF
W911RQ-26-S-C001-A006 - Blast Booth 364.pdf PDF
W911RQ-26-S-C001-AOI A008 Supplemental Labor Management 9 FEB.pdf PDF
W911RQ-26-S-C001-A006 - Blast Booth 364.pdf PDF
Advanced Manufacturing Acceleration at Red River Army Depot RRAD Domestic Component Manufacturing OIB Sited Scalable Production AoI A007.pdf PDF
Specific AoI Camera Monitoring System W911RQ-26-S-C001-A002.pdf PDF
W911RQ-26-S-C001-A006 - Blast Booth 364.pdf PDF
Power Pack AOI A005 W911RQ-26-S-C001-A005.pdf PDF
CSO AOI Track Pin and Bushing W911RQ-26-S-C001-A004.pdf PDF
CSO AOI Track Pin and Bushing W911RQ-26-S-C001-A004.pdf PDF
Power Pack AOI A005 W911RQ-26-S-C001-A005.pdf PDF
Power Pack AOI A005 W911RQ-26-S-C001-A005.pdf PDF
CSO AoI for AS9100 Strategic Partner W911RQ-26-S-C001-A003.pdf PDF
Specific AoI Fixture Removal BFVS Hull W911RQ-26-S-C001-A001.pdf PDF
Power Pack AOI A005 W911RQ-26-S-C001-A005.pdf PDF
CSO AOI Track Pin and Bushing W911RQ-26-S-C001-A004.pdf PDF
CSO AoI for AS9100 Strategic Partner W911RQ-26-S-C001-A003.docx DOCX document
Specific AoI Camera Monitoring System W911RQ-26-S-C001-A002.docx DOCX document
Specific AoI Fixture Removal BFVS Hull W911RQ-26-S-C001-A001.docx DOCX document
CSO AOI Track Pin and Bushing W911RQ-26-S-C001-A004.docx DOCX document
Power Pack AOI A005 W911RQ-26-S-C001-A005.docx DOCX document
RRAD CSO W911RQ-26-S-C001.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Agency: Army Office: Army Contracting Command-Red River Army Depot (ACC-RRAD) AoI Title: Camera Monitoring System CSO AoI Number: W911RQ-26-S-C001-A002 AoI Release Date: 20 Oct 2025 Responses: See W911RQ-26-S-C001 CSO for Procedure Details

1. General Information

1.1 Introduction

This announcement is for a Camera Monitoring System Area of Interest (AoI) under the ACC- RRAD Commercial Solutions Opening W911RQ-26-S-C001-A002. Interested parties are highly encouraged to visit the Government Point of Entry (www.sam.gov) to review the ACC-RRAD CSO special posting in its entirety to obtain more information on the process for submission evaluation of the CSO AoI Responses.

This CSO AoI seeks to solicit innovative solutions that meet the objectives detailed in Sections 1.2 and 1.3. The term innovative is defined as any technology, process, or method, including research and development that is new as of the date of proposal submission; or any new application of an existing technology, process or method as of the proposal date.

ACC-RRAD is not obligated to extend a request for proposal or make an award as a result of this CSO AoI; all awards are subject to the availability of funds and successful negotiations. This CSO AoI is not an authorization to begin performance, and in no way obligates the Government for any costs incurred by the Offeror associated with developing a Response. Prior to commencement of any activities associated with performance under this CSO AoI, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established. ACC-RRAD reserves the right to modify the requirements of this CSO AoI.

The authority to issue this CSO AoI is derived from ACC-RRAD Commercial Solutions Opening W911RQ-26-S-C001, dated 01 OCT 2025. The CSO authority is DoD Class Deviation 2022- O0007.

1.2 AoI Background

The RRAD vehicle test track is a one-mile oval shaped track used for operational testing of tactical and combat vehicles produced by the Depot. A camera monitoring system was previously installed around the perimeter of the track to monitor test vehicle traffic, provide recording in case of accidents, and control entry/exit to the center storage area of the track. The test track control and video monitoring station is located in a building at the North end of the track. The camera system is currently out of service due to being struck by lightning. RRAD is seeking potential commercial options to facilitate the replacement or refurbishment of the entire camera monitoring system.

1.3 Camera System Details

The current system consists of fourteen (14) pole-mounted cameras placed around the perimeter of the track that are connected via fiber optics and routed back to the track monitoring station for viewing and recording. The system is not connected to any other internal RRAD network. RRAD seeks commercial options for modernizing and bringing the complete system back into service. All options from partial replacement to complete replacement will be considered.

2. AoI Constraints

1. Any selected company/companies will be required to be registered in the System for Award Maintenance (sam.gov).

3. Submission Requirements

A written solution must be sent via e-mail submission by 5:00 P.M. (CDT) on 20 Nov 2025, with subject line stating INNOVATIVE SOLUTION to usarmy.rrad.acc.mbx.cso@army.mil

Solutions received after the specified due date and time will be discarded and not be evaluated by the Government.

AoI Open Period – This AoI shall close at 5:00 P.M (CDT); 20 NOV 2025.

Point of contacts:

AoI questions can be sent to:

Contracting Officer: christopher.l.johnston20.civ@army.mil

AoI POC: jacob.j.horn.civ@army.mil mailto:jacob.j.horn.civ@army.mil

File details come from the government source that posted it. Updated .