Specific AoI Fixture Removal BFVS Hull W911RQ-26-S-C001-A001.docx
DOCX document 36 KB Posted
- Solicitation number
- W911RQ-26-S-C001
About this file
This document is an Area of Interest (AoI) for a Fixture Removal System for Bradley Fighting Vehicle System (BFVS) hulls, issued by Army Contracting Command-Red River Army Depot (ACC-RRAD). The solicitation seeks innovative solutions to replace current manual fixture removal methods that involve chipping hammers, air hammers, and grinders, which pose safety risks due to repetitive stress and noise. RRAD is specifically looking for a system that can remove fixtures faster, safer, with high quality and repeatability, while maintaining the integrity of the 7017-aluminum alloy hull.
The AoI is part of a larger Commercial Solutions Opening (CSO) for Organic Industrial Base Modernization, with responses due by 5:00 PM CDT on 20 NOV 2025. Interested companies must be registered in SAM.gov and submit innovative solutions via email. The system must be operable and maintainable by Red River Army Depot, approved by the RRAD Safety office, and meet program management office requirements. While the government is not obligated to make an award, this solicitation seeks to improve manufacturing processes through advanced technological solutions that enhance worker safety and operational efficiency.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Agency: Army Office: Army Contracting Command-Red River Army Depot (ACC-RRAD) AoI Title: Fixture Removal BFVS Hull CSO AoI Number: W911RQ-26-S-C001-A001 AoI Release Date: 20 OCT 2025 Responses: See W911RQ-26-S-C001 CSO for Procedure Details
1. General Information
1.1 Introduction
This announcement is for a Fixture Removal BFVS Hull Area of Interest (AoI) under the ACC-RRAD Commercial Solutions Opening W911RQ-26-S-C001-A001. Interested parties are highly encouraged to visit the Government Point of Entry (www.sam.gov) to review the ACC-RRAD CSO special posting in its entirety to obtain more information on the process for submission evaluation of the CSO AoI Responses.
This CSO AoI seeks to solicit innovative solutions that meet the objectives detailed in Sections 1.2 and 1.3. The term innovative is defined as any technology, process, or method, including research and development that is new as of the date of proposal submission; or any new application of an existing technology, process or method as of the proposal date.
ACC-RRAD is not obligated to extend a request for proposal or make an award as a result of this CSO AoI; all awards are subject to the availability of funds and successful negotiations. This CSO AoI is not an authorization to begin performance, and in no way obligates the Government for any costs incurred by the Offeror associated with developing a Response. Prior to commencement of any activities associated with performance under this CSO AoI, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established. ACC-RRAD reserves the right to modify the requirements of this CSO AoI.
The authority to issue this CSO AoI is derived from ACC-RRAD Commercial Solutions Opening W911RQ-26-S-C001, dated 01 OCT 2025. The CSO authority is DoD Class Deviation 2022-O0007.
1.2 AoI Background
RRAD is performing work to reconfigure the hulls for “Bradley Fighting Vehicle System” (BFVS). Currently we are using multiple methods to remove various fixtures from the 7017-aluminum alloy hull inside and out. Due to the nature of the alloy using heat such as from a plasma arc system is not allowed for removal of fixtures. Currently the process methodology in use uses a chipping hammer, an air hammer with a chisel affixed, grinders, and cut off wheels. Our goal is to eliminate the chipping hammer from the process as there are safety concerns from repetitive stress and the loud noise that it creates especially inside the hull. Some of the options that we have explored, such as specialized cutting disk pose their own safety risk and cannot be permitted for use by workers.
1.3 Fixture Removal System
RRAD is interested in a system that would allow for the removal of the fixtures to be done faster, safer, with a high degree of quality, and repeatability. The system must meet the requirements of the program management office to maintain the integrity of the hull’s metal alloy. The system must be cleared by the RRAD Safety office and show improvement for worker safety. Any equipment that is part of the system must be operable and maintainable by Red River Army Depot.
2. AoI Constraints
1. Any selected company/companies will be required to be registered in the System for Award Maintenance (sam.gov).
3. Submission Requirements A written solution must be sent via e-mail submission by 5:00 P.M. (CDT) on 20 NOV 2025, with subject line stating INNOVATIVE SOLUTION to usarmy.rrad.acc.mbx.cso@army.mil Solutions received after the specified due date and time will be discarded and not be evaluated by the Government.
AoI Open Period – This AoI shall close at 5:00 P.M (CDT); 20 NOV 2025.
Point of contacts:
AoI questions can be sent to:
Contracting Officer: christopher.l.johnston20.civ@army.mil AoI POC: jacob.j.horn.civ@army.mil
File details come from the government source that posted it. Updated .