W56HZV21R0185-0004.pdf
PDF 247 KB Posted
- Solicitation number
- W56HZV21R0185
About this file
This solicitation is for a follow-on production contract for Cold Weather All-Terrain Vehicles (CATVs). The Army seeks proposals for the acquisition of 163 CATVs over a potential seven-year contract consisting of production units, spare parts, and Contractor Logistics Support. The contract type will be Firm Fixed Price, Requirements with ordering periods of five base years and two option years. The CATVs must be capable of amphibious, arctic, and sling load operations. The successful offeror will be the contractor who delivered a prototype CATV deemed successful under a previous Other Transaction agreement. The solicitation is set aside for these offerors and provides production contract requirements, including engineering documentation, testing, logistics, and program management support.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0004 2022MAR24
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
JENNA R. BURRES
EMAIL: JENNA.R.BURRES.CIV@ARMY.MIL
W56HZV-21-R-0185
2022JAN14
X
X 2022MAR28 05:00pm
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 81
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JENNA R. BURRES
Buyer Office Symbol/Telephone Number: CCTA-HTA-A/(586)282-3509
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 This solicitation and resulting contract is set-aside to the offerors for the Cold Weather All-Terrain Vehicle (CATV), under Ground
Vehicle System Other Transaction Authority Agreement W15QKN-17-9-1025; RPP 20-04, and who were deemed to have a successful prototype under the authority of 10 U.S. Code 2371b "Authority of the Department of Defense to carry out certain prototype project."
The selection process will be executed under authority 10 U.S. Code 2371b; any reference to the Federal Acquisition Regulation (FAR) is for the resulting production contract execution only.
The Government reserves the right to make no award as a result of this solicitation.
A.2 This Solicitation and resultant Contract are for the acquisition of the Cold Weather All-Terrain Vehicle (CATV), which includes the procurement of logistical and test support, as well as ancillary hardware associated with the vehicles. CATV provides enhanced mobility during Extreme Cold Weather (ECW) for a nine (9) Soldier squad and their associated equipment. The U.S. Army must be capable of operating throughout the arctic region and other ECW locations in all weather conditions in all types of terrain. The CATV will provide transportation for a nine (9) person squad element, emergency medical evacuation, command and control capability, and general cargo transportation on and off-road under a wide range of otherwise impassable terrain and ECW conditions providing movement capability to conduct Homeland Defense (HD), Defense Support of Civil Authorities (DSCA), and Search and Rescue (SAR) mission sets as well as support year round training.
A.3 The Government intends to award a competitive production contract as a Firm Fixed Price (FFP) Requirements type contract type with five base years and two option years for a total of seven years. This action will use Best Value Selection procedures. The total estimated value for this requirement is based on the total Army Acquisition Objective (AAO) quantity of 163 vehicles. The period of performance for this proposed contract is FY 2022 through FY 2032, including deliveries and services that may extend beyond the seven ordering years.
A.4 Background:
A.4.1 The Government intends to meet the expedited fielding of the CATV capability through a two-phased acquisition approach in accordance with (IAW) 10 USC 2371b. Phase I utilized OTA task assignments for the prototyping phase. The Government will procure the
CATV as a Table of Distribution and Allowances (TDA) item and intends for the CATV to not become a program of record.
A.4.2 Phase 1: OTA Request for Prototype Proposal (RPP) 20-4, for the CATV was issued by the Army Contracting Command Detroit Arsenal
(ACC-DTA) on 9 June 2020 to the National Center for Manufacturing Sciences (NCMNS) for the National Advanced Mobility Consortium (NAMC) and closed 16 July 2020. Two consortium members responded to the RPP through submission of a proposal.
A.4.3 Phase 2: Development of the CATV to fulfill the requirements for ECW using a non-developmental item will be pursued. A FAR Based production contract will be awarded following successful prototype determination and findings from the Phase I CATV Prototype OTA. The
Production contract award is anticipated to be in FY22 and will be a five year with two one year Option requirements contract. Per AROC on 15 April 2019, the Vice Chief Secretary of Army (VCSA) approved the procurement objective of 110 vehicles (59 COMPO 1 and 51 COMPO 2 vehicles) to be completed by Fiscal Year (FY)2027. As part of sustainment for the CATV the program office will fund three years of
Contractor Logistics Support (CLS).
A.4.4 This Solicitation competes the production contract amongst those contractors who successfully complete the OTA task assignment and deliver a CATV that is deemed a successful prototype, IAW 10 USC 2371b.
A.5 "RESERVED"
A.6 ALL OR NONE-COMMERCIAL ITEM ACQUISITION
(a) This provision requires OFFERORS to insure that the proposal or quote must offer to provide the total quantity of the items in this solicitation.
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
A.7 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website: http://acc.army.mil/contractingcenters/acc-
2 81
W56HZV-21-R-0185
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
wrn/CompMgmtOffice.html
A.8 Electronic Contracting
(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website (https://www.beta.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via beta.SAM.gov/.
(c) Requirements for the online beta.SAM bid submission:
(1) Vendors must log into beta.SAM.gov to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in beta.SAM at "<"http://www.beta.sam.gov ">" (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into beta.SAM, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) beta.SAM will send an email to vendors registered email address confirming the electronic submission.
Note to offerors:
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the
Issued By office. Offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. If the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late.
Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on beta.SAM after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a
FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.9 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
Amendment Number: Date:
3 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Amendment Number: Date:
Amendment Number: Date:
Amendment Number: Date:
A.10-A.99 RESERVED
A.100 LOCAL NARRATIVES
A.100.1. NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)
Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
A.100.2 NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)
In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of
ID badges, etc).
A.100.3 RESERVED
A.100.4 RESERVED
A.100.5 RESERVED
A.100.6 RESERVED
A.100.7 RESERVED
A.100.8 ALL OR NONE-COMMERCIAL ITEM ACQUISITION
(a) Any proposal or quote must offer to provide the total quantity of the items in this solicitation.
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
END OR NOTICE
*** END OF NARRATIVE A0001 ***
Solicitation Number: W56HZV-21-R-0185
Amendment Number: 0004
I. Amendment 0004 to Solicitation W56HZV-21-R-0185 is being issued to incorporate the following changes:
A. Section A:
1. A.100.6 Proposal Adequacy Checklist Narrative is removed to align with Section L and mark A.100.6 as RESERVED.
4 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2. A.100.3, A.100.4, A.100.5, and A.100.7 are removed as these sections are duplicates of A.6, A.7, A.8, and A.9. Mark A.100.3, A.100.4, A.100.5, and A.100.7 as RESERVED.
B. Section C:
1. Renumber C.100.5 Service Contract Reporting from C.100.5 to C.100.12.
C. Section E:
1. Add narrative E.100.2 First Production Vehicle Acceptance.
D. Section H:
1. Change reference from DFARS Clause 252.216-7006 in H.1.1 to FAR Clause 52.216-18.
E. Section I:
1. Add the following FAR Clauses:
a. 52.209-4, 52.211-17, 52.222-41, 52.222-43, 52.222-44, 52.222-55, 52.222-56, 52.229-12, 52.229-6, and 52.246-4.
2. Add the following DFARS Clauses:
a. 252.209-7008, 252.222-7002, 252.233-7001 and 252.246-7006.
3. Update DFARS Clause 252.245-7004 to DFARS Clause 252.245-7004 DEVIATION 2022-O0006.
F. Section L:
1. Change L.3.1:
FROM: L.3.1 The offeror shall prepare a Technical Factor proposal addressing the following sub-factors, not to exceed 75 total combined pages:
a. Sling Load
b. Government Testing
TO: L.3.1 The offeror shall prepare a Technical Factor proposal addressing the following sub-factors, not to exceed 75 total combined pages:
a. Sling Load
b. Government Testing
Cover pages, face pages, indexes, table of contents, glossaries, acronym lists, and lists of tables and figures will NOT be counted toward the page limitation listed above.
2. Change L.4.2.2:
FROM: L.4.2.2 Attachment 0031 Pricing Workbook Spreadsheet:
The offeror shall provide its completed RFP Attachment 0031 Pricing Workbook Spreadsheet with its proposal. Complete the attachment in accordance with the instructions included within the attachment. Propose Firm-Fixed-Prices for all CLINs, including all spare parts included in
Attachment 0031 Pricing Workbook Spreadsheet. Do not enter any proposed prices into Section B of the RFP. Submit Attachment 0031 Pricing Workbook Spreadsheet in Microsoft Excel format. All offerors are required to provide a Proposed Unit Price for EVERY part listed on the "Parts List" worksheet tab of Attachment 0031 Pricing Workbook Spreadsheet, regardless if the individual offer's individual vehicle configuration has that specific part or not, or if the specific part or parts referenced, is included in a higher assembly. Offeror's are instructed to NOT enter "N/A" in the spreadsheet. If the offeror enters zero, the government will make the assumption that the
5 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
specific part will be provided at no cost to the government.
TO: L.4.2.2 Attachment 0031 Pricing Workbook Spreadsheet:
The offeror shall provide its completed RFP Attachment 0031 Pricing Workbook Spreadsheet with its proposal. Complete the attachment in accordance with the instructions included within the attachment. Propose Firm-Fixed-Prices for all CLINs, including all spare parts included in
Attachment 0031 Pricing Workbook Spreadsheet. Do not enter any proposed prices into Section B of the RFP. Submit Attachment 0031 Pricing Workbook Spreadsheet in Microsoft Excel format. All offerors are required to provide a Proposed Unit Price for EVERY part listed on the "Parts List" worksheet tab of Attachment 0031 Pricing Workbook Spreadsheet, regardless if the individual offer's individual vehicle configuration has that specific part or not, or if the specific part or parts referenced, is included in a higher assembly. All offerors are required to provide a
Proposed Price for EVERY CLIN on every worksheet of Attachment 0031 Pricing Workbook Spreadsheet.
Offeror's are instructed to NOT enter "N/A" in the spreadsheet. If a cell contains "$-" or similar language the U.S. Government will treat this as zero ($0) in the Attachment 0031 Pricing
Workbook. A zero ($0) for any part on the "Parts List" worksheet tab, OR for any CLIN listed on
Attachment 0031, shall be provided at no cost to the U.S. Government.
*Offerors Please Note: The update to L.4.2.2 overrides the answer, A.160, given to Q.160 on the
Question and Answers Log on 2/1/2022.
G. Section M:
1. Change M.4.1.1:
FROM: M.4.1.1 Total Evaluated Price: The Price Factor evaluation will result in a determination of the Total Evaluated Price. The Total Evaluated Price equals the sum of the proposed prices for all
CLINs, as calculated in Attachment 0031 Pricing Workbook.
TO: M.4.1.1 Total Evaluated Price: The Price Factor evaluation will result in a determination of the Total Evaluated Price. The Total Evaluated Price equals the sum of the proposed prices for all
CLINs, as calculated in Attachment 0031 Pricing Workbook. IAW L.4.2.2, a zero ($0) for any part on the "Parts List" worksheet tab, OR for any CLIN listed on Attachment 0031, shall be provided at no cost to the U.S. Government. CLINs priced at zero ($0) will be evaluated at a cost of ($0) zero dollars and the offerors total evaluated price will reflect no cost for the listed item or items.
2. Add narrative M.100.5 Evaluation Criteria for Range Pricing.
3. Add narrative M.100.6 Evaluation of Incomplete Option Pricing.
II. Except as stated in the changes above, all other terms and conditions of Solicitation W56HZV21R0185 remain in full force and effect.
*** END OF NARRATIVE A0005 ***
6 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 PROGRAM OVERVIEW
C.1.1 General
C.1.2 System Requirements
C.1.3 System Description
C.2 PROGRAM MANAGEMENT
C.2.1 Integrated Master Plan
C.2.2 Integrated Master Schedule
C.2.3 RESERVED
C.2.4 Cybersecurity
C.2.5 Service Contract Reporting
C.2.6 Security Requirements
C.3 MEETINGS, ASSESSMENTS AND REVIEWS
C.3.1 Participation and Administration
C.3.2 Start of Work Meeting (SOWM)
C.3.3 Test Reviews
C.3.4 Logistics Reviews
C.3.5 Program Management Review (PMR)
C.3.6 RESERVED
C.3.7 In-Process Review
C.3.8 Technical Engineering Integrated Product Team (IPT)
C.4 SYSTEMS ENGINEERING
C.4.1 General
C.4.2 System Level Design Document
C.4.3 Manufacturing Development Strategy
C.4.4 Transportability Report
C.4.5 Performance Specification Report
C.4.6 System Specification Sheet
C.4.7 Reliability, Availability and Maintainability (RAM) Management Program
C.4.8 Risk Management Planning
C.5 TEST
C.5.1 Government Testing
C.5.2 Production Prove-out Test (PPT)Phase III
C.5.3 Failure Analysis and Corrective Actions Report (FACAR) Process
C.5.4 Test Meetings
C.5.5 Test Vehicle Modifications
C.5.6 Field Service Representative (FSR)
C.5.7 System Support Package
C.5.8 Parts Disposal
C.5.9 Refurbishment of OTA Test Vehicles (Post PPT-Phase IIIA Testing)
C.5.10 Refurbishment of PPT-Phase III Test Vehicles (Post PPT-Phase IIIB Testing)
C.5.11 Test Site Training Support
C.6 CONFIGURATION MANAGEMENT
C.6.1 Configuration Management (CM) Program
C.6.2 Version Control and Item Identification Traceability
C.6.3 Configuration Identification
C.6.4 Engineering Changes
C.6.5 Engineering Release System
C.7 ENVIRONMENT, SAFETY, AND OCCUPATIONAL HEALTH (ESOH)
C.7.1 System Safety and Environmental Engineering
C.8 INTEGRATED PRODUCT SUPPORT (IPS)
C.8.1 IPS Program Management
C.8.2 Logistics Support Analysis (LSA) and Logistics Product Data (LPD)
C.8.3 Provisioning
C.8.4 Long Lead-Time Items (LLTI)
C.8.5 Item Unique Identification (IUID)
C.8.6 Packaging
C.8.7 Special Tools and Test Equipment (STTE)
C.8.8 Technical Publications
C.8.9 Training
C.9 CONTRACTOR LOGISTICS SUPPORT (CLS)
C.9.1 General
C.9.2 CLS Personnel
C.9.3 RESERVED
C.9.4 Government Provisions
7 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.9.5 Contractor Provisions
C.9.6 Contractor Furnished Property (CFP)
C.9.7 Physical Security
C.9.8 Prohibition on Use of Keys and Lock Combinations
C.9.9 Identification of Contractor Employees and Work Products
C.9.10 Contractor Travel
C.9.11 Spares and Parts Management
C.9.12 Disposal of Hazardous Materials
C.9.13 Petroleum, Oil and Lubricants (POL)
C.9.14 Field Logistics Management
C.10 PRODUCTION DATABASE
C.10.1 General
C.11 HARDWARE AND MATERIAL
C.11.1 Cold Weather All-Terrain Vehicle (CATV)
C.11.2 Basic Issue Items (BII), Additional Authorized List (AAL), and Components of the End Item (COEI)
C.11.3 Spares Acquisition Integrated with Production (SAIP) Strategy
C.11.4 Authorized Stockage List (ASL)
C.11.5 Advanced Manufacturing Methods
C.12 GOVERNMENT FURNISHED PROPERTY
C.12.1 Government Furnished Equipment, Information, and Material (GFE, GFI, and GFM)
C.13 WARRANTY
C.13.1 General
C.13.2 Warranty Database
C.1 PROGRAM OVERVIEW
C.1.1 General
This Statement of Work (SOW) is for the production requirements for the Cold Weather All-Terrain Vehicle (CATV).
C.1.2 System Requirements
C.1.2.1 Description
This SOW consists of the supplies and services required for production including vehicles, Program Support and Management, Integrated
Product Support (IPS), Test Support, Contractor Logistics Support (CLS), and the storage and maintenance of hardware procured for the
CATV.
C.1.2.2 Data
The contractor shall prepare deliverable program data In Accordance With (IAW) the format and content specified in the Data Item
Descriptions (DID) and deliver all electronic data via Lifecycle Management Process (LCMP) Integrated Development Environment (IDE) CDRL
Module and IAW applicable Contract Data Requirements List (CDRL).
The contractor shall obtain access to LCMP in order to submit CDRLs. The contractor shall request LCMP access by submitting an Account request. Visit https://members.lcmp.af.mil/LCMPHELP/wiki/13/oem-contractor-gaining-access for requirements and instructions to obtain access. Direct any questions to the PEO CS&CSS LCMP Team at usarmy.detroit.peo-cs-css.list.lcmp-team@mail.mil.
C.1.2.3 Applicable Documents
The contractor shall utilize the most recent versions of all DIDs, regulations, specifications, and standards listed throughout this contract. See list of applicable documents in Attachment 0003, Applicable Documents.
C.1.2.4 Contractor Role
The contractor shall furnish all data, supporting labor, supplies, services, facilities and equipment as required under this contract.
C.1.2.5 Training for LCMP
The LCMP IDE training is available at the following: Refer to Attachment 0028 ARMY CDRL MODULE OEM CONTRACTOR TRAINING. Direct any questions to the PEO CS&CSS LCMP Team via usarmy.detroit.peo-cs-css.list.lcmp-team@mail.mil.
C.1.3 System Description
The CATV shall perform IAW the requirements stated in Attachment 0001, CATV Performance Specification. The CATV will be capable of operating in all weather conditions in all types of terrain, to include those encountered during Extreme Cold Weather (ECW). The CATV will provide transportation for a nine-person element in arctic survival gear equipped with infantry weapons and their associated equipment. The CATV shall be able to perform emergency medical evacuation, command and control capability, and general cargo transportation on- and off-road under a wide range of otherwise impassable terrain and ECW conditions providing a movement capability to conduct HD, DSCA, and SAR mission sets as well as support year round training. The CATV FoV will consist of general purpose and cargo variants. The CATV General Purpose variant will also be configurable to meet CASEVAC or command and control (C2) mission requirements.
8 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The CATV FoV will be non-developmental, off-the-shelf vehicles.
C.2 Program Management
C.2.1 Integrated Master Plan (IMP)
The contractor shall develop, maintain and deliver a detailed Integrated Master Plan (IMP) for the CATV IAW CDRL C001. The Contractor
IMP shall outline significant accomplishments and exit criteria for the contracts major events to include at a minimum: Preliminary
Design Review (ref: C.3.2.1), Final Design Review, to include Production Readiness Review (ref: C.3.2.2), Test Reviews (ref: C.3.3) and
Logistics Reviews (C.3.4). The contractor shall report on program progress at each Program Management Review (PMR), along with meetings, audits, assessments, and reviews in accordance with the IMP.
C.2.2 Integrated Master Schedule (IMS)
The contractor shall develop, maintain, and deliver an IMS IAW CDRL C002 and Attachment 0002. The contractor IMS shall be directly traceable to the contractor IMP and be consistent with the contractors Contract Work Breakdown Structure (CWBS). The IMS shall be compatible with Microsoft Project v2013 or later version and contain logically networked, detailed program activities encompassing contract milestones, events, decision points, critical subcontract tasks or hand-offs, external dependencies, vehicle production, Government Furnished Equipment (GFE), Government Furnished Information (GFI), exit criteria, discrete tasks and activities , and planning packages to budget for early baseline planning.
The contractor IMS shall clearly identify critical path activities and reflect risk mitigation tasks. The contractor shall present the
IMS at the Start of Work Meeting (SOWM) and at each PMR. The contractors shall notify the government immediately upon the discovery of a delay in meeting contract requirements and provide a get-well plans within 20 Business days of discovery of the delay. The contractor shall update the IMS monthly in accordance with CDRL C002, Integrated Master Schedule. Changes to the IMS shall be tracked on a revision log and delivered with the IMS.
C.2.3 RESERVED
C.2.4 CYBERSECURITY
C.2.4.1 Policies
The Contractor shall comply with Cybersecurity requirements in accordance with DoDI 8510.01 Risk Management Framework (RMF) for DoD
Information Technology (IT), DoD 8500.01 Cybersecurity, National Industrial Security Program (NISP) 800-37 Guide for Applying the Risk
Management Framework to Federal Information Systems: A Security Lifecycle Approach, NIST SP 800-53 Recommended Security Controls for
Federal Information Systems and Organizations, CJCSM 6510.01IA Chairman of the Joint Chiefs of Staff Manual, 6212.01E Interoperability and Supportability of Information Technology and National Security Systems, DoD 5220.22-M National Industrial Security Program Operating
Manual (NISPOM), DoDI 8551.1 Ports, Protocols and Services Management (PPSM), Federal Information Security Management Act (FISMA), AR
380-5 Department of The Army Information Security Program, and AR 25-2, Information Assurance.
C.2.4.2 Cybersecurity Certifications
The contractor shall have or obtain External Certification Authority (ECA) Certificates, Federated Bridge Certificates, or DoD Common
Access Cards (CAC) for contractor personnel who require access to Government information systems in the performance of this contract.
Details on the ECA program and authorized ECA vendors can be found at: http://iase.disa.mil/pki/eca/ and details on the Federated bridge program can be found at: http://iase.disa.mil/pki-pke/interoperability/Pages/index.aspx .
C.2.4.3 Cybersecurity Strategy
The contractor shall develop and implement a Cybersecurity Strategy that addresses the contractors Software Development, Software
Assurance, Hardware Validation, Supply Chain Risk Management, Testing (Architecture and Configuration), Vulnerability, Management, Patch
Management, Release Management and Configuration Management efforts for the CATV. This strategy will be used to validate the systems cybersecurity posture throughout the contract period of performance. The contractor shall execute the Cybersecurity Strategy that consists of: analyzing system security requirements derived from the requirements of this contract; designing a system and the security architecture; developing detailed system security design; developing security test strategy; and developing a report that outlines the system risk for the proposed architecture. The cybersecurity strategy shall be made available to the Government for review upon request.
C.2.4.4 Data Protection
The contractor shall protect CATV program data that resides on the contractors network IAW DODI 8582.01.
C.2.4.5 Cybersecurity Training IAW cybersecurity directives, the contractor shall be in compliance for all tasks identified in Section
C.2.5 of this contract. Accordingly, the contractor shall:
a) Identify all personnel assigned with cybersecurity roles and functions and ensure certification and background checks are complete and current
b) Ensure that training requirements and certifications mandated by DoD 8570.01-M Information Assurance
Workforce Improvement Program for Information Assurance Technical (IAT) Level III are met. Current DoD 8570.01-
M information can be found at http//iase.disa.mil/iawip/Pages/iabaseline.aspx
9 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.2.4.6 Product Development and Updating
C.2.4.6.1 Cybersecurity Mitigation
During product development for the Government, the contractor shall ensure that cybersecurity mitigation strategies have been applied to the development environment prior to Government data being loaded onto assets or software for testing or delivery. Cybersecurity mitigation strategies consist of: security updates, service packs, and changes to operating procedures as physical and cyber vulnerabilities are detected. Operating systems, routers, servers, development platforms and the application delivered to the Government shall comply with all known applicable Department of Defense Computer Emergency Response Team (DoD-CERT) Alerts, Bulletins, and
Technical Advisory Notices.
C.2.4.7 Product National Institute of Standards and Technology (NIST), National Information Assurance Partnership (NIAP), and Federal
Information Processing Standards (FIPS) Usage
The contractor shall ensure that all Information Assurance (IA) and IA enabled products are National Security Telecommunications and
Information Systems Security Policy Number 11 (NSTISSP-11) compliant and are validated by accredited labs under National Security Agency
(NSA), the National Information Assurance Partnership (NIAP) Common Criteria Evaluation and Validation Scheme or National Institute of
Standards and Technology (NIST) Federal Information Processing Standards (FIPS) Cryptographic Module Validation Program (CMVP) to include; FIPS Pub 197 Advanced Encryption Standard, FIPS Pub 140-2 Security Requirements for Cryptographic Modules, FIPS Pub 198-1 The
Keyed-Hash Message Authentication Code (HMAC), and IETC RFC 2560 X.509 Internet Public Key Infrastructure.
C.2.5 SERVICE CONTRACT REPORITNG
C.2.5.1 Reporting
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor shall completely fill in all required data fields in the format using the following web address: https://www.asamra.army.mil/scra/#section1 . The required information includes the following:
(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;
(5) Direct labor hours (including sub-contractors);
(6) Direct labor dollars paid this reporting period (including sub-contractors);
(7) Total payments (including sub-contractors);
(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant
FSC for each sub-contractor if different);
(9) Data collection cost;
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity
(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United
States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language; and
(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through
September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at:
https://armycmra.dmdc.osd.mil/default.aspx?ReturnUrl=%2f .
C.2.6 Security Requirements
C.2.6.1 Security Classification Specification
The contractor shall adhere to the requirements of the Program Executive Officer Combat Support and Combat Service Support (PEO CS&CSS)
Security Classification Guide (SCG) (Attachment 0005) for the protection of the unclassified information, or Controlled Unclassified
Information (CUI), data, hardware, and software generated for or provided in support of the program. To preserve national security interest, the contractor shall ensure all aspects of the contract and work performed are evaluated for conformance with security procedures and standards. The contractor shall evaluate all products for security implications and prepare appropriate security documents and plans.
C.2.6.1.1 Non-Disclosure
DFARS clause 252.204.7000, non-disclosure of information prohibits release of unclassified information to the public without approval of the contracting activity. The clause shall also be made applicable to subcontractors.
C.2.6.2 Classification or Marking
10 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The highest classification or marking associated with this contract is CUI. The contractor shall ensure all personnel meet clearance and access requirements and maintain that clearance during this contract in accordance with Army Regulation AR 25-2 or AR 380-67.
C.2.6.3 When receiving, generating, and/or handling CUI, the contractor shall adhere to the PEO CS&CSS SCG (Attachment 0005), and the PM
CS&CSS OPSEC Plan (Attachment 0006).
C.2.6.4 Controlled Unclassified Information (CUI)
CUI is unclassified information requiring application of access, distribution controls, and protective measures which meets the standards for safeguarding and dissemination controls pursuant to statute, and government-wide policies under Executive Order (EO)
13556. When handling or creating CUI information or documents, the contractor shall adhere to the following guidelines:
a. DoD Instruction 5200.48 Controlled Unclassified Information (CUI) https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF
b. NIST 800-171 Rev 2 Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-171r2.pdf
c. In the case of historical documents containing U//FOUO information, use DoDM 5200.01 vol 1-4, Army Regulation (AR) 25-55, AR 380-5, AR 25-2, and AR 25-1 for handling and protecting.
C.2.6.5 Distribution Statements
Marking of Technical Data, Computer Software, and Related Material will include the statement provided in the Attachment 0005, PEO
CS&CSS SCG. If the contents of the technical document require more than one Distribution Statement, apply the most restrictive statement. This does not preclude additional mandated markings as may be required by the contract. Other requests related to the
Security Classification Guide shall be referred to SFAE-CSS-TS/Security, 6501 E. 11 Mile Road, MS 640, Detroit Arsenal, MI 48397- 5000, COM (586) 239-3491.
C.2.6.6 The contractor shall not transmit any CUI information electronically over the Internet unless it is encrypted by Federal
Information Processing Standard (FIPS) 140-2 standard encryption. In order to enable e-mail encryption the contractor shall have a CAC or obtain External Certification Authority (ECA) Certificates or Federated Bridge Certificates. Details on the ECA program and authorized ECA vendors can be found at: http://iase.disa.mil/pki/eca/ and details on the Federated bridge program can be found at: http://iase.disa.mil/pki-pke/interoperability/Pages/index.aspx .
C.2.6.7 Manage Security
The contractor shall manage security activities at the unclassified, CUI, and all applicable classification levels encompassing all security disciplines (Information Security, Operations Security, Anti-Terrorism and Force Protection, International Security, Physical
Security, Information Systems Security, and Personnel Security). This requirement is to utilize the above security functions to protect the programs information and technology.
C.2.6.8 OPSEC Standard Operating Procedure or Plan
The contractor shall follow the PM CS&CSS OPSEC Plan (Attachment 0006), dated 27 February 2017, as well as annexes and updates. The contractor is not required to develop their own OPSEC Plan. All U.S. contractors shall provide annual Program specific OPSEC training for all Program personnel. New Program personnel shall receive PM CS&CSS OPSEC Plan specific training within 30 days of Program assignment. These requirements, OPSEC Plan and training, shall be flowed down to all U.S. subcontractors with access to CUI or material.
C.2.6.9 OPSEC
If the contractor generates unclassified OPSEC sensitive information, this information will be protected at the same level as CUI. The contractor shall be responsible for the development of an OPSEC program, in accordance with DoDM 5205.02-M and AR 530-1, with specific features based on command or unit approved OPSEC requirements.
Because of antiterrorism/force protection, operations security, and counterintelligence concerns, the contractor shall not release any diagrams, maps, floor plans, schematics, or digital pictures of any DoD owned installations to outside organizations or companies without the approval of the Contracting Officer and G2-TACOM. All information proposed for public release in any form (video, pictures, article, brochure, web site, etc.) will undergo a Program Executive Office (PEO) Combat Support and Combat Service Support (CS&CSS)
OPSEC Review using the most current and approved PEO CS&CSS STA Form 7114.
Examples of information that would be considered OPSEC sensitive: Equipment capabilities, limitations, and vulnerabilities; Detailed mission statements; Operation schedules; Readiness and vulnerability assessments; Test locations and dates; Inventory charts and reports; Detailed budget data; Photographs of components; Detailed organizational charts (with phones and e-mail listings); Technical and scientific data; Unclassified technical data with military applications; Critical maintenance information; Information extracted from a DOD Intranet web site; Lessons learned that could reveal sensitive military operations, exercises, or vulnerabilities; Logistics support (munitions, weapons, movement); Specific real time support to current or on-going military operations; Delivery schedules; and
Manufacturing methods.
C.2.6.10 Protection and Disclosure of Government Information Public Release Requests
Except for information previously approved for public release by the Government, the Contractor shall not release any information regarding the work performed under this contract outside (i) the United States Government, (ii) its own facility, (iii) its subcontractors performing work at any tier, (iv) Associate Contractors, at any tier, and (v) any other individual or entity that is not
11 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
contractually bound to protect Information from public release without first obtaining approval for Public Release. Refer to the PM
CS&CSS SCG (Attachment 0005) (Page 10, #13 Release of Information) on public release of information for additional guidance.
The contractor shall screen all information submitted for determination of public release to ensure it is both unclassified and technically accurate. A letter of transmittal must certify the review. Program information shall not be released outside program channels in accordance with Distribution Statements until the review process is complete. PM CS&CSS information is any Program information on the CATV effort. Refer to the PM CS&CSS SCG (Attachment 0005) on public release of information for additional guidance.
All requests shall be submitted through the PCO for adjudication. The program requires 45 working days to process the request and render a decision.
The Contractor shall submit all requests for public release approval through the PCO for review by a Government technical and Security personnel, culminating in a determination by the Government Public Affairs Officer (PAO) in accordance with DFARS Clause 252.204-7000.
The PAO will, after appropriate review, either authorize or reject the request to disseminate Government information publicly. Note that authorization may be given contingent on specified changes being made to the material for which public release has been requested.
Requests for public release shall be sent electronically via encrypted email using cryptographic products that are National Institute for Standards and Technology/National Information Assurance Partnership (NIST/NIAP) approved or mail the Compact Disc/Digital Video Disc
(CD/DVD) using U.S. Postal Service Registered Mail.
C.2.6.11 Marketing Proposals and Export Considerations
The contractor shall notify the Government program office staff and counterintelligence support staff, all proposals to market or otherwise obtain a commercial export license to sell the system being acquired.
C.2.6.12 Information Flow Down
The contractor shall ensure the security requirements and guidelines contained in section C.2.6, the program Operations Security (OPSEC)
Requirements (C.2.6.9), CUI instruction (C.2.6.4), and export control safeguards (C.2.6.11) are contractually flowed down to subcontractors, teammates and consultants.
C.2.6.13 The contractor shall insert the substance of clause FAR 52.204-9, including this paragraph, in all subcontracts when the
Subcontractors employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a
Federally-controlled information system. It shall be the responsibility of the prime contractor to return such identification to the issuing agency unless otherwise approved in writing by the contracting officer.
C.2.6.14 Mission Critical Levels
Adapting the MIL-STD-882 System Safety Program definitions of criticality to mission criticality, the contractor shall adopt the following criticality levels:
- Level I (Catastrophic) protection failure that results in total compromise of mission capability;
- Level II (Critical) protection failure that results in unacceptable compromise of mission capability or significant mission degradation;
- Level III (Marginal) protection failure that results in partial compromise of mission capability or partial mission degradation;
- Level IV (Negligible) protection failure that results in little or no compromise of mission capability.
C.3 Meetings, Assessments, and Reviews
C.3.1 Participation and Administration
Unless otherwise specified in the paragraphs below, all meetings, audits, assessments, and reviews shall be hosted by the contractor.
The contractor's hosting duties and responsibilities shall consist of all functions related to the preparation and execution of the meetings, audits, assessments, and reviews to include providing facility, sending invitations, media resources, security, minutes, and hard copy materials.
C.3.1.1 Agenda and Read-Ahead Packages
The contractor shall develop an agenda for all meetings and reviews required in this contract in accordance with CDRL A001, Agenda, Read-
Ahead, and Minutes. If a meeting, audit, assessment, or review is listed in the IMP as an event, the agenda for that event shall, at a minimum, address the information necessary to accomplish the exit criteria in the IMP.
C.3.1.2 Invitations
The contractor shall send electronic invitations for all contractor-led meetings, audits, assessments, and reviews identified in this contract not less than 10 business days prior to the event. Government participants for these events will be identified by Product
Manager Multi-Mission Protected Vehicle Systems (PdM MPVS). Invitations are not required for daily meetings.
C.3.1.3 Minutes
The contractor shall record and provide minutes for all meetings, audits, assessments, and reviews in section C.3 and otherwise called out in this contract. The contractor's recorder shall be identified at the beginning of each event. The contractor shall deliver meeting
12 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
minutes in accordance with CDRL A001, Agenda, Read Ahead, and Minutes.
C.3.2 Start of Work Meeting (SOWM)
The contractor shall conduct a SOWM within 30 business days after Contract Award. The contractor shall conduct the SOWM at the contractors facility unless specified otherwise. At the SOWM, the contractor shall identify to the Government how they will manage all design, integration, fabrication, supportability, and risk throughout the production phase. The SOWM will also include a SOW, CDRL, IMP
(reference C.2.1) and IMS (reference C.2.2) review.
The contractor shall also brief the following strategies and plans during the SOWM:
a. Manufacturing Development Strategy (reference C.4.3)
b. IPS Management Plan (C.8.1.1)
c. LPD Plan (C.8.2.1)
d. Maintenance Support Plan (C.8.2.2.1)
e. Provisioning Plan (C.8.3.1)
f. Manufacturers Manual Plan (C.8.8.6)
g. Training Program Development and Management Plan (C.8.9)
h. Care and Storage Plan (E.2.11.1)
The SOWM will also incorporate the Preliminary Design Review (PDR) referenced in C.3.2.1, Pre-Test Readiness Review referenced in
C.3.3.1, the Logistics Start of Work Meeting (LSOWM) referenced in C.3.4.1, to include the Technical Publications Guidance Conference
(reference C.3.4.2), Post-Award Cost Reporting Conference C.3.6 -if required by CSDR) and the first Logistics IPT (reference C.8.1 IPS
Program Mgmt). For planning purposes, the SOWM meeting is anticipated to be up to a five-day event.
C.3.2.1 Preliminary Design Review (PDR)
The contractor shall host a PDR at the SOWM. The purpose of the design review is to assess design maturity and evaluate risks and address FACARs from Phase I and II testing as well as any requirements not demonstrated during Phase I and II testing. The contractor shall present the following: their proposed baseline configuration design, all design changes expected to be incorporated in the product baseline from the prototype configuration, a detailed description of how the production vehicle will meet the requirements in the
Attachment 0001, CATV Performance Specification, meet all entrance and exit criteria (detailed in the PDR Checklist (Attachment 0007 PDR
Checklist) identified by the Government for this review. This meeting serves as the decision point for the Government to allow the contractor to begin final design of the CATV upon approval of the PDR. The PDR shall be determined to be complete by the Government
Technical Review Chair.
C.3.2.2 Final Design Review (FDR)
The contractor shall host a FDR 20 business days prior to start of production. The purpose of the design review is to formalize the product baseline, assess design maturity and evaluate risks. The contractor shall present the following: their baseline configuration design, all design changes incorporated in the product baseline from the prototype configuration, a detailed description of how the production vehicle meets the requirements in the Attachment 0001, CATV Performance Specification, meet all entrance and exit criteria
(detailed in the FDR Checklist (Attachment 0008 FDR Checklist) identified by the Government for this review. This meeting serves as the decision point for the Government to allow the contractor to begin production of the CATV upon approval of the FDR. The FDR will also include a Production Readiness Review. The FDR shall be determined to be complete by the Government Technical Review Chair. For planning purposes the FDR is anticipated to be up to a two-day event.
C.3.3 Test Reviews
C.3.3.1 Pre-Test Readiness Review(s) (Pre-TRR)
The Contractor shall conduct a Pre-test Readiness Review (Pre-TRR) to present to the Government the readiness of the…