Attachment 0021 - CATV User Evaluation Plan and Soldier Survey.pdf

PDF 243 KB Posted

Attached to
Cold Weather All-Terrain Vehicle (CATV) - Solicitation
Solicitation number
W56HZV21R0185
Issued by

About this file

This document outlines plans for a Cold Weather All-Terrain Vehicle (CATV) operational evaluation and soldier survey. The evaluation will take place over three weeks at the Cold Regions Test Center in Fort Greeley, Alaska to collect soldier feedback on prototype vehicles from vendors. Soldiers will operate the prototype CATVs and legacy vehicles on simulated missions over varying terrain and weather conditions. The evaluation will assess categories including crew accommodations, mobility, mission readiness, operational effectiveness, transportability, and maintainability. Soldiers will complete a survey rating effectiveness on various metrics using a scale of very effective to very ineffective. The related federal contract opportunity is a solicitation for a follow-on CATV production contract under 10 U.S.C. 2371b. The Army seeks a single-award, firm-fixed-price requirements contract over seven potential years for production units, spare parts, and contractor logistics support.

View the file

Other files

File Type Posted
W56HZV21R0185_Conformed Copy 24 MAR 2022.pdf PDF
W56HZV21R0185-0004.pdf PDF
W56HZV21R0185-0005.pdf PDF
W56HZV21R0185_Conformed Copy 26 MAY 2022.pdf PDF
W56HZV21R0185-0003.pdf PDF
W56HZV21R0185 Conformed 24 FEB 22.pdf PDF
W56HZV21R0185 Conformed 17 FEB 22.pdf PDF
W56HZV21R0185-0002.pdf PDF
Attachment 0034 - Assertions.xlsx XLSX spreadsheet
W56HZV21R0185 Conformed 4FEB2022.pdf PDF
W56HZV21R0185-0001 4 FEB 2022 Signed.pdf PDF
Attachment 0001 - CATV Performance Specification 1FEB2021.pdf PDF
Attachment 0030 - End Item-Specific Special Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0007 - PDR Checklist 17DEC2021.pdf PDF
Attachment 0001 - CATV Perfromance Specification 6JAN2022.pdf PDF
Attachment 0026 - Government Furnished Property (GFP).pdf PDF
Attachment 0008 - FDR Checklist 17DEC2021.pdf PDF
Attachment 0024 - Advanced Manufacturing Candidate List.xlsx XLSX spreadsheet
Attachment 0002 - Integrated Master Schedule.pdf PDF
Attachment 0019 - Provisioning Requirements Statement.pdf PDF
Attachment 0014 - TIR and FACAR Report Data.pdf PDF
Attachment 0012 - CATV Systems Specification Sheet.xlsx XLSX spreadsheet
W56HZV21R0185 CATV RFP Final Signed 14 JAN 2022.pdf PDF
Attachment 0009 - Pre-TRR Checklist.pdf PDF
Attachment 0022 - SESAME Guide.pdf PDF
Attachment 0015 - WindChill ECP Process.pdf PDF
Attachment 0028 - ARMY CDRL Module OEM Contractor Training FEB 2019.pdf PDF
Attachment 0032 - CATV Performance Specification Report.xlsx XLSX spreadsheet
Attachment 0005 - PEO CSCSS Armoring Systems SCG_2017.pdf PDF
Attachment 0020 - Data Reqmts Form for Acq Requirement Package (ARP).pdf PDF
Attachment 0029 - MPVS CDRL Module and ACE Submissions.pdf PDF
Attachment 0027 - Welding Standards.pdf PDF
Attachment 0031 Pricing Workbook Final.xlsx XLSX spreadsheet
Attachment 0006 - PEO CSCSS OPSEC Program Oct 2016 SIGNED.pdf PDF
Attachment 0017 - HMMR Template.xlsx XLSX spreadsheet
Attachment 0010 - TRR Checklist.pdf PDF
Attachment 0013 - Risk Mgt Scoring Criteria and Report Template.xlsx XLSX spreadsheet
Attachment 0003 - Applicable Documents 10 DEC 21.pdf PDF
Attachment 0016 - Request for Use of Prohibited Material.docx DOCX document
Attachment 0023 - Army Advanced Methods_Materials_and_Equipment.pdf PDF
Attachment 0011 - Transportability Data Sheet.xlsx XLSX spreadsheet
Attachment 0025 Specifically Negotiated License Agreement for Advanced Manufacturing (SNL-AM).pdf PDF
Attachment 0018 - FMECA Requirements.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 021

CATV Prototype Operational Evaluation Plan & Soldier Survey

22 DEC 2021

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; Administrative and Operational Use, date of determination is 25 February 2020. Other requests for this document shall be referred to PM TS Security Manager at: Program Executive Office Combat Support and Combat Service Support, ATTN: SFAE-CSS-TS, MS 414, 6501 East 11 Mile Rd, Warren, MI 48397-5000.

Date: 29 NOV 2021 – 17 DEC 2021

Duration: Three weeks

Location: Cold Regions Test Center; Fort Greeley, Alaska

Purpose: Conduct simulated missions with the Cold Weather All-Terrain Vehicle (CATV) prototype and the legacy Small Unit Support Vehicle (SUSV); to collect soldier feedback to inform down-select from prototype to production contract.

Safety: Safety Releases are required for Soldier involvement and operation of prototype vehicles during the User Evaluation. Personnel from the U.S. Army Cold Regions Test Center (CRTC) will review available system information, data sheets, safety analyses, and test data to prepare a Safety Release. CRTC will utilize personnel from the U.S. Army Alaska to collect data from the prototype vehicles to finalize the Safety Release. Results and observations from inspection and testing of the prototype vehicles may result in elevated residual risk and/or restrictions during the Operational Evaluation.

Operational Evaluation Topics:

• Crew Accommodations

• Mobility

• Mission Readiness

• Operational Effectiveness

• Transportability

• Maintainability

Products: CRTC will tabulate the survey data and Soldier feedback collected during the Operational Evaluation.

Operator Training – Offerors will train soldiers in the operation of the prototype vehicle.

Training will be a mix of classroom and on-vehicle events.

Maintenance: Maintenance windows will take place daily after Soldier operations.

Maintenance will be as needed but not extend more than 10 hours after Soldier operations each day.

Operational Evaluation Events

Event Details New Equipment Training

Train Soldiers to operate prototype vehicle

Operational Missions Driving and operational context missions over varying terrain and weather conditions as available.

Winch Operations Mix of controlled environment (maintenance bay) and Extreme Cold Weather (ECW) conditions. Soldiers will execute during Operational Mission. Vendors will provide block of instruction prior to Soldiers performing in an ECW environment

Tow Operations Mix of controlled environment (maintenance bay) and Extreme Cold Weather (ECW) conditions. Soldiers will execute during Operational Mission. Vendors will provide block of instruction prior to Soldiers performing in an ECW environment

Track Replacement Operations

Mix of controlled environment (maintenance bay) and Extreme Cold Weather (ECW) conditions. Vendors will provide block of instruction prior to Soldiers performing in an ECW environment.

Sling Load Operations Mix of controlled environment (maintenance bay) and Extreme Cold Weather (ECW) conditions. Vendors will provide block of instruction prior to Soldiers performing in an ECW environment

Concurrent Activities Other activities that will be performed throughout the test event to include but not limited to: Operator PMCS, configure vehicles for mission, emergency crew drills, equipment storage and load plans, etc.

Rating Scale Definitions:

Very Effective: Aspect(s) of the vehicle that has/have appreciable merit, performance, and/or capabilities that appreciably enhance(s) mission performance.

Effective: Aspect(s) of the vehicle that has/have merit, performance, and/or capabilities that enhance mission performance.

Ineffective: Aspects of the vehicle and/or flaw(s) in the vehicle that increase(s) the risk of unsuccessful mission performance.

Very Ineffective: Aspects of the vehicle and/or flaw(s) in the vehicle that appreciably increase(s) the risk of unsuccessful mission performance.

Test Participant ID Number:

Vehicle Operated (please check one):

Vendor: A B

Variant: Cargo General Purpose

Crew Accommodation

Rate the effectiveness of entering the vehicle during operations.

Very Effective Effective Ineffective Very Ineffective

Additional Comments:

Rate the effectiveness of exiting the vehicle during operations.

Very Effective Effective Ineffective Very Ineffective

Additional Comments:

Rate the effectiveness of the vehicle seating arrangement during vehicle movement.

Very Effective Effective Ineffective Very Ineffective

Additional Comments:

Rate the effectiveness of the vehicle climate control systems, crew compartment heaters, and defrosters.

Rate the ride quality of the vehicle.

Mobility

Rate the ability to maintain control (stop, speed, etc) on varying terrain.

Rate the ability of the vehicle to traverse challenging terrain (snow, rocks, mud, etc)

Rate the ability to perform winch recovery operations.

Rate the ability to perform towing operations.

Rate the ability to recover from thrown track during operations.

Mission Readiness

Rate the time it takes to get the vehicle into a mission ready configuration.

Rate your ability to safely and quickly stow all mission critical equipment on the vehicle.

Rate your ability to safely and quickly remove all the mission critical equipment on the vehicle.

Operational Effectiveness

Rate your ability to ride in the CATV without degrading your ability to dismount and conduct subsequent missions.

Rate the ability of the vehicle to operate in extreme cold weather conditions.

Rate front cab outward visibility while the vehicle is operational.

Rate rear cab outward visibility while the vehicle is operational.

Transportability

Rate the vehicle’s ability to be disassembled in preparation for sling load operations.

Rate the vehicle’s ability to be assembled after sling load operations.

Rate the overall ability to prepare the vehicle for sling load operations.

Maintainability

Rate the accessibility for periodic services and common repairs.

Rate the ease of periodic services and common repairs.

Rate the ability to use BII tools for maintenance.

Attachment 014 - CATV Operational Evaluation_Oct 2021 (002)
Attachment 0021 - CATV User Evaluations_Soldier Survey

File details come from the government source that posted it. Updated .