Attachment 0008 - FDR Checklist 17DEC2021.pdf

PDF 197 KB Posted

Attached to
Cold Weather All-Terrain Vehicle (CATV) - Solicitation
Solicitation number
W56HZV21R0185
Issued by

About this file

This document outlines the criteria and process for a Final Design Review of a Cold Weather All-Terrain Vehicle. The review will assess the design maturity and readiness of the vehicle to enter production. Key criteria include demonstrating the design meets requirements, identification of risks, completion of testing, and establishment of production plans. The contractor must present the finalized configuration design and changes from prototype testing. The government will determine if the review is complete and approves the contractor to begin production upon a successful review.

A related federal contract opportunity involves a solicitation for a follow-on production contract of the Cold Weather All-Terrain Vehicle. The Department of the Army Materiel Command seeks to award a single firm-fixed price requirements contract for five one-year ordering periods plus two optional one-year extensions. The contract will include production units, spare parts, and contractor logistics support with a total potential term of seven years.

View the file

Other files

File Type Posted
W56HZV21R0185_Conformed Copy 24 MAR 2022.pdf PDF
W56HZV21R0185-0004.pdf PDF
W56HZV21R0185-0005.pdf PDF
W56HZV21R0185_Conformed Copy 26 MAY 2022.pdf PDF
W56HZV21R0185-0003.pdf PDF
W56HZV21R0185 Conformed 24 FEB 22.pdf PDF
W56HZV21R0185 Conformed 17 FEB 22.pdf PDF
W56HZV21R0185-0002.pdf PDF
Attachment 0034 - Assertions.xlsx XLSX spreadsheet
W56HZV21R0185 Conformed 4FEB2022.pdf PDF
W56HZV21R0185-0001 4 FEB 2022 Signed.pdf PDF
Attachment 0001 - CATV Performance Specification 1FEB2021.pdf PDF
Attachment 0030 - End Item-Specific Special Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0007 - PDR Checklist 17DEC2021.pdf PDF
Attachment 0001 - CATV Perfromance Specification 6JAN2022.pdf PDF
Attachment 0026 - Government Furnished Property (GFP).pdf PDF
Attachment 0024 - Advanced Manufacturing Candidate List.xlsx XLSX spreadsheet
Attachment 0002 - Integrated Master Schedule.pdf PDF
Attachment 0019 - Provisioning Requirements Statement.pdf PDF
Attachment 0014 - TIR and FACAR Report Data.pdf PDF
Attachment 0012 - CATV Systems Specification Sheet.xlsx XLSX spreadsheet
W56HZV21R0185 CATV RFP Final Signed 14 JAN 2022.pdf PDF
Attachment 0009 - Pre-TRR Checklist.pdf PDF
Attachment 0022 - SESAME Guide.pdf PDF
Attachment 0015 - WindChill ECP Process.pdf PDF
Attachment 0028 - ARMY CDRL Module OEM Contractor Training FEB 2019.pdf PDF
Attachment 0032 - CATV Performance Specification Report.xlsx XLSX spreadsheet
Attachment 0005 - PEO CSCSS Armoring Systems SCG_2017.pdf PDF
Attachment 0020 - Data Reqmts Form for Acq Requirement Package (ARP).pdf PDF
Attachment 0029 - MPVS CDRL Module and ACE Submissions.pdf PDF
Attachment 0021 - CATV User Evaluation Plan and Soldier Survey.pdf PDF
Attachment 0027 - Welding Standards.pdf PDF
Attachment 0031 Pricing Workbook Final.xlsx XLSX spreadsheet
Attachment 0006 - PEO CSCSS OPSEC Program Oct 2016 SIGNED.pdf PDF
Attachment 0017 - HMMR Template.xlsx XLSX spreadsheet
Attachment 0010 - TRR Checklist.pdf PDF
Attachment 0013 - Risk Mgt Scoring Criteria and Report Template.xlsx XLSX spreadsheet
Attachment 0003 - Applicable Documents 10 DEC 21.pdf PDF
Attachment 0016 - Request for Use of Prohibited Material.docx DOCX document
Attachment 0023 - Army Advanced Methods_Materials_and_Equipment.pdf PDF
Attachment 0011 - Transportability Data Sheet.xlsx XLSX spreadsheet
Attachment 0025 Specifically Negotiated License Agreement for Advanced Manufacturing (SNL-AM).pdf PDF
Attachment 0018 - FMECA Requirements.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Attachment 0008

Final Design Review (FDR) Checklist

Distribution Statement A – Approved for Public Release; distribution unlimited

1 PURPOSE

The purpose of the Final Design Review (FDR) is to formalize the product baseline, assess design maturity and evaluate risks. The FDR demonstrates that the system design is complete and ready for manufacturing. The contractor shall present the following:

• Their baseline configuration design

• All design changes incorporated in the product baseline from the production ready prototype configuration

• A detailed description of how the production vehicle meets the requirements in the Attachment 0001, CATV Performance Specification (P-spec), The FDR will also include a Production Readiness Review (C.3.2.2.).

1.1 COMPLETION OF CHECKLIST

This meeting serves as the decision point for the Government to allow the contractor to begin production of the CATV upon approval of the FDR.

The FDR shall be determined to be complete by the Government Technical Review Chair.

The FDR Exit Criteria Checklist will be considered completed when the items in the Checklist have been satisfactorily completed, key issues addressed, and there are no unresolved items.

UNCLASSIFIED Page 3 of 6

Criteria Status Comment/Mitigation 1 Introductions/Purpose

1.1 Review purpose

2 Entrance Criteria

2.1 Action Items from prior technical reviews have been closed.

2.2 Contractor has been provided the necessary Government Furnished

Information

2.3 Contractor SEMP is complete

2.4 Final Design baseline is complete

2.5 Threat assessment complete

2.6 System Security Plan (SSP) approved

2.7 Product specifications and production drawings are complete

2.8 Phase 3 testing complete

2.9 Logistic/support plans updated

2.10 A level of repair analysis has been completed and the results documented

NA

NA

NA

NA

2.15 Testability requirements -BIT, false alarm rate, fault isolation, fault detection

- have been incorporated into the detailed SW and HW design

2.16 Hazardous material management and pollution prevention processes and procedures are verified and baselined

2.17 Program Management Office Approves Proceeding

2.18 Participant List is Identified

3 Program Management

3.1 Is the program schedule executable (technical/cost risks)?

3.2 Is the program properly staffed?

3.3 Has the program's cost estimate been updated?

3.4 Is the program executable within the existing budget and with the approved system allocated baseline?

3.5 Can the risks associated with ESOH hazards be mitigated to an acceptable risk level within the existing budget?

3.6 Are adequate processes and metrics in place for the program to succeed?

UNCLASSIFIED Page 4 of 6

4 Design

4.1 Can the design, as disclosed, satisfy the P-spec? REF: Performance

Specification Report CDRL C007

4.2 Are the risks known and manageable to begin producing vehicles for the Government?

4.3 Has the system allocated baseline been established and documented to enable detailed design to proceed with proper configuration management?

4.4 Have sustainment and human integration design factors been reviewed and included, where needed, in the overall system design?

5 Production

5.1 Is the system level design producible within the production budget?

5.2 Have all the, CATV unique, manufacturing processes been defined and characterized?

5.3 Are initial manufacturing approaches documented?

5.4 Have long-lead and key supply chain elements been identified?

5.5 Has a production cost model been constructed?

5.6 Can the industrial base support production?

5.7 Have producibility assessments of key technologies been completed?

6 Exit Criteria

6.1 Testing, demonstration, analysis or Modeling and Simulation indicates the vehicle will be operationally effective and suitable

6.2 Design (hardware and software) including interface descriptions completed, as disclosed, satisfy the CDD

6.3 Design of the Cybersecurity requirements completed and satisfies system and operational requirements

6.4 System product baseline is established and documented to enable hardware fabrication and software coding to proceed with proper configuration management

6.5 Design satisfies sustainment and Human Systems Integration requirements

6.6 Adequate processes and metrics in place for the program to succeed

6.7 The risks known are manageable to begin producing vehicles for the

Government.

6.8 The program schedule is executable

UNCLASSIFIED Page 5 of 6

6.9 The program is executable within the existing budget and with the approved system product baseline

6.10 The detailed design is producible within the production budget and schedule.

6.11 All critical Safety Items and Critical Application Items are identified

6.12 The updated cost estimate fits within the existing budget

6.13 The software functionality in the approved product baseline is consistent with the updated software metrics and resource-loaded schedule

6.14 The critical manufacturing processes that affect the key characteristics are identified and their capabilities to meet design tolerances are determined

6.15 Process control plans are developed for critical manufacturing processes

6.16 Manufacturing processes are demonstrated in a production representative environment

6.17 Materials and tooling are available to meet production schedule

6.18 Long lead procurement plans are in place and the supply chain assessment is complete

6.19 The ESOH residual risks are known and manageable

6.20 Action Items Documented with Agreed to Suspense Dates

6.21 Chair and Program Management Office Approve Closure

Chair and Program Management Office Approve Closure

A CDRL Submissions Required C001 Integrated Master Plan C002 Integrated Master Schedule (IMS) C003 System Level Design Document (SLDD) C004 System Engineering Management Plan (SEMP) C005 Bill of Materials C006 Transportability Report C007 Performance Specification Report C008 System Specification Sheet

UNCLASSIFIED Page 6 of 6

C009 RAM Management Program C010 Risk Tracking Report

C011 FACAR

C015 Product Baseline Index (PBLI) C016 Routing Diagrams-Cabling, Wiring Harnesses and Plumbing C017 Configuration Status Accounting Information (CSAI) C020 Request for Variance C022 Environmental, Safety, and Occupational Health (ESOH) Program Plan C023 Safety Assessment Report (SAR) C024 Hazardous Materials Management Report (HMMR) C025 Corrosion Prevention and Control Plan (CPCP) and Finish Specification

Report C026 TDP Contractor C028 Logistics Product Data Summary

C029 FMECA

C030 Level of Repair Analysis C031 Engineering Data for Provisioning C032 IUID Candidate List C035 Special Packaging Instructions C036 Equipment Preservation Data Sheet C037 Special Tool Kits C038 Technical Publications Supplemental C039 Technical Publications Schedule and Status Report C040 Training Program Development Schedule and Status Report C041 Training Support Package C043 SAIP Initial Spares

1 Purpose
1.1 Completion of Checklist