This document contains a test incident report and failure analysis corrective action report data template as well as details of a federal solicitation for a Cold Weather All-Terrain Vehicle.

The test incident report template provides instructions for completing sections regarding corrective action status, entry and review dates, and narratives describing the developer's analysis, corrective action status and description, test results, and planned production implementation. The failure analysis corrective action report process flowchart outlines the steps from contractor submission or resubmission of a report through closure.

The federal solicitation seeks a single-award firm fixed price requirements contract for seven potential years for production units, spare parts, and contractor logistics support of an articulated tracked cold weather all-terrain vehicle capable of amphibious operations in Arctic environments down to -50 degrees Fahrenheit and sling load transportable. The Department of the Army Materiel Command TACOM Life Cycle Management Command will make the award under a follow-on production contract resulting from a successful prototype.

View the file

Other files

File Type Posted
W56HZV21R0185_Conformed Copy 24 MAR 2022.pdf PDF
W56HZV21R0185-0004.pdf PDF
W56HZV21R0185-0005.pdf PDF
W56HZV21R0185_Conformed Copy 26 MAY 2022.pdf PDF
W56HZV21R0185-0003.pdf PDF
W56HZV21R0185 Conformed 24 FEB 22.pdf PDF
W56HZV21R0185 Conformed 17 FEB 22.pdf PDF
W56HZV21R0185-0002.pdf PDF
Attachment 0034 - Assertions.xlsx XLSX spreadsheet
W56HZV21R0185 Conformed 4FEB2022.pdf PDF
W56HZV21R0185-0001 4 FEB 2022 Signed.pdf PDF
Attachment 0001 - CATV Performance Specification 1FEB2021.pdf PDF
Attachment 0030 - End Item-Specific Special Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0007 - PDR Checklist 17DEC2021.pdf PDF
Attachment 0001 - CATV Perfromance Specification 6JAN2022.pdf PDF
Attachment 0026 - Government Furnished Property (GFP).pdf PDF
Attachment 0008 - FDR Checklist 17DEC2021.pdf PDF
Attachment 0024 - Advanced Manufacturing Candidate List.xlsx XLSX spreadsheet
Attachment 0002 - Integrated Master Schedule.pdf PDF
Attachment 0019 - Provisioning Requirements Statement.pdf PDF
Attachment 0012 - CATV Systems Specification Sheet.xlsx XLSX spreadsheet
W56HZV21R0185 CATV RFP Final Signed 14 JAN 2022.pdf PDF
Attachment 0009 - Pre-TRR Checklist.pdf PDF
Attachment 0022 - SESAME Guide.pdf PDF
Attachment 0015 - WindChill ECP Process.pdf PDF
Attachment 0028 - ARMY CDRL Module OEM Contractor Training FEB 2019.pdf PDF
Attachment 0032 - CATV Performance Specification Report.xlsx XLSX spreadsheet
Attachment 0005 - PEO CSCSS Armoring Systems SCG_2017.pdf PDF
Attachment 0020 - Data Reqmts Form for Acq Requirement Package (ARP).pdf PDF
Attachment 0029 - MPVS CDRL Module and ACE Submissions.pdf PDF
Attachment 0021 - CATV User Evaluation Plan and Soldier Survey.pdf PDF
Attachment 0027 - Welding Standards.pdf PDF
Attachment 0031 Pricing Workbook Final.xlsx XLSX spreadsheet
Attachment 0006 - PEO CSCSS OPSEC Program Oct 2016 SIGNED.pdf PDF
Attachment 0017 - HMMR Template.xlsx XLSX spreadsheet
Attachment 0010 - TRR Checklist.pdf PDF
Attachment 0013 - Risk Mgt Scoring Criteria and Report Template.xlsx XLSX spreadsheet
Attachment 0003 - Applicable Documents 10 DEC 21.pdf PDF
Attachment 0016 - Request for Use of Prohibited Material.docx DOCX document
Attachment 0023 - Army Advanced Methods_Materials_and_Equipment.pdf PDF
Attachment 0011 - Transportability Data Sheet.xlsx XLSX spreadsheet
Attachment 0025 Specifically Negotiated License Agreement for Advanced Manufacturing (SNL-AM).pdf PDF
Attachment 0018 - FMECA Requirements.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Test Incident Report and Failure

Analysis and Corrective Action

Report Data

30 May 2003

V–12. Completion of section VI of a Test Incident Report

Specific instructions follow for completing blocks 100 through 109 of the TIR. Data stream examples are at figure V–4.

BLOCK 100. CA Status: (cols. 7–16, X(10) max)

Enter: OPEN, PROPOSED, VERIFIED, REVIEWED, COMPLETED, INCOMPLETE, or NOT REQD to indicate the status of the corrective action. This is a “MUST FILL” block.

BLOCK 101. CA Entry Date: (cols. 33–52, X(20) max)

Enter the date (in DD MMM YYYY format) that the CA data are released for submittal. If the CA data are revised, the entry date changes with each new release and submission. A revision number is assigned for each revision. This is a “MUST FILL” block. Example follows:

Original CA data: 04 OCT 2000 Revised CA data: 06 OCT 1993 REV# 01

BLOCK 102. CA Date Reviewed: (cols. 59–69, X(11) max) Enter the date (in DD MMM YYYY format) that the corrective action review team reviewed the CA and verified it as appropriate and effective. Review may be by correspondence or electronic media (telephone, teleconference, e-mail, facsimile). This date is entered when complete concurrence has been obtained (to include resolution of elevated issues).

If review was by correspondence or electronic media, then use the date when final coordination was achieved. block 100 would be annotated REVIEWED. This is a “MUST FILL” block if the CA review team verifies the CA.

BLOCK 103. CA Date Proposed: (cols. 7–17, X(11) max)

Enter the date (in DD MMM YYYY format) that the program manager submits a potentially acceptable CA. Once entered, it will not change unless an error was made. Block 100 would be annotated PROPOSED. This is a “MUST FILL” block if a CA is proposed.

BLOCK 104. CA Date Verified: (cols. 33–43, X(11) max)

Enter the date (in DD MMM YYYY format) that test or analysis verified the CA as adequate. Block 100 would be annotated VERIFIED. This is a “MUST FILL” lock when the CA action is verified as adequate.

BLOCK 105. CA Date Completed: (cols. 59–69, X(11) max)

Enter the date (in DD MMM YYYY format) that the CA was approved for production and no further actions are required. This block is not a required entry for a CA Status of NOT REQD. This is a “MUST FILL” block if block 100 contains COMPLETED.

BLOCKS 106 to 109. (cols. 2–77, X(76) max)

Space is provided for entering four different types of narratives that pertain to the corrective action. The four narrative types, together with their respective block numbers, are as follows:

106. Developer’s Analysis of Problem.

107. Status/Description of Corrective Action.

108. Test Results on Corrective Action.

109. Planned Production Implementation.

Enter the block number and the title for the type of narrative that is being addressed; then prepare and enter the narrative. The use of upper-case and lower-case letters is permitted and encouraged. Use complete sentences and proper paragraph structuring, numbering, and indentation. Enter table headings and values as required to amplify the narrative.

Use footnotes, if applicable. If desired, skip lines to separate paragraphs, space tables and table headings, and isolate footnotes.

Use as many lines as are necessary for each narrative type. Complete one narrative and add a line of dashes before beginning another narrative. Complete the narrative before continuing on to another block. Keep the narratives in order by block number. Each of the narratives is “MUST FILL” blocks.

Limit the narratives to the corrective action and related incident reports. Reference any hard-copy reports; sketches, photographs, or correspondence containing classified information that is being distributed separately. Do not include any classified information in the narratives or, for that matter, in any other blocks.

Revise or update the narratives as more information becomes available. Identify revised information with the heading on a separate line: “Revision” and the date of the revision. All original narrative data are retained during corrective action revision to ensure data integrity. Revisions may add data or change erroneous data by citing the old and adding the correction.

Figure V–4 (PAGE 1). TIR Corrective Action data stream

340 DA PAM 73–1 • 30 May 2003

Figure V–4 (PAGE 2). TIR Corrective Action data stream—Continued

341DA PAM 73–1 • 30 May 2003

Hardware Requires Change

Contractor Submits or Resubmits

FACAR

Contractor Receives TIR

Generalized FACAR Process

Yes

FACAR Emailed to PM FMTV

TIR

Requires Contractor Response?

No

Yes

Yes

Yes

FACAR

Requires

Additional Data

No

No

Action Complete

Govt.

Notifies

Contractor FACAR Closed

FACAR

Requires

Additional Data or Verificatio

TWAD Process

Test Vehicle Updated

Test Data Generated

No

Action Complete FACAR Sent to VDLS

FACAR

Presented to

CARB