This document contains a Preliminary Design Review checklist for a Cold Weather All-Terrain Vehicle procurement. The checklist outlines criteria for assessing the maturity of transition products and ensuring the vehicle design will meet requirements. Key items include demonstrating the proposed baseline design can satisfy specifications, identifying design risks and establishing the system baseline. The contractor must also show the design considers sustainment, producibility, supportability, training and that identified risks are manageable. Accompanying the checklist are attachments outlining required contract data deliverables.

A related federal contract opportunity posting seeks proposals for a seven-year Firm Fixed Price commercial requirements contract for production, spare parts and contractor logistics support of the Cold Weather All-Terrain Vehicle. The Department of the Army is anticipated to make a single award resulting from a successful prototype effort under 10 U.S. Code 2371b for rapid prototyping.

View the file

Other files

File Type Posted
W56HZV21R0185_Conformed Copy 24 MAR 2022.pdf PDF
W56HZV21R0185-0004.pdf PDF
W56HZV21R0185-0005.pdf PDF
W56HZV21R0185_Conformed Copy 26 MAY 2022.pdf PDF
W56HZV21R0185-0003.pdf PDF
W56HZV21R0185 Conformed 24 FEB 22.pdf PDF
W56HZV21R0185 Conformed 17 FEB 22.pdf PDF
W56HZV21R0185-0002.pdf PDF
Attachment 0034 - Assertions.xlsx XLSX spreadsheet
W56HZV21R0185 Conformed 4FEB2022.pdf PDF
W56HZV21R0185-0001 4 FEB 2022 Signed.pdf PDF
Attachment 0001 - CATV Performance Specification 1FEB2021.pdf PDF
Attachment 0030 - End Item-Specific Special Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0001 - CATV Perfromance Specification 6JAN2022.pdf PDF
Attachment 0026 - Government Furnished Property (GFP).pdf PDF
Attachment 0008 - FDR Checklist 17DEC2021.pdf PDF
Attachment 0024 - Advanced Manufacturing Candidate List.xlsx XLSX spreadsheet
Attachment 0002 - Integrated Master Schedule.pdf PDF
Attachment 0019 - Provisioning Requirements Statement.pdf PDF
Attachment 0014 - TIR and FACAR Report Data.pdf PDF
Attachment 0012 - CATV Systems Specification Sheet.xlsx XLSX spreadsheet
W56HZV21R0185 CATV RFP Final Signed 14 JAN 2022.pdf PDF
Attachment 0009 - Pre-TRR Checklist.pdf PDF
Attachment 0022 - SESAME Guide.pdf PDF
Attachment 0015 - WindChill ECP Process.pdf PDF
Attachment 0028 - ARMY CDRL Module OEM Contractor Training FEB 2019.pdf PDF
Attachment 0032 - CATV Performance Specification Report.xlsx XLSX spreadsheet
Attachment 0005 - PEO CSCSS Armoring Systems SCG_2017.pdf PDF
Attachment 0020 - Data Reqmts Form for Acq Requirement Package (ARP).pdf PDF
Attachment 0029 - MPVS CDRL Module and ACE Submissions.pdf PDF
Attachment 0021 - CATV User Evaluation Plan and Soldier Survey.pdf PDF
Attachment 0027 - Welding Standards.pdf PDF
Attachment 0031 Pricing Workbook Final.xlsx XLSX spreadsheet
Attachment 0006 - PEO CSCSS OPSEC Program Oct 2016 SIGNED.pdf PDF
Attachment 0017 - HMMR Template.xlsx XLSX spreadsheet
Attachment 0010 - TRR Checklist.pdf PDF
Attachment 0013 - Risk Mgt Scoring Criteria and Report Template.xlsx XLSX spreadsheet
Attachment 0003 - Applicable Documents 10 DEC 21.pdf PDF
Attachment 0016 - Request for Use of Prohibited Material.docx DOCX document
Attachment 0023 - Army Advanced Methods_Materials_and_Equipment.pdf PDF
Attachment 0011 - Transportability Data Sheet.xlsx XLSX spreadsheet
Attachment 0025 Specifically Negotiated License Agreement for Advanced Manufacturing (SNL-AM).pdf PDF
Attachment 0018 - FMECA Requirements.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Attachment 0007

Preliminary Design Review (PDR) Checklist

Distribution Statement A – Approved for Public Release; distribution unlimited

1 PURPOSE

A Preliminary Design Review assesses the maturity of the transition products. This review is to ensure that project team has confidence that the vehicle is on track to meet the key requirements, and the relevance and traceability to the Capability Development Document (CDD) is understood and documented, and the transition products are clearly understood and progressing to meet the customers expectations.. The contractor shall present the following:

• Their proposed baseline configuration design

• Summary of phase 1 and 2 FACARS

• All design changes expected to be incorporated in the product baseline from the prototype configuration

• A detailed description of how the production vehicle will meet the requirements in the Attachment 0001, CATV Performance Specification (P-spec),

1.1 COMPLETION OF CHECKLIST

The PDR shall be determined to be complete by the Government Technical Review Chair.

The PDR Exit Criteria Checklist will be considered completed when the items in the Checklist have been satisfactorily completed, key issues addressed, and there are no unresolved items.

UNCLASSIFIED Page 3 of 6

Criteria Status Comment/Mitigation 1 Introductions/Purpose

1.1 Review purpose

2 Entrance Criteria

2.1 Action Items from prior technical reviews have been closed.

2.2 Contractor has been provided the necessary Government Furnished

Information

2.3 Contractor SEMP is started

2.4 Final Design baseline is proposed

2.5 Threat assessment started

2.6 System Security Plan (SSP) started

2.7 Product specifications are complete

2.8 Phase 3 test plans finalized

2.9 Logistic/support plans started

2.10 A level of repair analysis has been started

2.11 Logistics (sustainment) and training systems planning the documentation are started

NA

NA

NA

2.15 Testability requirements -BIT, false alarm rate, fault isolation, fault detection

- have been communicated to the Government.

2.16 Hazardous material management and pollution prevention processes and procedures are proposed

2.17 Program Management Office Approves Proceeding

2.18 Participant List is Identified

3 Program Management

3.1 Is the program schedule executable (technical/cost risks)?

3.2 Is the program properly staffed?

3.3 Has the program's cost estimate been updated?

3.4 Is the program executable within the existing budget and with the approved system allocated baseline?

3.5 Can the risks associated with ESOH hazards be mitigated to an acceptable risk level within the existing budget?

UNCLASSIFIED Page 4 of 6

3.6 Are adequate processes and metrics in place for the program to succeed?

4 Design

4.1 Can the proposed baseline design, as disclosed, satisfy the P-spec? REF:

Performance Specification Report CDRL C007

4.2 Are the design risks identified?

4.3 Has the system allocated baseline been established and documented to enable detailed design to proceed with proper configuration management?

4.4 Have sustainment and human integration design factors been reviewed and included, where needed, in the overall system design?

5 Production

5.1 Is the proposed system level design producible within the production budget?

5.2 Have the majority of the, CATV unique, manufacturing processes been identified?

5.3 Are proposed manufacturing approaches documented?

5.4 Have long-lead and key supply chain elements been identified?

5.5 Has a production cost model been constructed?

5.6 Can the industrial base support production?

5.7 Have producibility assessments of key technologies been completed?

6 Exit Criteria

6.1 Status of the technical effort and proposed design indicate the vehicle will be operationally effective and suitable

6.2 Design (hardware and software) including interface descriptions as proposed, satisfy the CDD.

6.3 Cybersecurity requirements are defined

6.4 System product baseline is proposed and documented to enable preparation of vehicles to proceed with phase 3 testing.

6.5 Proposed design satisfies sustainment and Human Systems Integration requirements

6.6 Adequate processes and metrics in place for the program to succeed

6.7 The risks known are manageable to begin phase 3 testing.

6.8 The program schedule risks are identified and mitigation is planned

6.9 The program cost risks are identified and mitigation is planned

6.10 Program design risks are identified and mitigation is planned.

UNCLASSIFIED Page 5 of 6

6.11 All critical Safety Items and Critical Application Items are identified

6.12 The updated cost estimate fits within the existing budget

6.13 The software functionality in the proposed product baseline is consistent with the updated software metrics and resource-loaded schedule

6.14 The critical manufacturing processes that affect the key characteristics are identified

6.15 NA

6.16 Manufacturing processes are demonstrated

6.17 Materials and tooling are available to update vehicles for phase 3 testing

6.18 Long lead procurement items are identified.

6.19 The ESOH residual risks are identified

6.20 Action Items Documented with Agreed to Suspense Dates

6.21 Chair and Program Management Office Approve Closure

A CDRL Submissions Required C001 Integrated Master Plan C002 Integrated Master Schedule (IMS)

NA

C004 System Level Design Document (SLDD) C005 Bill of Materials C006 Transportability Report C007 Performance Specification Report C008 System Specification Sheet C009 RAM Management Program C010 Risk Tracking Report

C011 FACAR

C014 Technical Inspection and Cost Estimate C015 Product Baseline Index (PBLI) C016 Routing Diagrams-Cabling, Wiring Harnesses and Plumbing

UNCLASSIFIED Page 6 of 6

C017 Configuration Status Accounting Information (CSAI) C020 Request for Variance C023 Safety Assessment Report (SAR) C032 IUID Candidate List C036 Equipment Preservation Data Sheet C039 Technical Publications Schedule and Status Report C040 Training Program Development Schedule and Status Report C041 Training Support Package C043 SAIP Initial Spares

1 Purpose
1.1 Completion of Checklist