This document contains a template request form for seeking approval to use prohibited materials on a federal contract for a Cold Weather All-Terrain Vehicle (CATV). The form requests information on the proposed use of prohibited materials, including explanations of the use, associated health hazards, analysis of alternative materials, technical justification, program risks if denied, and a get well plan. It also includes sections for an Environmental Safety and Occupational Health representative evaluation and recommendation, and executive concurrence and approval. If approved, the prohibited materials could be used to fulfill a requirements contract for production units, spare parts, and contractor logistics support for CATVs. The contract is valued at $56 million and would be awarded by the Department of the Army Materiel Command TACOM Life Cycle Management Command to a single contractor for an initial period of five years with two optional one-year extensions, for a potential total period of seven years.

View the file

Other files

File Type Posted
W56HZV21R0185_Conformed Copy 24 MAR 2022.pdf PDF
W56HZV21R0185-0004.pdf PDF
W56HZV21R0185-0005.pdf PDF
W56HZV21R0185_Conformed Copy 26 MAY 2022.pdf PDF
W56HZV21R0185-0003.pdf PDF
W56HZV21R0185 Conformed 24 FEB 22.pdf PDF
W56HZV21R0185 Conformed 17 FEB 22.pdf PDF
W56HZV21R0185-0002.pdf PDF
Attachment 0034 - Assertions.xlsx XLSX spreadsheet
W56HZV21R0185 Conformed 4FEB2022.pdf PDF
W56HZV21R0185-0001 4 FEB 2022 Signed.pdf PDF
Attachment 0001 - CATV Performance Specification 1FEB2021.pdf PDF
Attachment 0030 - End Item-Specific Special Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0007 - PDR Checklist 17DEC2021.pdf PDF
Attachment 0001 - CATV Perfromance Specification 6JAN2022.pdf PDF
Attachment 0026 - Government Furnished Property (GFP).pdf PDF
Attachment 0008 - FDR Checklist 17DEC2021.pdf PDF
Attachment 0024 - Advanced Manufacturing Candidate List.xlsx XLSX spreadsheet
Attachment 0002 - Integrated Master Schedule.pdf PDF
Attachment 0019 - Provisioning Requirements Statement.pdf PDF
Attachment 0014 - TIR and FACAR Report Data.pdf PDF
Attachment 0012 - CATV Systems Specification Sheet.xlsx XLSX spreadsheet
W56HZV21R0185 CATV RFP Final Signed 14 JAN 2022.pdf PDF
Attachment 0009 - Pre-TRR Checklist.pdf PDF
Attachment 0022 - SESAME Guide.pdf PDF
Attachment 0015 - WindChill ECP Process.pdf PDF
Attachment 0028 - ARMY CDRL Module OEM Contractor Training FEB 2019.pdf PDF
Attachment 0032 - CATV Performance Specification Report.xlsx XLSX spreadsheet
Attachment 0005 - PEO CSCSS Armoring Systems SCG_2017.pdf PDF
Attachment 0020 - Data Reqmts Form for Acq Requirement Package (ARP).pdf PDF
Attachment 0029 - MPVS CDRL Module and ACE Submissions.pdf PDF
Attachment 0021 - CATV User Evaluation Plan and Soldier Survey.pdf PDF
Attachment 0027 - Welding Standards.pdf PDF
Attachment 0031 Pricing Workbook Final.xlsx XLSX spreadsheet
Attachment 0006 - PEO CSCSS OPSEC Program Oct 2016 SIGNED.pdf PDF
Attachment 0017 - HMMR Template.xlsx XLSX spreadsheet
Attachment 0010 - TRR Checklist.pdf PDF
Attachment 0013 - Risk Mgt Scoring Criteria and Report Template.xlsx XLSX spreadsheet
Attachment 0003 - Applicable Documents 10 DEC 21.pdf PDF
Attachment 0023 - Army Advanced Methods_Materials_and_Equipment.pdf PDF
Attachment 0011 - Transportability Data Sheet.xlsx XLSX spreadsheet
Attachment 0025 Specifically Negotiated License Agreement for Advanced Manufacturing (SNL-AM).pdf PDF
Attachment 0018 - FMECA Requirements.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Attachment 0016 – Request for Use of Prohibited Material

Attachment 0016

Request for Use of Prohibited Material

Distribution Statement A – Approved for Public Release; distribution unlimited

(*Distribution Statement A only applies when form is not filled in. Once filled check the [Program] Security Class Guide for proper distribution statement/markings)

1. General Information

Requesting Company

Date of Request

Point of Contact

Prohibited material for which waiver is requested

2. Explanation of Use

Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery including quantities of these parts. Indicate the specific variant and/or trailer the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.

3. Health Hazard

Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).

4. Analysis of Alternatives

Instructions: Identify all alternative which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for.

5. Technical Justification

Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated. Note cost, schedule, and use of non-developmental items (NDI) are not technical justifications.

6. Program Risk

Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.

7. Get Well Plan

Instructions: Identify which parts where an alternative may be integrated at a later date. Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.

The following Sections will be filled in by the Government

8. Environmental Safety and Occupational Health Representative Evaluation/ Recommendation

Instructions: Government ESOH Representative to provide evaluation of the above information and a recommendation to the Product Director/Project Manager regarding approval/disapproval of the prohibited material request.

ESOH Representative Date

9. Concurrence

I concur that use of {prohibited material} as described in this form under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:

Chief/Lead Engineer

Product Director

10. Approval

Upon the basis of the findings above, I hereby determine that use of {prohibited material} as identified in Section 2 of this form for the {Contractor Name} Contract {Contract Number} is acceptable and justified.