This is a summary of an invitation for bid solicitation and related federal contract opportunity documents. The solicitation is for construction services to build a new three-bay specialized hangar at Dane County Regional Airport in Madison, Wisconsin to support F-35 mission operations. Scope of work includes demolishing an existing building and constructing a 31,000 square foot hangar with three bays, administrative offices, and specialized spaces for fuel cell operations, indoor washing, squadron surface coating, and weapons loading training. The project also includes a lightning protection system, fall protection, and an Advantor security system. The base award includes construction with optional additions for a paint/mix facility addition and aircraft rated pavement. Brand name requirements include specified security, building automation, lock, and fire alarm systems. The bid opening will be conducted according to FAR and DFARS. The estimated value is between $25-100 million. Interested contractors must attend a pre-bid conference and site visit. The North American Industry Classification code is 236220 and size standard is $39.5 million. The contract duration is 550 days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
19_ITEM 01.3-9_ADD 03_02700SF508.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
23_ITEM 01.3-13_ADD 03_02700A-500.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
31_ITEM 01.3-21_ADD 03_02700A-701.pdf PDF
37_ITEM 01.3-27_ADD 03_02700FA601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
Bid Opening Directions.pdf PDF
02_ITEM 01.2-1_ADD 02_PROJECT TOC.pdf PDF
08_ITEM 01.2-9_ADD 02_Section 08 87 35.pdf PDF
17_ITEM 01.3-3_ADD 02_02700C-301.pdf PDF
27_ITEM 01.3-13_ADD 02_02700SF106.pdf PDF
39_ITEM 01.3-25_ADD 02_02700FA101.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
ATTACHMENT 7 - 20220208 Single Source Determination - Monaco - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F-

A

F-35A

F-

A

F-35A

F-

A

F-35A

F-

A

F-35A

GFI

C

GFI

C

GFI

C

GFI

C

24"

GFI

C

24"

24"

24"

24"

GFI

GFI

GFI

GFI

GFI

GFI

GFI

J

GFI

GFI GFI

GFIGFI

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

24"

GFI

GFI

24"

M

M M

M

GFI

WP

GFI

WP

GFI

WP

GFI

WP

M

GFI

WP

GFI

C GFI

GFI

GFI

WP

GFI

WP

GFI

WP

GFI

WP

M M

J

JJ

J J

JJJJ

GFI

WP

GFI

WP

GFI

WP

24"

GFI

G

FI

GFI

GFI

J

24"

GFI

GFI

GFI

GFI

48"

GFI

140133

117B

117A

120B

FUEL

CELL

HPCU-01

C1

EP401

D2

EP401

ITC1

1L1 T1L1

1HDP

2HDP

T2L1

2L1

ITC2

270VDC

CONVERTER

#2

270VDC

CONVERTER

#1

MATCHLINE

SEE A1 /

EP101

MATCHLINE

SEE A1 /

EP101

A4

EP102

A

A B

B

C

C

E

E

F

F

G

G

J

J

D

D

H

H

48"

48"

48"

48"

48"

48" 48"

48"48"48"

48"

48" 48"

HPFC-01

C3

EP401

L2-1

L2-2 - 3,5 #10

L2-2 - 4,6 #10

7 7

FA1 - 1

101010

11 11 11 12 12

HD1 - 2,4,6

#10

HD1 - 1,3,5

#10

16 16

L2-2

2L1 - 52L1 - 72L1 - 9

2L1 - 12

2L1 - 11

2L1 - 13

2L1 - 13

1L1 - 7

1L1 - 9

1L1 - 11

1L1 - 12

1L1 - 13

2HDP - 8,10,12

2HDP - 7,9,11

1HDP - 7,9,11

1HDP - 8,10,12

L1-1 - 6,8

2L1 - 16

2L1 - 16

1L1 - 15

1L1 - 15

L1-1 - 20,22

L1-1 - 24,26

L1-1 - 28,30 L2-2 - 18

L2-2 - 18

L2-2 - 18

L2-2 - 18

L1-1 - 13,15,17

L1-1 - 19,21,23

L1-1 - 25,27,29

#1/0 #1/0

#1/0#1/0

CU-01

CU-02

CU-03

22 23

FA1 - 3,5,7

48"48"

48"

2L1 - 14

48"

1L1 - 14

48"

48"

1L1 - 16

RTH-07

RTH-04

RTH-5B

RTH-5A

FT-03

1L1 - 15

12 12

FCU-01

FCU-02

FCU-03

L1-1 - 31,33

RTH-6A

RTH-6B

2L1 - 16

13 13 28 28

FA1 - 8

FA1 - 9

FA1 - 11

FA1 - 10

FA1 - 12

FA1 - 13

L2-2 - 18

B1

EP401

135134 141

P.C

P.C

P.C

P.C

P.C

P.C L2-2

P.C

P.C

VAV-09

2HDP SPD

2L1 SPD

1L1 SPD

L2-1 - 33P.C

1HDP SPD

48"

1L1 - 18

2L1 - 15

HUM-05 2HDP - 19,21

CU-04

L1-1 - 10,12 #10

2L1 - 24

48"

48"

2L1 - 17

PAINT/SAND/MIX

A

A B

B

C

C

D

D

L2-2 - 26

L2-2 - 31

L2-2 - 27 L2-2 - 32

L2-2 - 29

L2-2 - 34

AS-01

H1 - 36,38,40

DIRTY ROOM

144.2

CLEAN

ROOM

144.1 L2-2 - 37

L2-2 - 39 #10 48"

1HDP -

19,21,23

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\aoo\D o cum ents\02700_Elec_A O genche .rvt

6/27/2022 1:19: 32 PM

ELECTRICAL POWER PLAN

SECTOR TWO

EP102

JTL

GPN

GPN

SCALE: 1/8" = 1'-0"

ELECTRICAL POWER PLAN SECTOR TWOA1 0 4' 8' 16'

1/8" = 1'-0"

GENERAL NOTES

SHEET KEYNOTES

SCALE: 1/8" = 1'-0"

ELECTRICAL POWER PLAN

SECTOR A - BID OPTION 1A4

ROOM SCHEDULE

Name Number

WEAPONS TRAINING 101

VEST. 102

SHARED OFFICE 103

FUEL OPEN OFFICE 104

VEST. 105

CORR. 106

CLASSROOM 107

OFFICE 108

RR W 109

WING WEAPONS MGR 110

RR M 111

FUEL SUPERVISOR 112

BREAK/ TRAINING 113

VEST. 114

OFFICE 115

VINYL OPEN OFFICE 116

MOTHER'S ROOM 117A

JAN 117B

FUEL MAINT. GENERAL STORAGE 118

FUEL CELL 119

VEST 120A

CORR. 120B

ELEC. 121

FUEL 122

WASH 123

MECH 124

FIRE 125

TOOLS 126

VEST 127

WASH BAY 128

CLEAN M RR 130

CLEAN M LR 131

CLEAN SHOWER M 132

DIRTY SHOWER M 133

DIRTY LR M 134

DIRTY SHOWER M 135

CLEAN W RR 136

CLEAN W LR 137

CLEAN SHOWER W 138

DIRTY LR W 139

DIRTY SHOWER W 140

PAINT/SAND/MIX 140

DIRTY RR UNISEX 141

DIRTY VEST. 142

MASK WASHING 143

PAINT/SAND/MIX 144

ELECT 145

COMM. 146

A. REFER TO E-001 FOR LEGEND & MOUNTING HEIGHT

DETAIL.

B. REFER TO EP501 FOR TYPICAL HALF SWITCHED

RECEPTACLES AND VAV CONTROL DETAIL.

C. INSTALL SWITCHING MODULES ABOVE CEILING

WHERE APPLICABLE.

D. ALL RACEWAYS SHALL HAVE SEPARATE GROUND

WIRES.

E. PANELS, AND ALL ELECTRICAL EQUIPMENT SHALL

BE MOUNTED ABOVE 18" AFF.

1. 240V, 30A, 3 POLE, NEMA 3R NF DISCONNECT

SWITCH.

2. 240V, 30A, 2 POLE, NEMA 3R NF DISCONNECT

SWITCH.

3. 600V,30A, 3 POLE, NEMA 3R NF DISCONNECT

SWITCH.

4. JUNCTION BOX TO POWER FLAP.

5. 6-30R TYPE RECEPTACLE TO POWER DRYER,

COORDINATE EXACT LOCATION WITH DRYER.

6. CIRCUIT ELECTRICAL FIXTURES IN THIS AREA TO

PANEL AND CIRCUIT AS INDICATED UNO.

7. PROVIDE RECEPTACLE FOR GAS FIRE RADIANT

HEATER AS PER COORDINATION WITH MECHANICAL

CONTRACTOR. COORDINATE EXACT LOCATION IN

THE FIELD PRIOR TO ROUGH-IN.

8. MOVE RECEPTACLE TO GRID LINE E IF BID 1 IS

ACCEPTED.

9. 480V, 3 POLE,1 GROUND, 100A RECEPTACLE TO

POWER AIRCRAFT SUPPORT EQUIPMENT.

RECEPTACLES SHALL BE MOUNTED AT 4'-0" AFF.

COORDINATE WITH MANUFACTURER FOR EXACT

RECEPTACLE TYPE.

10. 240V, 30A, 3 POLE, NEMA 3R NF DISCONNECT

SWITCH FOR NITROGEN GENERATOR.

11. NOT USED

12. CONTRACTOR TO PROVIDE PAD TO MOUNT

ELECTRICAL EQUIPMENT AT OR ABOVE 24" AFF.

13. JBOX TO POWER HARD WIRED LOW VOLTAGE

TRANSFORMER. TRANSFORMER WILL POWER

24VAC PLUMBING FLUSHOMETER VALVE.MOUNT

TRANSFORMER TO THE FACEPLATE OF THE JBOX.

MOUNT TRANSFORMER AND JBOX TO WHERE ITS

NOT READILY VISIBLE.TRANSFOMER IS PROVIDED

BY EQUIPMENT MANUFACTURER.PROVIDE

ADEQUATE JBOXES TO POWER PLUMBING

FIXTURES ,QUANTITY OF JBOX WILL VARY

DEPENDING ON MANUFACTURER.

14. COORDINATE LOCATION OF JBOX WITH DOOR

INSTALLER .

15. MOUNT BOTTOM OF PANEL BOARDS ABOVE 2'-0"

AFF.

16. 600V, 30A, 3 POLE, NEMA 3R NF DISCONNECT

SWITCH TO POWER AIR SHOWER. COORDINATE

WITH AIR SHOWER INSTALLER FOR EXACT

LOCATION OF DISCONNECT.

17. CONTRACTOR RESPONSIBLE TO PROVIDE POWER

FOR VAV BOXES AS PER MANUFACTURER

REQUIREMENTS AND IN COORDINATION WITH HVAC

INSTALLER.

18. IN FUEL CELL 119, ALL WALL MOUNTED OUTLETS

SHALL BE LISTED FOR USE IN EITHER CLASS 1 DIV 1

OR CLASS 1 DIV 2 HAZARDOUS LOCATIONS.

19. IN WASHBAY 128 ELECTRICAL ENCLOSURES SHALL

BE NEMA 3R RATED. FURTHERMORE, ALL CONDUITS

SHALL BE GALVANIZED RIGID STEEL. ALL

CONVENIENCE RECEPTACLES SHALL BE WEATHER

PROOF AND HAVE IN USE COVERS. ALL OTHER

RECEPTACLES SHALL BE WEATHER PROOF AND

HAVE WEATHER PROOF COVERS.

20. 600V,30A, 2 POLE, NEMA 1 NF DISCONNECT SWITCH

TO POWER MECHANICAL EQUIPMENT. COORDINATE

WITH EQUIPMENT INSTALLER FOR EXACT

LOCATION.

21. 600V, 30A, 3 POLE, NEMA 1 NF DISCONNECT

SWITCH TO POWER DT-3000 AIR FLOW SYSTEM.

COORDINATE EQUIPMENT INSTALLER FOR EXACT

LOCATION OF DISCONNECT.

22. RECEPTACLE TO POWER HOT BONDING

EQUIPMENT . COORDINATE EXACT LOCATION WITH

OWNER EQUIPMENT. MOUNT RECEPTACLES IN A

WAY THAT DOES NOT OBSTRUCT INSTALLATION OF

BENCHES.

1 ADDENDUM 1 04/22/2022

2 ADDENDUM 2 06/08/2022

3 ADDENDUM 4 06/28/2022