This is a solicitation for an unrestricted invitation for bid to construct a new three-bay specialized hangar at Dane County Regional Airport-Truax Field in Madison, Wisconsin. The project scope includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three-bay hangar facility compatible with F-35 operations such as fuel cell maintenance, indoor washing, and weapons load training. The facility will also include administrative office space and shops to support future paint booth and composite work areas.
The solicitation includes a base bid for new construction along with two options. Option one is for a paint/mix addition and option two is for aircraft rated pavement. Brand name justification is provided for required systems including Advantor security, Andover DDC controls, Marshall Best locks, and Monaco Vulcan fire alarms. The pre-bid conference will be held on-site with the bid opening conducted according to FAR Subpart 14.4. The contract duration is 550 days from notice to proceed. The estimated value ranges from $25-100 million. Interested contractors must register in SAM and monitor the site for amendments.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SS
SS
SS
EEEEE
EEE
E E
E E E E
E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
GGGGGGGGG
G
G G
G
G
G
G G
GG
G
G G
G
G
G
G
G
G
G
G
G
G G
G
G
G
G
SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SANSAN
SAN
SAN
SAN SAN SAN
SAN
SAN
SAN
SAN
SA
N
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
T
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W W
W W
W
W
W
W W
W W
W
W
W
W W
W
W
W
W
W
W
WWWWW WV
WV
WVWV WV
WV
TEL
WV
TEL
TEL
TEL
MWEL
WV
UT
UT
UT
WV
TEL
WV
MWEL
MWEL
UT
UT
MWEL
MWEL
UT
MWEL
MWEL
GV
GVGTST
WV
TEL
WV
MWEL
WV
A/C A/C EL
MWEL
SAN
AG
WV
AG
UT
BLDG
BLDG
BLDG
AG
AG
AG
UT
BLDG
UT
MWEL
MWEL
SAN
SAN
BLDG
BLDG
BLDG
BLDG
BLDG
MWEL
SAN
MWEL
GTST
WV
SS
WV
WV
WVWV
SAN
SAN
VENT
UT UT
A/C
UT
DOCK DOCK
TEL
A/C
BORE
AG
SS
SS
SSSSSSSS
EXISTING 18" RCP TO REMAIN
SS
SS
SS
SS
W W
W W
W
W
W
W
W
W
W
W
W
W W W
SS
SSEX
IS
TI
N G
2"
R C
P
TO
R
EM
AI
N
W
W
REMOVE BITUMINOUS
PAVEMENT (TYP.), 5,036 S.Y.
REMOVE PCC PAVEMENT,
1,447 S.Y.
REMOVE COMMUNICATION LINE,
202 L.F.
EXISTING WALL TO BE
REMOVED TO PROPOSED
PCC PAVEMENT LIMIT.
92 L.F.
REMOVE BITUMINOUS
PAVEMENT (OLI 2), 692 S.Y.
REMOVE ELECTRICAL,
COORDINATE WITH MADISON
GAS AND ELECTRIC
REMOVE FENCE, 317 L.F.
REMOVE GAS LINE, 129 L.F.
REMOVE MONITORING
WELL, 3 EACH.
REMOVE EXISTING SANITARY (TYP.),
540 L.F. AND 6 STRUCTURES.
REMOVE SIDEWALK,
2,454 S.F. (TYP.)
REMOVE STORM (TYP.), 773
L.F. AND 11 STRUCTURES.
REMOVE WATER LINE,
32 L.F. AND HYDRANT
EXISTING PCC
PAVEMENT
EXISTING
BUILDING TO BE
REMOVED
EXISTING
BITUMINOUS
PAVEMENT
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING PCC
PAVEMENT
EXISTING
STRUCTURE TO
BE RELOCATED
BY THE
GOVERNMENT
PRIOR TO
CONSTRUCTION
REMOVE ELECTRICAL,
COORDINATE WITH MADISON
GAS AND ELECTRIC
REMOVE HYDRANT
REMOVE HYDRANT
REMOVE EXISTING UNDERGROUND
FUEL OIL, USED OIL, USED SOLVENT,
AND DETERGENT STORAGE TANKS.
INTRUSION DETECTION CABLES
AND GAP SENSORS TO BE
REMOVED AND REPLACED,
SPLICING WILL NOT BE ALLOWED.
WORK TO BE COORDINATED WITH
ADVANTOR.
REMOVE ELECTRICAL, COORDINATE
WITH MADISON GAS AND ELECTRIC
REMOVE CONCRETE
CURB AND GUTTER,
364 L.F.
REMOVE WATER LINE, 72 L.F. AND
CAP EXISTING LINE TO REMAIN
REMOVE TELEPHONE
PEDESTAL AND
PULLBOX
REMOVE EXISTING
BUILDING STRUCTURE, 10
BOLLARDS, AGGREGATE
BASE AND SIGN
FEDERAL AVIATION
ADMINISTRATION CABLE IN THIS
AREA, APPROXIMATELY 24" DEEP.
THIS CABLE CANNOT BE SPLICED
IF CUT AND WOULD NEED
REPLACED ITS ENTIRE LENGTH.
REMOVE
BITUMINOUS
PAVEMENT (OLI 2),
3,060 S.Y.
REMOVE MONITORING
WELL (OLI 2)
GAS TEST STATION TO
BE ADJUSTED (OLI 2)
SANITARY STRUCTURE
TO BE ADJUSTED (OLI 2)
ADDITIONAL PAVEMENT TO BE
REMOVED FOR UTILITY
REMOVAL OR INSTALLATION
SHALL BE REPLACED IN KIND,
SEE TYPICAL SECTIONS.
0 15' 30' 60'
N
PROPOSED
REMOVAL LEGEND
BITUMINOUS PAVEMENT
PCC PAVEMENT
SIDEWALK
WALL
CONCRETE CURB AND GUTTER
ELECTRICAL LINE
STORM DRAIN
WATER LINE
GAS LINE
COMMUNICATION LINE
SANITARY LINE
FENCE LINE
MONITORING WELL
WATER/SANITARY STRUCTURE
STORM STRUCTURE
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
-B ay S pe ci al iz ed H an ga r M ad is on , W is co ns in
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021
LDH
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
1525 S. 6th Street Springfield, IL 62703 phone: 217-788-2450 fax: 217-788-2503
REMOVAL PLAN
C-301
LDH
HLE
1. EXISTING CONDITIONS ARE BASED ON SURVEY
PERFORMED BY KL ENGINEERING, INC. ON
06/2020.
2. OLI - OPTIONAL LINE ITEM
3. UTILITIES TO BE REMOVED UNDER MITCHELL
STREET SHALL BE PULLED IF WITHIN DUCTS,
DUCT MAY BE ABANDONED IN PLACE. OTHER
UTILITIES MAY BE CUT, CAPPED AND ABANDONED
IN PLACE UNDER THE ROAD IF THEY DO NOT
INTERFERE WITH PROPOSED CONSTRUCTION.
ADDENDUM 21 06/08/2022
ADDENDUM 42 06/28/2022
| Sheets and Views |
| REMOVAL PLAN |
File details come from the government source that posted it. Updated .