14_ITEM 01.3-4_ADD 04_02700SF104.pdf

PDF 428 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This federal contract opportunity document describes an invitation for bid for construction services. The 115th Fighter Wing at Dane County Regional Airport - Truax Field in Madison, Wisconsin intends to award a firm fixed-price contract to construct a new three-bay hangar facility compatible with F-35 operations, including fuel cell operations, indoor wash requirements, squadron-level surface coating operations and weapons load training. The scope of work includes demolishing an existing building and constructing a 31,000 square foot hangar with administrative and shop spaces to accommodate a future paint booth and composite make-up areas. The contract duration is 550 days from notice to proceed. This solicitation is unrestricted and encourages participation from all responsible offerors. The contract value is estimated between $25-100 million. The bid includes base line items for construction and two options relating to a paint/mix addition and aircraft-rated pavement. The bid opening will be conducted according to FAR and DFARS and the complete solicitation is available on SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Questions and Answers 4.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 004 COMBINED DRAWINGS.pdf PDF
22_ITEM 01.3-12_ADD 04_02700A-502.pdf PDF
Questions and Answers 3.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
08_ITEM 01.2-8_ADD 03_Section 21 13 18.pdf PDF
10_ITEM 01.2-10_ADD 03_Section 26 08 00.pdf PDF
12_ITEM 01.3-2_ADD 03_02700C-100.pdf PDF
25_ITEM 01.3-15_ADD 03_02700A-505.pdf PDF
27_ITEM 01.3-17_ADD 03_02700A-511.pdf PDF
32_ITEM 01.3-22_ADD 03_02700A-702.pdf PDF
35_ITEM 01.3-25_ADD 03_02700FA101.pdf PDF
01_ITEM 01.2-1_ADD 03_Section 02 65 00.pdf PDF
07_ITEM 01.2-7_ADD 03_Section 21 13 13.pdf PDF
Questions and Answers 2.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 03_2022.06.14_Narrative.pdf PDF
04_ITEM 01.2-4_ADD 03_Section 05 51 33.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
17_ITEM 01.3-7_ADD 03_02700SF102.pdf PDF
21_ITEM 01.3-11_ADD 03_02700A-306.pdf PDF
22_ITEM 01.3-12_ADD 03_02700A-307.pdf PDF
26_ITEM 01.3-16_ADD 03_02700A-510.pdf PDF
Bid Opening Directions.pdf PDF
02_ITEM 01.2-1_ADD 02_PROJECT TOC.pdf PDF
08_ITEM 01.2-9_ADD 02_Section 08 87 35.pdf PDF
17_ITEM 01.3-3_ADD 02_02700C-301.pdf PDF
27_ITEM 01.3-13_ADD 02_02700SF106.pdf PDF
39_ITEM 01.3-25_ADD 02_02700FA101.pdf PDF
40_ITEM 01.3-26_ADD 02_02700FA102.pdf PDF
41_ITEM 01.3-27_ADD 02_02700FA601.pdf PDF
47_ITEM 01.3-33_ADD 02_02700EP701.pdf PDF
31_ITEM 01.3-17_ADD 02_02700A-103.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
22_ITEM 01.3-8_ADD 02_02700SF101.pdf PDF
26_ITEM 01.3-12_ADD 02_02700SF105.pdf PDF
34_ITEM 01.3-20_ADD 02_02700A-202.pdf PDF
44_ITEM 01.3-30_ADD 02_02700EG601.pdf PDF
46_ITEM 01.3-32_ADD 02_02700EP601.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 7 - 20220208 Single Source Determination - Monaco - Redacted.pdf PDF
W50S9F22B0001 Solicitation - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 4 - 20220208 Single Source Determination - Advantor - Redacted.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

J

G

G

F

F

E

E

C

C

MK L

H

1'-10" 20'-6" 20'-8" 20'-6" 1'-10"

23'-10" 22'-0" 22'-6" 9'-0"

1'-10"

'-4

'-6

'-6

'-6

'-6

'-4

'-6

'-0

'-1

0"

'-4

/4

9' -0

BRACING

BR

AC

IN

G

BR

AC

IN

G

BRACING

BRACING

BRACING

BR

AC

IN

G

BR

AC

IN

G

MATCHLINE

'-9

/4

0'

-2

1' -1

0"

6'

-8

77'-4 3/4"

61'-8"

0'

-8

/4

1' -1

0"

2' -2

1' -1

0"

3/4"

1. PROVIDE BOTTOM FLANGE BRACES ON ALL ROOF GIRDERS AND

BEAMS . SPACE FLANGE BRACES AT 10'-0" OC TYP W/ ADD'L

LOCATIONS AS NOTED.

2. ALL SUSPENDED MECHANICAL, ELECTRICAL AND FIRE

PROTECTION PIPES OR EQUIPMENT SHALL BE SUPPORTED BY

BEAMS. PROVIDE KICKERS AS NEEDED. ATTACHMENT TO METAL

DECK FROM BELOW IS NOT ALLOWED.

3. LOCATION AND WEIGHTS OF MECHANICAL EQUIPMENT SHOWN ON

PLAN ARE BASIS OF DESIGN. VERIFY WITH MECHANICAL FOR

ADDITIONAL INFORMATION. GC TO COORDINATE FINAL LOCATION

AND SUPPORT REQUIREMENTS.

HIGH ROOF FRAMING PLAN NOTES

1 ROOF DECKING

1.5B 20GA GALV ROOF DECK (33 KSI MIN) ATTACHED

WITH 36/7 PATTERN OF 5/8" DIA PUDDLE WELDS AT

ALL SUPPORTS AND AT PERIMETER. PROVIDE #10

TEK LAP FASTENERS 20" OC.

2 NOT USED.

3 NOT USED.

4 RIGID RAIL FALL ARREST REFER TO .

5 NOT USED.

6 NOT USED

7 SUSPENDED FAN BELOW. 290 LBS ASSUMED WEIGHT.

8 PROVIDE ROOF FRAMING KICKERS AT 10'-0" MAX SPACING

TYPICAL.

HANGAR REFER AND

ADMIN REFER AND

C1 / SF502

C1 / SF502 C2 / SF502

C3 / SF502

MOMENT CONNX

A1 / S-002

MECHANICAL ROOF TOP UNIT OR MAKE UP AIR UNIT. REFER

TO MECHANICAL FOR UNIT SCHEDULING. GC TO COORD

FINAL LOCATION OF THE W8X18 SUPPLEMENTARY STEEL TO

SUPPORT UNIT CURBS ONCE FINAL UNITS HAVE BEEN

SELECTED. GC TO COORDINATE OPENINGS THRU ROOF OR

WALL AND PROVIDE ANGLE FRAMING FOR ROOF OPENING

AND COLD FORMED FRAMING AT WALL OPENINGS.

FALL ARREST ANCHOR PER DETAIL B3/S-002

FALL ARREST ANCHOR SIMILAR TO DETAIL B3/S-002.

L2-1/2x2-1/2 KICKER NOTED IN DETAIL B3/S-002 NOT

REQUIRED AT THESE LOCATIONS.

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\nw c\D ocum ents\M y R evit\02700_S tru_N C hapm an9285M

.rvt

6/24/2022 5:13: 02 PM

HIGH ROOF FRAMING PLAN -

COMPOSITE

SF104

TJD

CTW

CTW

SCALE: 1/16" = 1'-0"

HIGH ROOF FRAMING PLAN - COMPOSITEA1

0 8' 16' 32'

1/16" = 1'-0"

1 ADDENDUM 1 04/22/2022

2 ADDENDUM 2 06/08/2022

3 ADDENDUM 4 06/28/2022

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

GENE O.

BROWN

E-47748

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .