About this file

This solicitation is for the construction of an F-35 Three Bay Specialized Hangar. The project involves demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three bay hangar facility at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The hangar bays will include pre-conditioned aircraft air, 270VDC aircraft power, fire suppression, and hangar bay HVAC. Administrative and shop spaces will also be constructed along with future paint booth and composite spaces. Additional requirements include a lightning protection system, fall protection, and an Advantor security system. The project will be registered with the USGBC.

The solicitation includes a base bid for construction and two options. Interested contractors are encouraged to attend the pre-bid conference and site visit. The bid opening will be conducted in accordance with FAR Subpart 14.4. The contract is for a single award with a duration of 550 days. The NAICS code is 236220 and size standard is $39.5M. The magnitude is estimated between $25-100M. The solicitation and documents are available on SAM.gov. Award will be made to the responsive and responsible lowest bidder.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Abstract of Offers.pdf PDF
39_ITEM 01.5-1_ADD 03_Bid Question Attachment_2022.06.14.pdf PDF
06_ITEM 01.2-6_ADD 04_Section 08 33 23.pdf PDF
11_ITEM 01.3-1_ADD 04_02700C-301.pdf PDF
12_ITEM 01.3-2_ADD 04_02700C-401.pdf PDF
20_ITEM 01.3-10_ADD 04_02700A-140.pdf PDF
24_ITEM 01.3-14_ADD 04_02700A-702.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
Questions and Answers 2.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 03_2022.06.14_Narrative.pdf PDF
04_ITEM 01.2-4_ADD 03_Section 05 51 33.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
17_ITEM 01.3-7_ADD 03_02700SF102.pdf PDF
21_ITEM 01.3-11_ADD 03_02700A-306.pdf PDF
22_ITEM 01.3-12_ADD 03_02700A-307.pdf PDF
26_ITEM 01.3-16_ADD 03_02700A-510.pdf PDF
29_ITEM 01.3-19_ADD 03_02700A-601.pdf PDF
30_ITEM 01.3-20_ADD 03_02700A-602.pdf PDF
GEO TECH REPORT_F-35 Hangar_2020-08-28_FINAL9-10-2020.pdf PDF
08_ITEM 01.2-8_ADD 03_Section 21 13 18.pdf PDF
10_ITEM 01.2-10_ADD 03_Section 26 08 00.pdf PDF
12_ITEM 01.3-2_ADD 03_02700C-100.pdf PDF
25_ITEM 01.3-15_ADD 03_02700A-505.pdf PDF
27_ITEM 01.3-17_ADD 03_02700A-511.pdf PDF
32_ITEM 01.3-22_ADD 03_02700A-702.pdf PDF
35_ITEM 01.3-25_ADD 03_02700FA101.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
22_ITEM 01.3-8_ADD 02_02700SF101.pdf PDF
26_ITEM 01.3-12_ADD 02_02700SF105.pdf PDF
34_ITEM 01.3-20_ADD 02_02700A-202.pdf PDF
44_ITEM 01.3-30_ADD 02_02700EG601.pdf PDF
46_ITEM 01.3-32_ADD 02_02700EP601.pdf PDF
Bid Opening Directions.pdf PDF
02_ITEM 01.2-1_ADD 02_PROJECT TOC.pdf PDF
08_ITEM 01.2-9_ADD 02_Section 08 87 35.pdf PDF
17_ITEM 01.3-3_ADD 02_02700C-301.pdf PDF
27_ITEM 01.3-13_ADD 02_02700SF106.pdf PDF
39_ITEM 01.3-25_ADD 02_02700FA101.pdf PDF
40_ITEM 01.3-26_ADD 02_02700FA102.pdf PDF
41_ITEM 01.3-27_ADD 02_02700FA601.pdf PDF
47_ITEM 01.3-33_ADD 02_02700EP701.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
ATTACHMENT 7 - 20220208 Single Source Determination - Monaco - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANG/WI - F-35: 3-Bay Specialized Hangar 20202700F353BAY Addendum No. 03 14 June 2022

SECTION 26 05 26.00 40

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

08/19

PART 1 GENERAL

Section 26 41 00 LIGHTNING PROTECTION SYSTEMS applies to work specified in this section.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM B3 (2013) Standard Specification for Soft or Annealed Copper Wire

ASTM B8 (2011; R 2017) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System

IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

NFPA 780 (2017) Standard for the Installation of Lightning Protection Systems

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 26 05 26.00 40 Page 1

SD-03 Product Data

Ground Rods ; G

Ground Wires ; G

Connectors and Fasteners ; G

Test Wells ; G

Conductive Corrosion Inhibiting Compounds ; G

Ground Buses ; G

SD-06 Test Reports

Bond Resistance Test ; G

Ground Resistance Tests ; G

Ground Isolation Test ; G

Equipment Continuity Test ; G

SD-07 Certificates

Ground Resistance Test Equipment ; G

Micro-Ohmmeter Test Equipment ; G

SD-11 Closeout Submittals

Record Drawings

1.3 QUALITY CONTROL

1.3.1 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Ensure equipment, materials, installation, and workmanship are in accordance with the mandatory and advisory provisions of NFPA 70 , IEEE C2 unless more stringent requirements are specified or indicated.

1.3.2 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Provide products which have been in satisfactory commercial or industrial use for 2 years prior to bid opening. Ensure the 2-year period includes applications of equipment and materials under similar circumstances and of similar size. Ensure the product has been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items must be products of a single manufacturer.

SECTION 26 05 26.00 40 Page 2

PART 2 PRODUCTS

Submit material, equipment, and fixture lists for grounding systems, including manufacturer's style or catalog numbers, specification and drawing reference numbers, warranty information, and fabrication site information.

2.1 MATERIALS

2.1.1 Ground Wires

2.1.1.1 Bare

Provide annealed bare copper, Class "B" stranded ground and bond wires in accordance with ASTM B8 for wires #4 AWG and larger and solid in accordance with ASTM B3 for wires #6 AWG and smaller. Provide conductors with 98 percent conductivity and sized wires in accordance with the requirements of NFPA 70 and NFPA 780 .

2.1.1.2 Insulated

Ensure insulated conductors conform to the requirements of Section

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL.

Where installed in conduit as part of a complete circuit provide conductors with green insulation for sizes #8 AWG and smaller and with green phase tape at each end and in each junction box for sizes #6 AWG and larger.

2.1.1.3 Straps/Jumpers

Provide copper bonding straps and jumpers with a cross-sectional area of not less than No. 6 AWG . Ensure bonding straps and jumpers for shock-mounted devices with pivot joints are made of woven-wire braid wire.

2.1.2 Connectors and Fasteners

2.1.2.1 Exothermic Welds

Ensure the molds, materials and powder charges used to make exothermic welds are the standard product of a single manufacturer and listed by the manufacturer for use on the specific type, size, quantity and configuration of conductors to which the weld is applied.

2.1.2.2 Irreversible Compression Lugs

Provide irreversible compression lug type connectors manufactured from tin-plated copper and installed using a hydraulic compression tool and die to apply correct, uniformly distributed, circumferential pressure. Ensure tools and dies are as recommended by the irreversible compression lug type connector manufacturer. Use an embossing die code or other standard method to provide visible indication that a connector has been adequately compressed onto the conductor. Apply irreversible compression lug type connectors in strict accordance with the manufacturer's written instructions and published installation instructions. Use 2-hole lug type connectors for connections to NEMA cable pads and bus bars, and single-hole connectors otherwise.

SECTION 26 05 26.00 40 Page 3

2.1.2.3 Mechanical

Provide split bolt and clamp style mechanical type connectors manufactured from copper, copper alloy, or bronze, listed by the manufacturer as suitable for direct burial use. Ensure mechanical type connectors are applied in strict accordance with the manufacturer's published installation instructions.

2.1.2.4 Fasteners

Provide bolts, nuts, washers, lock washers, and associated fasteners used for grounding and bonding connections manufactured of copperbronze. Where fasteners contact dissimilar metals, apply conductive oxide-inhibiting compound.

PART 3 EXECUTION

3.1 INSTALLATION

Install grounding systems in accordance with NFPA 70 , NFPA 780 and IEEE C2 , and as indicated.

Bond exposed non-current-carrying metallic parts of electrical equipment and metallic raceway systems to ground.

Bond grounding conductors in metallic and non-metallic raceways to ground. Make ground connections at equipment and to ground rods as indicated. Interconnect all grounding media in or on the structure to provide a common ground potential. This includes lightning protection, electrical service, telecommunications system grounds, as well as underground metallic piping systems.

Bond wiring system neutrals to ground in accordance with the requirements of NFPA 70 . Where ground fault protection is employed, ensure that connection of ground and neutral does not interfere with correct operation of fault protection.

3.1.1 Ground Buses

Install ground busses in accordance with manufacturer's instructions.

3.1.2 Equipment Grounding

Install ground systems for power, telecommunications, and instrumentation. Independently connect each system to the building counterpoise.

3.1.2.1 Equipment and Enclosure Bonding

Bond each metallic enclosure and all electrical equipment to ground. Make at least one copper connection from the system ground point to one or more enclosures in the area such that all enclosures and equipment provide a low-impedance path to ground when properly bonded together.

In addition to the green colored equipment grounding conductor required in each raceway and sized in accordance with Table 250.122 of NFPA 70 , bond each panelboard, switchboard enclosure, transformer housing, motor

SECTION 26 05 26.00 40 Page 4 housing, disconnect, starter, and other electrical equipment, to the grounding system with a stranded copper conductor, routed external to the feeder raceway.

3.1.2.2 Bonding of Conduit and Raceway Systems

Bond all metal conduit, fittings, junction boxes, outlet boxes, armored and metal sheathed cable, and other raceways. Ensure adequate electrical contact at the joints and terminations. Ensure metallic raceway systems have electrical continuity with equipment. Individually and directly connect equipment to the building ground, independent of the raceway system.

3.1.2.3 Cable Tray Bonding

Bond cable tray sections together. Cable tray sections in tandem assembly are considered as having electrical continuity when these sections are bonded with the appropriate bolts. Install bond straps across expansion joints. Bond cable trays to the building ground system.

3.2 FIELD QUALITY CONTROL

The requirements of Section 26 08 00 APPARATUS COORDINATION, INSPECTION AND TESTING apply to this section.

Perform the following tests in the presence of the Contracting Officer.

Furnish test equipment and personnel and submit written results of each test. Notify the Contracting Officer at least 14 calendar working days prior to each test.

Submit written results of each test to Contracting Officer for review and approval. Document each location where test is performed, the field conditions at the time of the test, the measured results of the test, and whether the measured results "PASSED" or "FAILED" relative to specified pass/fail performance criteria.

Perform rework to correct FAILED conditions at no additional cost to the Government.

3.2.1 Bond Resistance Test

Resistance of any bond connection cannot exceed 0.5 milliohm. Rework bonds that exceed this resistance at no additional cost to the Government.

3.2.2 Ground Resistance Tests Test grounding systems for ground resistance. Total resistance from any point on the ground network to the building counterpoise cannot exceed 50 milliohms. Make ground resistance and counterpoise tests during dry weather, and no sooner than 48 hours

SECTION 26 05 26.00 40 Page 5 after rainfall. Conduct tests using the ratio method that measures the ratio of the resistance to earth of an auxiliary test electrode to the series resistance of the electrode under test and a second auxiliary electrode. Perform measurements in accordance with IEEE 81 .

3.2.3 Ground Isolation Test

Test ground systems for isolation from other ground systems.

3.2.4 Equipment Continuity Test

Test connection from electrical distribution equipment including panelboards, switchboards, transformers, substations, and motor control centers to counterpoise. Measure and record the circuit resistance between electrical equipment ground connections and the counterpoise. The circuit resistance shall not exceed 5Ohms.