00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf

PDF 415 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR
Solicitation number
W50S9F-22-B-0001
Issued by

About this file

This federal contract opportunity is an unrestricted invitation for bid to construct a new three-bay specialized hangar at Dane County Regional Airport-Truax Field in Madison, Wisconsin to support the F-35 mission. Scope of work includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three-bay hangar with associated shop and administrative spaces to accommodate fuel cell operations, indoor wash requirements, squadron surface coating operations, and weapons load training. The facility will also require lighting protection, interior and exterior fall protection, and an Advantor security system. The contract will be a single award fixed-price construction contract with a duration of 550 days from notice to proceed. The solicitation includes a base bid and two options. The Department of the Army National Guard is the issuing agency.

View the file

Other files

File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Abstract of Offers.pdf PDF
Questions and Answers 4.pdf PDF
39_ITEM 01.5-1_ADD 03_Bid Question Attachment_2022.06.14.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
22_ITEM 01.3-12_ADD 04_02700A-502.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
24_ITEM 01.3-14_ADD 04_02700A-702.pdf PDF
Questions and Answers 3.pdf PDF
25_ITEM 01.3-15_ADD 04_02700ES101.pdf PDF
10_ITEM 01.2-10_ADD 04_Section 32 13 14.13.pdf PDF
26_ITEM 01.3-16_ADD 04_02700EP102.pdf PDF
20_ITEM 01.3-10_ADD 04_02700A-140.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
15_ITEM 01.3-5_ADD 04_02700SF105.pdf PDF
23_ITEM 01.3-13_ADD 04_02700A-503.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
11_ITEM 01.3-1_ADD 04_02700C-301.pdf PDF
06_ITEM 01.2-6_ADD 04_Section 08 33 23.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
27_ITEM 01.3-17_ADD 04_02700EP701.pdf PDF
04_ITEM 01.2-4_ADD 04_Section 07 24 00.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
17_ITEM 01.3-7_ADD 04_02700SF503.pdf PDF
02_ITEM 01.2-2_ADD 04_Section 04 20 00.pdf PDF
12_ITEM 01.3-2_ADD 04_02700C-401.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 004 COMBINED DRAWINGS.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
01_ITEM 01.2-1_ADD 03_Section 02 65 00.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
Questions and Answers 2.pdf PDF
07_ITEM 01.2-7_ADD 03_Section 21 13 13.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
18_ITEM 01.3-8_ADD 03_02700SF103.pdf PDF
16_ITEM 01.3-6_ADD 03_02700C-601.pdf PDF
03_ITEM 01.2-3_ADD 03_Section 05 50 13.pdf PDF
09_ITEM 01.2-9_ADD 03_Section 26 05 26.00 40.pdf PDF
Show 40 more

Latest 50 of 147 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

h:\prj\2020\20202700\08-submissions\2022_06_28_add 4\fsb2020-270-00_wi-ang_3-bay_add no. 04_2022.06.28_narrative.docx Page 1 of 5

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

ADDENDUM NO. 04

Date: 28 June 2022

To: ALL BIDDERS OF RECORD

From: Frankfurt-Short-Bruza Associates, P.C.

5801 N. Broadway Ext., Suite 500 Oklahoma City, OK 73118

Subject: XGFG189002: F-35 3-Bay Specialized Hangar, WI/ANG, Truax Field, Madison, WI

FSB Project No.: FSB2020-270-00

NOTE: This Addendum forms a part of the Contract Documents and modifies the Original Documents dated 23 December 2021.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

ATTACHMENTS

Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of (5) pages and the following attachments:

Specifications:

PROJECT TABLE OF CONTENTS

04 20 00 – UNIT MASONRY

07 21 13 – BOARD AND BLOCK INSULATION

07 24 00 – EXTERIOR INSULATION AND FINISH SYSTEMS

08 33 13 – COILING COUNTER DOORS

08 33 23 – OVERHEAD COILING DOORS

09 90 00 – PAINTS AND COATINGS

11 94 10 – ROOFTOP FALL PROTECTION ANCHORS

11 94 10.01 – RIGID RAIL FALL RESTRAINT SYSTEM

32 13 14.13 – CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS

Drawings:

C-301 – REMOVAL PLAN

C-401 – PROPOSED PLAN

C-601 – UTILITY PLAN

SF104 – HIGH ROOF FRAMING PLAN – COMPOSITE

SF105 – HIGH ROOF FRAMING PLAN – SECTOR ONE

SF106 – HIGH ROOF FRAMING PLAN – SECTOR TWO

SF503 – FRAMING DETAILS

FSB | DefineDesignDeliver

SF504 – FRAMING DETAILS

A-002 – PARTITION TYPES

A-140 – ROOF PLAN

A-501 – DETAILS

A-502 – DETAILS

A-503 – DETAILS

A-702 – FLOOR FINISH PLAN, ROOM FINISH SCHEDULE – BID OPTION 1

ES101 – ELECTRICAL SITE PLAN

EP102 – ELECTRICAL POWER PLAN SECTOR TWO

EP701 – ELECTRICAL PANEL SCHEDULES

EP702 – ELECTRICAL PANEL SCHEDULES

MODIFICATIONS TO THE CONDITIONS OF THE CONTRACT

None.

MODIFICATIONS TO THE SPECIFICATIONS

ITEM 01.2-1 Refer to attached Project Table of Contents, dated 28 June 2022:

A. Project Table of Contents is hereby revised and re-issued in its entirety to incorporate changes noted as part of this Addendum related to specifications included on the project. Replace Project Table of Contents dated 8 June 2022 with attached revised Project Table of Contents dated 28 June 2022.

ITEM 01.2-2 Refer to attached Specification Section 04 20 00 – UNIT MASONRY, dated 28 June 2022:

A. Specification Section 04 20 00 is hereby revised and re-issued in its entirety to provide requirements for Rigid Board- Type Insulation in Subpart 2.6.6. Replace Section 04 20 00 dated 8 June 2022 with attached revised Specification Section 04 20 00 dated 28 June 2022.

ITEM 01.2-3 Refer to attached Specification Section 07 21 13 – BOARD AND BLOCK INSULATION, dated 28 June 2022:

A. Specification Section 07 21 13 is hereby issued in its entirety to provide requirements for rigid board-type insulation in masonry walls on the project.

ITEM 01.2-4 Refer to attached Specification Section 07 24 00 – EXTERIOR INSULATION AND FINISH SYSTEMS, dated 28 June 2022:

A. Specification Section 07 24 00 is hereby revised and re-issued in its entirety to remove requirement for EIFS inspector to be present on-site for entire duration of installation in Subpart 3.5. Replace Section 07 24 00 dated 23 December 2021 with attached revised Specification Section 07 24 00 dated 28 June 2022.

ITEM 01.2-5 Refer to attached Specification Section 08 33 13 – COILING COUNTER DOORS, dated 28 June 2022:

B. Specification Section 08 33 13 is hereby issued in its entirety to provide requirements for fire shutters over windows looking into Fuel Cell, Room 119.

ITEM 01.2-6 Refer to attached Specification Section 08 33 23 – OVERHEAD COILING DOORS, dated 28 June 2022:

A. Specification Section 08 33 23 is hereby revised and re-issued in its entirety to remove requirements for manual operation of overhead coiling doors from Subpart 2.2.4; and to remove requirements for overhead door finishes not applicable to the project. Replace Section 08 33 23 dated 23 December 2021 with attached revised Specification Section 08 33 23 dated 28 June 2022.

ITEM 01.2-7 Refer to attached Specification Section 09 90 00 – PAINTS AND COATINGS, dated 28 June 2022:

A. Specification Section 09 90 00 is hereby revised and re-issued in its entirety to modify MPI Division 5 coating requirements in Subpart 3.14.2.3. Replace Section 09 90 00 dated 23 December 2021 with attached revised Specification Section 09 90 00 dated 28 June 2022.

ITEM 01.2-8 Refer to attached Specification Section 11 94 10 – ROOFTOP FALL PROTECTION ANCHORS, dated

A. Specification Section 11 94 10 is hereby revised and re-issued in its entirety to provide requirements for rooftop fall protection anchors included on the project. Replace Section 11 94 10 dated 8 June 2022 with attached revised Specification Section 11 94 10 dated 28 June 2022.

ITEM 01.2-9 Refer to attached Specification Section 11 94 10.01 – RIGID RAIL FALL RESTRAINT SYSTEM, dated

A. Specification Section 11 94 10.01 is hereby issued in its entirety to provide requirements for rigid rail fall restraint systems included on the project.

ITEM 01.2-10 Refer to attached Specification Section 32 13 14.13 – CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS, dated 28 June 2022:

A. Specification Section 32 13 14.13 is hereby revised and re-issued in its entirety to provide updated requirements for Contractor Quality Control in Subpart 1.4.3.3. Replace Section 32 13 14.13 dated 8 June 2022 with attached revised Specification Section 32 13 14.13 dated 28 June 2022.

MODIFICATIONS TO THE DRAWINGS

ITEM 01.3-1 Refer to attached Sheet C-301 – REMOVAL PLAN, dated 28 June 2022:

A. Sheet C-301 is hereby revised and re-issued in its entirety to update requirements for removal of utilities under Mitchell Street. Replace Sheet C-301 dated 8 June 2022 with attached revised Sheet C-301 dated 28 June 2022.

ITEM 01.3-2 Refer to attached Sheet C-401 – PROPOSED PLAN, dated 28 June 2022:

A. Sheet C-401 is hereby revised and re-issued in its entirety to provide requirements for delegated design of post-and-panel wall adjacent to facility. Replace Sheet C-401 dated 14 June 2022 with attached revised Sheet C-401 dated 28 June 2022.

ITEM 01.3-3 Refer to attached Sheet C-601 – UTILITY PLAN, dated 28 June 2022:

A. Sheet C-601 is hereby revised and re-issued in its entirety to provide updated requirements for proposed electric drop beam barrier across Mitchell Street. Replace Sheet C-601 dated 14 June 2022 with attached revised Sheet C-601 dated 28 June 2022.

ITEM 01.3-4 Refer to attached Sheet SF104 – HIGH ROOF FRAMING PLAN – COMPOSITE, dated 28 June 2022:

A. Sheet SF104 is hereby revised and re-issued in its entirety to provide clarification to framing required for fall arrest anchors denoted by High Roof Framing Plan Note #11. Replace Sheet SF104 dated 8 June 2022 with attached revised Sheet SF104 dated 28 June 2022.

ITEM 01.3-5 Refer to attached Sheet SF105 – HIGH ROOF FRAMING PLAN – SECTOR ONE, dated 28 June 2022:

A. Sheet SF105 is hereby revised and re-issued in its entirety to provide clarification to framing required for fall arrest anchors denoted by High Roof Framing Plan Note #11. Replace Sheet SF105 dated 8 June 2022 with attached revised Sheet SF105 dated 28 June 2022.

ITEM 01.3-6 Refer to attached Sheet SF106 – HIGH ROOF FRAMING PLAN – SECTOR TWO, dated 28 June 2022:

A. Sheet SF106 is hereby revised and re-issued in its entirety to provide clarification to framing required for fall arrest anchors denoted by High Roof Framing Plan Note #11. Replace Sheet SF106 dated 8 June 2022 with attached revised Sheet SF106 dated 28 June 2022.

ITEM 01.3-7 Refer to attached Sheet SF503 – FRAMING DETAILS, dated 28 June 2022:

A. Sheet SF503 is hereby revised and re-issued in its entirety to add Bracing Rod Notes to allow for use of turnbuckles when fabricated length of rod is shorter than bracing length required. Replace Sheet SF503 dated 23 December 2021 with attached revised Sheet SF503 dated 28 June 2022.

ITEM 01.3-8 Refer to attached Sheet SF504 – FRAMING DETAILS, dated 28 June 2022:

A. Sheet SF504 is hereby revised and re-issued in its entirety to provide clarification on the quantity of eyebolt anchors required at catwalk guardrail system. Replace Sheet SF504 dated 23 December 2021 with attached revised Sheet SF504 dated 28 June 2022.

ITEM 01.3-9 Refer to attached Sheet A-002 – PARTITION TYPES, dated 28 June 2022:

A. Sheet A-002 is hereby revised and re-issued in its entirety to modify Partition Type M12C to match callout provided on plan. Replace Sheet A-002 dated 14 June 2022 with attached revised Sheet A-002 dated 28 June 2022.

ITEM 01.3-10 Refer to attached Sheet A-140 – ROOF PLAN, dated 28 June 2022:

A. Sheet A-140 is hereby revised and re-issued in its entirety to coordinate number of rooftop fall protection anchors to match that required by structural plans. Replace Sheet A-140 dated 8 June 2022 with attached revised Sheet A-140 dated 28 June 2022.

ITEM 01.3-11 Refer to attached Sheet A-501 – DETAILS, dated 28 June 2022:

A. Sheet A-501 is hereby revised and re-issued in its entirety to provide Head Detail for overhead coiling door, Detail D2/S-501. Replace Sheet A-501 dated 14 June 2022 with attached revised Sheet A-501 dated 28 June 2022.

ITEM 01.3-12 Refer to attached Sheet A-502 – DETAILS, dated 28 June 2022:

A. Sheet A-502 is hereby revised and re-issued in its entirety to rename Detail C1A/A-502 to include jamb detail requirements; and to rename Detail C1B to provide clarification on locations where detail is to be applied. Replace Sheet A-502 dated 23 December 2021 with attached revised Sheet A-502 dated 28 June 2022.

ITEM 01.3-13 Refer to attached Sheet A-503 – DETAILS, dated 28 June 2022:

A. Sheet A-503 is hereby revised and re-issued in its entirety to modify Detail B1/A-503 and Detail C1/A-702 to require fluid-applied vapor barrier for consistency with wall sections. Replace Sheet A-503 dated 23 December 2021 with attached revised Sheet A-503 dated 28 June 2022.

ITEM 01.3-14 Refer to attached Sheet A-702 – FLOOR FINISH PLAN, ROOM FINISH SCHEDULE – BID OPTION 1, dated

A. Sheet A-702 is hereby revised and re-issued in its entirety to update procurement requirements for EQ11 and EQ12;

and to provide additional information on Door Type, and Head, Jamb, and Sill Detail references included in Bid Option Door Schedule. Replace Sheet A-702 dated 14 June 2022 with attached revised Sheet A-702 dated 28 June 2022.

ITEM 01.3-15 Refer to attached Sheet ES101 – ELECTRICAL SITE PLAN, dated 28 June 2022:

A. Sheet ES101 is hereby revised and re-issued in its entirety to modify linework and associated electrical site work with Sheet Keynotes 12 – 15 for the drop-beam barrier. Replace Sheet ES101 dated 8 June 2022 with attached revised Sheet ES101 dated 28 June 2022.

ITEM 01.3-16 Refer to attached Sheet EP102 – ELECTRICAL POWER PLAN SECTOR TWO, dated 28 June 2022:

A. Sheet EP102 is hereby revised and re-issued in its entirety to modify small errors in acronyms included in Sheet

Keynotes; and to update power requirements for downdraft tables to be included. Replace Sheet EP102 dated 8 June 2022 with attached revised Sheet EP102 dated 28 June 2022.

ITEM 01.3-17 Refer to attached Sheet EP701 – ELECTRICAL PANEL SCHEDULES, dated 28 June 2022:

A. Sheet EP701 is hereby revised and re-issued in its entirety to update power requirements for downdraft tables in electrical panel schedules. Replace Sheet EP701 dated 8 June 2022 with attached revised Sheet EP701 dated

ITEM 01.3-18 Refer to attached Sheet EP702 – ELECTRICAL PANEL SCHEDULES, dated 28 June 2022:

A. Sheet EP702 is hereby revised and re-issued in its entirety to update power requirements for downdraft tables in electrical panel schedules. Replace Sheet EP702 dated 8 June 2022 with attached revised Sheet EP702 dated

BIDDER RFI RESPONSES

ITEM 01.4-1 Refer to attached document – BID RFI QUESTIONS AND RESPONSES, dated 28 June 2022, for responses to Bid RFI Questions received by the A/E as of 23 June 2022.

SUSTITUTION REQUESTS

None.

-- END OF ADDENDUM No. 04 --

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

GENE O.

BROWN

E-47748

OKLAHOMA CITY

OK

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

JOHN T

LITTLE

E-47833

EDMOND

OK

File details come from the government source that posted it. Updated .