25_ITEM 01.3-15_ADD 04_02700ES101.pdf

PDF 457 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR
Solicitation number
W50S9F-22-B-0001
Issued by

About this file

This document provides details for an unrestricted invitation for bid for the construction of an F-35 three bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The solicitation seeks a single firm fixed-price contract for construction services including the complete demolition of an existing building and construction of a new three bay hangar with 31,000 square feet of space. The hangar bays are required to provide pre-conditioned aircraft air, 270 VDC aircraft power, fire suppression, and hangar bay HVAC. Administrative and shop spaces must accommodate future paint booth and composite spaces. Additionally, the facility requires a lightning protection system, fall protection, and an Advantor security system. The contract duration is 550 days from notice to proceed. The bid includes a base CLIN for construction and two option CLINs for a paint/mix addition and aircraft rated pavement. The estimated value is between $25-100 million. Award will be to the responsive and responsible lowest bidder.

View the file

Other files

File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Abstract of Offers.pdf PDF
Questions and Answers 4.pdf PDF
39_ITEM 01.5-1_ADD 03_Bid Question Attachment_2022.06.14.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
22_ITEM 01.3-12_ADD 04_02700A-502.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
24_ITEM 01.3-14_ADD 04_02700A-702.pdf PDF
Questions and Answers 3.pdf PDF
10_ITEM 01.2-10_ADD 04_Section 32 13 14.13.pdf PDF
26_ITEM 01.3-16_ADD 04_02700EP102.pdf PDF
20_ITEM 01.3-10_ADD 04_02700A-140.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
15_ITEM 01.3-5_ADD 04_02700SF105.pdf PDF
23_ITEM 01.3-13_ADD 04_02700A-503.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
11_ITEM 01.3-1_ADD 04_02700C-301.pdf PDF
06_ITEM 01.2-6_ADD 04_Section 08 33 23.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
27_ITEM 01.3-17_ADD 04_02700EP701.pdf PDF
04_ITEM 01.2-4_ADD 04_Section 07 24 00.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
17_ITEM 01.3-7_ADD 04_02700SF503.pdf PDF
02_ITEM 01.2-2_ADD 04_Section 04 20 00.pdf PDF
12_ITEM 01.3-2_ADD 04_02700C-401.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 004 COMBINED DRAWINGS.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
01_ITEM 01.2-1_ADD 03_Section 02 65 00.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
Questions and Answers 2.pdf PDF
07_ITEM 01.2-7_ADD 03_Section 21 13 13.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
18_ITEM 01.3-8_ADD 03_02700SF103.pdf PDF
16_ITEM 01.3-6_ADD 03_02700C-601.pdf PDF
03_ITEM 01.2-3_ADD 03_Section 05 50 13.pdf PDF
09_ITEM 01.2-9_ADD 03_Section 26 05 26.00 40.pdf PDF
Show 40 more

Latest 50 of 147 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

JJ

J

GFI

WP

GFI

WP

F-35 3-BAY HANGAR

J D

J

D

L1-2 - 3,5

L1-2 - 1

2- #6 &1 - #6 EG

2- #6 &1 - #6 EG

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PLAN TRUE

C :\U sers\aoo\D o cum ents\02700_Elec_A O genche .rvt

6/27/2022 1:19: 17 PM

ELECTRICAL SITE PLAN

ES101

WCM

GPN

GPN

SCALE: 1" = 20'-0"

ELECTRICAL SITE PLANA1

GENERAL NOTES

SHEET KEYNOTES

A. UTILITY COMPANY IS RESPONSIBLE FOR PRIMARY

SIDE OF TRANSFORMER CONDUIT AND

CONDUCTORS, TRANSFORMER, TRANSFORMER

PAD, SECONDARY SIDE OF TRANSFORMER

CONDUIT, CONDUCTOR AND FINAL TERMINATIONS

TO DISCONNECTING MEANS IN MAIN

SWITCHBOARD. CONTRACTOR IS RESPONSIBLE

FOR DISCONNECTING MEANS AND CT'S IN

SWITCHBOARD.

B. PROVIDE CONDUITS AND CONTROL WIRES AS

REQUIRED TO ENSURE FUNCTIONALITY OF DROP

BEAM.

C. CONTRACTOR IS RESPONSIBLE FOR VERIFYING

FIELD CONDITIONS PRIOR TO BID DATE.

1. PROPOSED LOCATION FOR BLDG XFMR.

2. PROPOSED ROUTING OF CONDUIT FROM BLDG

XFMR. UTILITY IS RESPONSIBLE FOR ROUTING

CONDUCTORS.

3. NOT USED.

4. NOT USED.

5. NOT USED.

6. 4-4" CONCRETE ENCASED DUCTS FROM EXISTING

TELECOMMUNICATIONS MANHOLE TO MAIN

COMMUNICATIONS ROOM.

7. EXISTING TELECOMMUNICATIONS MANHOLE.

SPLICE EXISTING FIBER AND EXTEND FIBER TO

MAIN COMMUNICATION ROOM.

8. DATA JUNCTION BOX FOR LOW VOLTAGE CABLE

FROM FIRE CONTROL BOX.

9. 1" RIGID STEEL CONDUIT FOR ROUTING LOW

VOLTAGE CABLE FROM SITE VALVE TO CONTROL

BOX. BOX SHALL BE SEALED OFF TO MEET CLASS1

DIV1 REQUIREMENTS.

10. APPROXIMATE LOCATION OF FIRE PANEL

CONTROLLER.TERMINATE CONDUIT INTO BOX.

COORDINATE WITH FIRE PANEL INSTALLER FOR

EXACT LOCATION.

11. POWER FOR SITE VALVE. SEE EP101 FOR DETAILS.

12. DATA JUNCTION BOX FOR LOW VOLTAGE CABLE

FROM MAIN ELECTRICAL ROOM TO GATE

CONTROLS. COORDINATE WITH GATE INSTALLER

FOR EXACT LOCATION OF JUNCTION BOX.

JUNCTION BOX TO BE NEMA 3R RATED.

13. 2" PVC CONDUIT TO ROUTE GATE ASSOCIATED

DATA CABLES TO MAIN ELECTRICAL.TRANSITION TO

RGS INSIDE THE BUILDING.PROVIDE PULLSTRING

AND FABRIC INNERDUCT.

14. 1 1/2 SCHEDULE 40 PVC CONDUIT TO ROUTE

POWER CONDUCTORS TO ASSOCIATED PANEL IN

ELECTRICAL ROOM. TRANSITION TO RGS WHEN

INSIDE THE BUILDING.

15. CIRCUITS TO POWER DROP BEAM. ROUTE IN

CONDUIT DEPICTED IN KEYNOTE 14. JUNCTION

BOXES TO BE NEMA 3R RATED.

16. PAD MOUNTED CT CABINET CFCI. CT CABINET PAD

SHALL BE PROVIDED BY CONTRACTOR PER MG&E

STANDARDS.CONTRACTOR TO COORDINATE WITH

MG&E FOR PAD DETAILS.

17. PROPOSED STUB UP LOCATION FOR MTS-HD.

LOCATE STUB UP UNDER MTS-HD. REFER TO EP601

FOR CONDUIT SIZE.

18. PROPOSED STUB UP LOCATION FOR CONDUITS

SERVING SWITCHBOARD MDP. REFER TO SHEET

EP601 FOR CONDUIT QUANTITY AND SIZES.

19. UNDERGROUND FEEDS FOR MTS-HD.

20. PROPOSE STUB UP LOCATION FOR POWER

CONDUITS GOING TO DROP BEAM.

0 20' 40'

1" = 20'

1 ADDENDUM 2 06/08/2022

2 ADDENDUM 4 06/28/2022

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

JOHN T

LITTLE

E-47833

EDMOND

OK

File details come from the government source that posted it. Updated .