25_ITEM 01.3-15_ADD 04_02700ES101.pdf
PDF 457 KB Posted
- Attached to
- F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
- Solicitation number
- W50S9F-22-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document provides details for an unrestricted invitation for bid for the construction of an F-35 three bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The solicitation seeks a single firm fixed-price contract for construction services including the complete demolition of an existing building and construction of a new three bay hangar with 31,000 square feet of space. The hangar bays are required to provide pre-conditioned aircraft air, 270 VDC aircraft power, fire suppression, and hangar bay HVAC. Administrative and shop spaces must accommodate future paint booth and composite spaces. Additionally, the facility requires a lightning protection system, fall protection, and an Advantor security system. The contract duration is 550 days from notice to proceed. The bid includes a base CLIN for construction and two option CLINs for a paint/mix addition and aircraft rated pavement. The estimated value is between $25-100 million. Award will be to the responsive and responsible lowest bidder.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
JJ
J
GFI
WP
GFI
WP
F-35 3-BAY HANGAR
J D
J
D
L1-2 - 3,5
L1-2 - 1
2- #6 &1 - #6 EG
2- #6 &1 - #6 EG
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021N
N
PLAN TRUE
C :\U sers\aoo\D o cum ents\02700_Elec_A O genche .rvt
6/27/2022 1:19: 17 PM
ELECTRICAL SITE PLAN
ES101
WCM
GPN
GPN
SCALE: 1" = 20'-0"
ELECTRICAL SITE PLANA1
GENERAL NOTES
SHEET KEYNOTES
A. UTILITY COMPANY IS RESPONSIBLE FOR PRIMARY
SIDE OF TRANSFORMER CONDUIT AND
CONDUCTORS, TRANSFORMER, TRANSFORMER
PAD, SECONDARY SIDE OF TRANSFORMER
CONDUIT, CONDUCTOR AND FINAL TERMINATIONS
TO DISCONNECTING MEANS IN MAIN
SWITCHBOARD. CONTRACTOR IS RESPONSIBLE
FOR DISCONNECTING MEANS AND CT'S IN
SWITCHBOARD.
B. PROVIDE CONDUITS AND CONTROL WIRES AS
REQUIRED TO ENSURE FUNCTIONALITY OF DROP
BEAM.
C. CONTRACTOR IS RESPONSIBLE FOR VERIFYING
FIELD CONDITIONS PRIOR TO BID DATE.
1. PROPOSED LOCATION FOR BLDG XFMR.
2. PROPOSED ROUTING OF CONDUIT FROM BLDG
XFMR. UTILITY IS RESPONSIBLE FOR ROUTING
CONDUCTORS.
3. NOT USED.
4. NOT USED.
5. NOT USED.
6. 4-4" CONCRETE ENCASED DUCTS FROM EXISTING
TELECOMMUNICATIONS MANHOLE TO MAIN
COMMUNICATIONS ROOM.
7. EXISTING TELECOMMUNICATIONS MANHOLE.
SPLICE EXISTING FIBER AND EXTEND FIBER TO
MAIN COMMUNICATION ROOM.
8. DATA JUNCTION BOX FOR LOW VOLTAGE CABLE
FROM FIRE CONTROL BOX.
9. 1" RIGID STEEL CONDUIT FOR ROUTING LOW
VOLTAGE CABLE FROM SITE VALVE TO CONTROL
BOX. BOX SHALL BE SEALED OFF TO MEET CLASS1
DIV1 REQUIREMENTS.
10. APPROXIMATE LOCATION OF FIRE PANEL
CONTROLLER.TERMINATE CONDUIT INTO BOX.
COORDINATE WITH FIRE PANEL INSTALLER FOR
EXACT LOCATION.
11. POWER FOR SITE VALVE. SEE EP101 FOR DETAILS.
12. DATA JUNCTION BOX FOR LOW VOLTAGE CABLE
FROM MAIN ELECTRICAL ROOM TO GATE
CONTROLS. COORDINATE WITH GATE INSTALLER
FOR EXACT LOCATION OF JUNCTION BOX.
JUNCTION BOX TO BE NEMA 3R RATED.
13. 2" PVC CONDUIT TO ROUTE GATE ASSOCIATED
DATA CABLES TO MAIN ELECTRICAL.TRANSITION TO
RGS INSIDE THE BUILDING.PROVIDE PULLSTRING
AND FABRIC INNERDUCT.
14. 1 1/2 SCHEDULE 40 PVC CONDUIT TO ROUTE
POWER CONDUCTORS TO ASSOCIATED PANEL IN
ELECTRICAL ROOM. TRANSITION TO RGS WHEN
INSIDE THE BUILDING.
15. CIRCUITS TO POWER DROP BEAM. ROUTE IN
CONDUIT DEPICTED IN KEYNOTE 14. JUNCTION
BOXES TO BE NEMA 3R RATED.
16. PAD MOUNTED CT CABINET CFCI. CT CABINET PAD
SHALL BE PROVIDED BY CONTRACTOR PER MG&E
STANDARDS.CONTRACTOR TO COORDINATE WITH
MG&E FOR PAD DETAILS.
17. PROPOSED STUB UP LOCATION FOR MTS-HD.
LOCATE STUB UP UNDER MTS-HD. REFER TO EP601
FOR CONDUIT SIZE.
18. PROPOSED STUB UP LOCATION FOR CONDUITS
SERVING SWITCHBOARD MDP. REFER TO SHEET
EP601 FOR CONDUIT QUANTITY AND SIZES.
19. UNDERGROUND FEEDS FOR MTS-HD.
20. PROPOSE STUB UP LOCATION FOR POWER
CONDUITS GOING TO DROP BEAM.
0 20' 40'
1" = 20'
1 ADDENDUM 2 06/08/2022
2 ADDENDUM 4 06/28/2022