This is an invitation for bid for construction services. The project involves demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three-bay hangar at Dane County Regional Airport in Madison, Wisconsin to support the F-35 mission. Scope of work includes pre-conditioned aircraft air, 270VDC aircraft power, fire suppression, HVAC, administrative and shop spaces, a lightning protection system, fall protection, and an Advantor security system. The base bid is for construction with options for a paint/mix addition and aircraft-rated pavement. Brand name justification is required for specified systems. The bid opening will be conducted according to FAR. The contract duration is 550 days with award to the responsive and responsible lowest bidder.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Abstract of Offers.pdf PDF
39_ITEM 01.5-1_ADD 03_Bid Question Attachment_2022.06.14.pdf PDF
06_ITEM 01.2-6_ADD 04_Section 08 33 23.pdf PDF
11_ITEM 01.3-1_ADD 04_02700C-301.pdf PDF
12_ITEM 01.3-2_ADD 04_02700C-401.pdf PDF
20_ITEM 01.3-10_ADD 04_02700A-140.pdf PDF
24_ITEM 01.3-14_ADD 04_02700A-702.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
Questions and Answers 2.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 03_2022.06.14_Narrative.pdf PDF
04_ITEM 01.2-4_ADD 03_Section 05 51 33.pdf PDF
17_ITEM 01.3-7_ADD 03_02700SF102.pdf PDF
21_ITEM 01.3-11_ADD 03_02700A-306.pdf PDF
22_ITEM 01.3-12_ADD 03_02700A-307.pdf PDF
26_ITEM 01.3-16_ADD 03_02700A-510.pdf PDF
29_ITEM 01.3-19_ADD 03_02700A-601.pdf PDF
30_ITEM 01.3-20_ADD 03_02700A-602.pdf PDF
GEO TECH REPORT_F-35 Hangar_2020-08-28_FINAL9-10-2020.pdf PDF
08_ITEM 01.2-8_ADD 03_Section 21 13 18.pdf PDF
10_ITEM 01.2-10_ADD 03_Section 26 08 00.pdf PDF
12_ITEM 01.3-2_ADD 03_02700C-100.pdf PDF
25_ITEM 01.3-15_ADD 03_02700A-505.pdf PDF
27_ITEM 01.3-17_ADD 03_02700A-511.pdf PDF
32_ITEM 01.3-22_ADD 03_02700A-702.pdf PDF
35_ITEM 01.3-25_ADD 03_02700FA101.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
22_ITEM 01.3-8_ADD 02_02700SF101.pdf PDF
26_ITEM 01.3-12_ADD 02_02700SF105.pdf PDF
34_ITEM 01.3-20_ADD 02_02700A-202.pdf PDF
44_ITEM 01.3-30_ADD 02_02700EG601.pdf PDF
46_ITEM 01.3-32_ADD 02_02700EP601.pdf PDF
Bid Opening Directions.pdf PDF
02_ITEM 01.2-1_ADD 02_PROJECT TOC.pdf PDF
08_ITEM 01.2-9_ADD 02_Section 08 87 35.pdf PDF
17_ITEM 01.3-3_ADD 02_02700C-301.pdf PDF
27_ITEM 01.3-13_ADD 02_02700SF106.pdf PDF
39_ITEM 01.3-25_ADD 02_02700FA101.pdf PDF
40_ITEM 01.3-26_ADD 02_02700FA102.pdf PDF
41_ITEM 01.3-27_ADD 02_02700FA601.pdf PDF
47_ITEM 01.3-33_ADD 02_02700EP701.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
ATTACHMENT 7 - 20220208 Single Source Determination - Monaco - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANG/WI – F-35: 3-Bay Specialized Hangar 20202700F353BAY

Addendum No. 03 14 June 2022

SECTION 08 71 00 Page 1

SECTION 08 71 00 – DOOR HARDWARE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes:

1. Mechanical and electrified door hardware for:

a. Swinging doors.

b. Sliding doors.

c. Gates.

2. Electronic access control system components, including:

a. Electronic access control devices.

3. Field verification, preparation and modification of existing doors and frames to receive new door hardware.

4. Lead-lining door hardware items required for radiation protection at door openings.

B. Exclusions: Unless specifically listed in hardware sets, hardware is not specified in this section for:

1. Windows

2. Cabinets (casework), including locks in cabinets

3. Signage

4. Toilet accessories

5. Overhead doors

C. Related Sections:

1. Division 01 Section “Alternates” for alternates affecting this section.

2. Division 07 Section “Joint Sealants” for sealant requirements applicable to threshold installation specified in this section.

3. Division 09 sections for touchup finishing or refinishing of existing openings modified by this section.

4. Division 13 Section “Radiation Protection” for requirements for lead-lining for door hardware at openings indicated to receive radiation protection.

5. Division 26 sections for connections to electrical power system and for low-voltage wiring.

SECTION 08 71 00 Page 2

6. Division 28 sections for coordination with other components of electronic access control system.

1.3 REFERENCES

A. UL - Underwriters Laboratories

1. UL 10B - Fire Test of Door Assemblies

2. UL 10C - Positive Pressure Test of Fire Door Assemblies

3. UL 1784 - Air Leakage Tests of Door Assemblies

4. UL 305 - Panic Hardware

B. DHI - Door and Hardware Institute

1. Sequence and Format for the Hardware Schedule

2. Recommended Locations for Builders Hardware

3. Key Systems and Nomenclature

C. ANSI - American National Standards Institute

1. ANSI/BHMA A156.1 - A156.29, and ANSI/BHMA A156.31 - Standards for Hardware and Specialties

1.4 SUBMITTALS

A. General:

1. Submit in accordance with Conditions of Contract and Division 01 requirements.

2. Highlight, encircle, or otherwise specifically identify on submittals deviations from Contract Documents, issues of incompatibility or other issues which may detrimentally affect the Work.

3. Prior to forwarding submittal, comply with procedures for verifying existing door and frame compatibility for new hardware, as specified in PART 3, “EXAMINATION” article, herein.

B. Action Submittals:

1. Product Data: Product data including manufacturers’ technical product data for each item of door hardware, installation instructions, maintenance of operating parts and finish, and other information necessary to show compliance with requirements.

2. Riser and Wiring Diagrams: After final approval of hardware schedule, submit details of electrified door hardware, indicating:

a. Wiring Diagrams: For power, signal, and control wiring and including:

1) Details of interface of electrified door hardware and building safety and security systems.

2) Schematic diagram of systems that interface with electrified door hardware.

3) Point-to-point wiring.

4) Risers.

SECTION 08 71 00 Page 3

3. Samples for Verification: If requested by Architect, submit production sample or sample installations of each type of exposed hardware unit in finish indicated, and tagged with full description for coordination with schedule.

a. Samples will be returned to supplier in like-new condition.

Units that are acceptable to Architect may, after final check of operations, be incorporated into Work, within limitations of key coordination requirements.

4. Door Hardware Schedule: Submit schedule with hardware sets in vertical format as illustrated by Sequence of Format for the

Hardware Schedule as published by the Door and Hardware

Institute. Indicate complete designations of each item required for each door or opening, include:

a. Door Index; include door number, heading number, and Architects hardware set number.

b. Opening Lock Function Spreadsheet: List locking device and function for each opening.

c. Type, style, function, size, and finish of each hardware item.

d. Name and manufacturer of each item.

e. Fastenings and other pertinent information.

f. Location of each hardware set cross-referenced to indications on Drawings.

g. Explanation of all abbreviations, symbols, and codes contained in schedule.

h. Mounting locations for hardware.

i. Door and frame sizes and materials.

j. Name and phone number for local manufacturer's representative for each product.

k. Operational Description of openings with any electrified hardware (locks, exits, electromagnetic locks, electric strikes, automatic operators, door position switches, magnetic holders or closer/holder units, and access control components). Operational description should include how door will operate on egress, ingress, and fire and smoke alarm connection.

1) Submittal Sequence: Submit door hardware schedule concurrent with submissions of Product Data, Samples, and

Shop Drawings. Coordinate submission of door hardware schedule with scheduling requirements of other work to facilitate fabrication of other work that is critical in

Project construction schedule.

5. Key Schedule:

a. After Keying Conference, provide keying schedule listing levels of keying as well as explanation of key system's function, key symbols used, and door numbers controlled.

b. Use ANSI/BHMA A156.28 “Recommended Practices for Keying Systems” as guideline for nomenclature, definitions, and approach for selecting optimal keying system.

c. Provide 3 copies of keying schedule for review prepared and detailed in accordance with referenced DHI publication.

Include schematic keying diagram and index each key to unique door designations.

SECTION 08 71 00 Page 4

d. Index keying schedule by door number, keyset, hardware heading number, cross keying instructions, and special key stamping instructions.

e. Provide one complete bitting list of key cuts and one key system schematic illustrating system usage and expansion.

1) Forward bitting list, key cuts and key system schematic directly to Owner, by means as directed by Owner.

f. Prepare key schedule by or under supervision of supplier, detailing Owner’s final keying instructions for locks.

6. Templates: After final approval of hardware schedule, provide templates for doors, frames and other work specified to be factory prepared for door hardware installation.

C. Informational Submittals:

1. Qualification Data: For Supplier, Installer and Architectural Hardware Consultant.

2. Product Certificates for electrified door hardware, signed by manufacturer:

a. Certify that door hardware approved for use on types and sizes of labeled fire-rated doors complies with listed fire-rated door assemblies.

3. Certificates of Compliance:

a. Certificates of compliance for fire-rated hardware and installation instructions if requested by Architect or

Authority Having Jurisdiction.

b. Installer Training Meeting Certification: Letter of compliance, signed by Contractor, attesting to completion of installer training meeting specified in “QUALITY ASSURANCE” article, herein.

c. Electrified Hardware Coordination Conference Certification:

Letter of compliance, signed by Contractor, attesting to completion of electrified hardware coordination conference, specified in “QUALITY ASSURANCE” article, herein.

4. Product Test Reports: For compliance with accessibility requirements, based on evaluation of comprehensive tests performed by manufacturer and witnessed by qualified testing agency, for door hardware on doors located in accessible routes.

5. Warranty: Special warranty specified in this Section.

D. Closeout Submittals:

1. Operations and Maintenance Data : Provide in accordance with Division 01 and include:

a. Complete information on care, maintenance, and adjustment;

data on repair and replacement parts, and information on preservation of finishes.

b. Catalog pages for each product.

c. Name, address, and phone number of local representative for each manufacturer.

d. Parts list for each product.

SECTION 08 71 00 Page 5

e. Final approved hardware schedule, edited to reflect conditions as-installed.

f. Final keying schedule

g. Copies of floor plans with keying nomenclature

h. As-installed wiring diagrams for each opening connected to power, both low voltage and 110 volts.

i. Copy of warranties including appropriate reference numbers for manufacturers to identify project.

1.5 QUALITY ASSURANCE

A. Product Substitutions: Comply with product requirements stated in Division 01 and as specified herein.

1. Where specific manufacturer’s product is named and accompanied by “No Substitute,” including make or model number or other designation, provide product specified. (Note: Certain products have been selected for their unique characteristics and particular project suitability.)

a. Where no additional products or manufacturers are listed in product category, requirements for “No Substitute” govern product selection.

2. Where products indicate “acceptable manufacturers” or “acceptable manufacturers and products”, provide product from specified manufacturers, subject to compliance with specified requirements and “Single Source Responsibility” requirements stated herein.

B. Supplier Qualifications and Responsibilities: Recognized architectural hardware supplier with record of successful in-service performance for supplying door hardware similar in quantity, type, and quality to that indicated for this Project and that provides certified Architectural Hardware Consultant (AHC) available to

Owner, Architect, and Contractor, at reasonable times during the

Work for consultation.

1. Warehousing Facilities: In Project's vicinity.

2. Scheduling Responsibility: Preparation of door hardware and keying schedules.

3. Engineering Responsibility: Preparation of data for electrified door hardware, including Shop Drawings, based on testing and engineering analysis of manufacturer's standard units in assemblies similar to those indicated for this Project.

4. Coordination Responsibility: Coordinate installation of electronic security hardware with Architect and electrical engineers and provide installation and technical data to

Architect and other related subcontractors.

a. Upon completion of electronic security hardware installation, inspect and verify that all components are working properly.

C. Installer Qualifications: Qualified tradesmen, skilled in application of commercial grade hardware with record of successful in-service performance for installing door hardware similar in quantity, type, and quality to that indicated for this Project.

SECTION 08 71 00 Page 6

D. Architectural Hardware Consultant Qualifications: Person who is experienced in providing consulting services for door hardware installations that are comparable in material, design, and extent to that indicated for this Project and meets these requirements:

1. For door hardware, DHI-certified, Architectural Hardware Consultant (AHC).

2. Can provide installation and technical data to Architect and other related subcontractors.

3. Can inspect and verify components are in working order upon completion of installation.

4. Capable of producing wiring diagrams.

5. Capable of coordinating installation of electrified hardware with

Architect and electrical engineers.

E. Single Source Responsibility: Obtain each type of door hardware from single manufacturer.

1. Provide electrified door hardware from same manufacturer as mechanical door hardware, unless otherwise indicated.

2. Manufacturers that perform electrical modifications and that are listed by testing and inspecting agency acceptable to authorities having jurisdiction are acceptable.

F. Fire-Rated Door Openings: Provide door hardware for fire-rated openings that complies with NFPA 80 and requirements of authorities having jurisdiction. Provide only items of door hardware that are listed and are identical to products tested by Underwriters

Laboratories, Intertek Testing Services, or other testing and inspecting organizations acceptable to authorities having jurisdiction for use on types and sizes of doors indicated, based on testing at positive pressure and according to NFPA 252 or UL 10C and in compliance with requirements of fire-rated door and door frame labels.

G. Smoke- and Draft-Control Door Assemblies: Where smoke- and draft-control door assemblies are required, provide door hardware that meets requirements of assemblies tested according to UL 1784 and installed in compliance with NFPA 105.

1. Air Leakage Rate: Maximum air leakage of 0.3 cfm/sq. ft. (3

cu. m per minute/sq. m) at tested pressure differential of 0.3-inch wg (75 Pa) of water.

H. Electrified Door Hardware: Listed and labeled as defined in NFPA 70, Article 100, by testing agency acceptable to authorities having jurisdiction.

I. Means of Egress Doors: Latches do not require more than 15 lbf (67 N) to release latch. Locks do not require use of key, tool, or special knowledge for operation.

J. Accessibility Requirements: For door hardware on doors in an accessible route, comply with governing accessibility regulations cited in “REFERENCES” article, herein.

SECTION 08 71 00 Page 7

1. Provide operating devices that do not require tight grasping, pinching, or twisting of wrist and that operate with force of not more than 5 lbf (22.2 N).

2. Maximum opening-force requirements:

a. Interior, Non-Fire-Rated Hinged Doors: 5 lbf (22.2 N) applied perpendicular to door.

b. Sliding or Folding Doors: 5 lbf (22.2 N) applied parallel to door at latch.

c. Fire Doors: Minimum opening force allowable by authorities having jurisdiction.

3. Bevel raised thresholds with slope of not more than 1:2. Provide thresholds not more than 1/2 inch (13 mm) high.

4. Adjust door closer sweep periods so that, from open position of 70 degrees, door will take at least 3 seconds to move to 3 inches

(75 mm) from latch, measured to leading edge of door.

K. Keying Conference: Conduct conference at Project site to comply with requirements in Division 01.

1. Attendees: Owner, Contractor, Architect, Installer, Owner's security consultant, and Supplier’s Architectural Hardware

Consultant.

2. Incorporate keying conference decisions into final keying schedule after reviewing door hardware keying system including:

a. Function of building, flow of traffic, purpose of each area, degree of security required, and plans for future expansion.

b. Preliminary key system schematic diagram.

c. Requirements for key control system.

d. Requirements for access control.

e. Address for delivery of keys.

L. Pre-installation Conference: Conduct conference at Project site.

1. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

2. Inspect and discuss preparatory work performed by other trades.

3. Inspect and discuss electrical roughing-in for electrified door hardware.

4. Review sequence of operation for each type of electrified door hardware.

5. Review required testing, inspecting, and certifying procedures.

M. Coordination Conferences:

1. Installation Coordination Conference: Prior to hardware installation, schedule and hold meeting to review questions or concerns related to proper installation and adjustment of door hardware.

a. Attendees: Door hardware supplier, door hardware installer, Contractor.

b. After meeting, provide letter of compliance to Architect, indicating when meeting was held and who was in attendance.

SECTION 08 71 00 Page 8

2. Electrified Hardware Coordination Conference: Prior to ordering electrified hardware, schedule and hold meeting to coordinate door hardware with security, electrical, doors and frames, and other related suppliers.

a. Attendees: electrified door hardware supplier, doors and frames supplier, electrified door hardware installer, electrical subcontractor, Owner, Owner’s security consultant, Architect and Contractor.

b. After meeting, provide letter of compliance to Architect, indicating when coordination conference was held and who was in attendance.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Inventory door hardware on receipt and provide secure lock-up for hardware delivered to Project site.

B. Tag each item or package separately with identification coordinated with final door hardware schedule, and include installation instructions, templates, and necessary fasteners with each item or package.

1. Deliver each article of hardware in manufacturer’s original packaging.

C. Project Conditions:

1. Maintain manufacturer-recommended environmental conditions throughout storage and installation periods.

2. Provide secure lock-up for door hardware delivered to Project, but not yet installed. Control handling and installation of hardware items so that completion of Work will not be delayed by hardware losses both before and after installation.

D. Protection and Damage:

1. Promptly replace products damaged during shipping.

2. Handle hardware in manner to avoid damage, marring, or scratching. Correct, replace or repair products damaged during

Work.

3. Protect products against malfunction due to paint, solvent, cleanser, or any chemical agent.

E. Deliver keys to manufacturer of key control system for subsequent delivery to Owner.

F. Deliver keys to Owner by registered mail or overnight package service.

1.7 COORDINATION

A. Coordinate layout and installation of floor-recessed door hardware with floor construction. Cast anchoring inserts into concrete.

SECTION 08 71 00 Page 9

Concrete, reinforcement, and formwork requirements are specified in

Division 03.

B. Installation Templates: Distribute for doors, frames, and other work specified to be factory prepared. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements.

C. Security: Coordinate installation of door hardware, keying, and access control with Owner's security consultant.

D. Electrical System Roughing-In: Coordinate layout and installation of electrified door hardware with connections to power supplies and building safety and security systems.

E. Existing Openings: Where hardware components are scheduled for application to existing construction or where modifications to existing door hardware are required, field verify existing conditions and coordinate installation of door hardware to suit opening conditions and to provide proper door operation.

F. Direct shipments not permitted, unless approved by Contractor.

1.8 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Years from date of Substantial Completion, for durations indicated.

a. Closers:

1) Mechanical: 30 years.

b. Automatic Operators: 2 year.

c. Exit Devices:

1) Mechanical: 3 years.

2) Electrified: 1 year.

d. Locksets:

1) Mechanical: 3 years.

2) Electrified: 1 year.

e. Key Blanks: Lifetime

2. Warranty does not cover damage or faulty operation due to improper installation, improper use or abuse.

1.9 MAINTENANCE

A. Maintenance Tools:

SECTION 08 71 00 Page 10

1. Furnish complete set of special tools required for maintenance and adjustment of hardware, including changing of cylinders.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. The Owner requires use of certain products for their unique characteristics and particular project suitability to insure continuity of existing and future performance and maintenance standards. After investigating available product offerings, the

Awarding Authority has elected to prepare proprietary specifications. These products are specified with the notation: “No

Substitute.”

1. Where “No Substitute” is noted, submittals and substitution requests for other products will not be considered.

B. Approval of manufacturers and/or products other than those listed as ”Scheduled Manufacturer ” or “Acceptable Manufacturers” in the individual article for the product category shall be in accordance with QUALITY ASSURANCE article, herein.

C. Approval of products from manufacturers indicated in “Acceptable Manufacturers” is contingent upon those products providing all functions and features and meeting all requirements of scheduled manufacturer’s product.

D. Hand of Door: Drawings show direction of slide, swing, or hand of each door leaf. Furnish each item of hardware for proper installation and operation of door movement as shown.

E. Where specified hardware is not adaptable to finished shape or size of members requiring hardware, furnish suitable types having same operation and quality as type specified, subject to Architect's approval.

2.2 MATERIALS

A. Fasteners

1. Provide hardware manufactured to conform to published templates, generally prepared for machine screw installation.

2. Furnish screws for installation with each hardware item. Finish exposed (exposed under any condition) screws to match hardware finish, or, if exposed in surfaces of other work, to match finish of this other work including prepared for paint surfaces to receive painted finish.

3. Provide concealed fasteners for hardware units exposed when door is closed except when no standard units of type specified are available with concealed fasteners. Do not use thru-bolts for installation where bolt head or nut on opposite face is exposed in other work unless thru-bolts are required to fasten hardware

SECTION 08 71 00 Page 11 securely. Review door specification and advise Architect if thru-bolts are required.

4. Install hardware with fasteners provided by hardware manufacturer.

B. Provide screws, bolts, expansion shields, drop plates and other devices necessary for hardware installation.

1. Where fasteners are exposed to view: Finish to match adjacent door hardware material.

C. Cable and Connectors: Hardwired Electronic Access Control Lockset and Exit Device Trim:

1. Data: 24AWG, 4 conductor shielded, Belden 9843, 9841 or comparable.

2. DC Power: 18 AWG, 2 conductor, Belden 8760 or comparable.

3. Provide type of data and DC power cabling required by access control device manufacturer for this installation.

4. Where scheduled in the hardware sets, provide each item of electrified hardware and wire harnesses with sufficient number and wire gauge with standardized Molex plug connectors to accommodate electric function of specified hardware. Provide

Molex connectors that plug directly into connectors from harnesses, electric locking and power transfer devices. Provide through-door wire harness for each electrified locking device installed in a door and wire harness for each electrified hinge, electrified continuous hinge, electrified pivot, and electric power transfer for connection to power supplies.

2.3 HINGES

A. Manufacturers and Products:

1. Scheduled Manufacturer and Product: Ives 5BB series

2. Acceptable Manufacturers and Products: Hager, ABH, McKinney

B. Requirements:

1. Provide five-knuckle, ball bearing hinges conforming to ANSI/BHMA A156.1.

2. 1-3/4 inch (44 mm) thick doors, up to and including 36 inches (914 mm) wide:

a. Exterior: Standard weight, bronze or stainless steel, 4-1/2 inches (114 mm) high

b. Interior: Standard weight, steel, 4-1/2 inches (114 mm) high

3. 1-3/4 inch (44 mm) thick doors over 36 inches (914 mm) wide:

a. Exterior: Heavy weight, bronze/stainless steel, 5 inches (127

mm) high

b. Interior: Heavy weight, steel, 5 inches (127 mm) high

4. 2 inches or thicker doors:

SECTION 08 71 00 Page 12

a. Exterior: Heavy weight, bronze or stainless steel, 5 inches (127 mm) high

b. Interior: Heavy weight, steel, 5 inches (127 mm) high

5. Provide three hinges per door leaf for doors 90 inches (2286 mm) or less in height, and one additional hinge for each 30 inches

(762 mm) of additional door height.

6. Where new hinges are specified for existing doors or existing frames, provide new hinges of identical size to hinge preparation present in existing door or existing frame.

7. Hinge Pins: Except as otherwise indicated, provide hinge pins as follows:

a. Steel Hinges: Steel pins

b. Non-Ferrous Hinges: Stainless steel pins

c. Out-Swinging Exterior Doors: Non-removable pins

d. Out-Swinging Interior Lockable Doors: Non-removable pins

e. Interior Non-lockable Doors: Non-rising pins

8. Width of hinges: 4-1/2 inches (114 mm) at 1-3/4 inch (44 mm) thick doors, and 5 inches (127 mm) at 2 inches (51 mm) or thicker doors. Adjust hinge width as required for door, frame, and wall conditions to allow proper degree of opening.

9. Doors 36 inches (914 mm) wide or less furnish hinges 4-1/2 inches (114 mm) high; doors greater than 36 inches (914 mm) wide furnish hinges 5 inches (127 mm) high, heavy weight or standard weight as specified.

10. Provide hinges with electrified options as scheduled in the hardware sets. Provide with sufficient number and wire gage to accommodate electric function of specified hardware. Locate electric hinge at second hinge from bottom or nearest to electrified locking component.

11. Provide mortar guard for each electrified hinge specified.

12. Provide spring hinges where specified. Provide two spring hinges and one bearing hinge per door leaf for doors 90 inches (2286 mm) or less in height.

Provide one additional bearing hinge for each 30 inches (762 mm) of additional door height.

13. Provide continuous hinges where specified.

2.4 MORTISE LOCKS – GRADE 1

A. Manufacturers and Products:

1. Scheduled Manufacturer and Product: Schlage

2. Acceptable Manufacturers and Products:

B. Requirements:

1. Provide Mortise locks conforming to the following standards and requirements:

a. ANSI/BHMA, Grade 1.

b. UL 10C for 4’-0” x 10’-0” 3-hour fire door.

SECTION 08 71 00 Page 13

c. Florida Building Code (ASTM E330, E1886, E1996) and Miami Dade (TAS 201, 202, 203) requirements for hurricanes.

2. Cylinders: Refer to “KEYING” article, herein.

3. Provide locks with standard latch throw. Provide proper latch throw for UL listing at pairs.

4. Provide independently operating levers with two external return spring cassettes to prevent lever sag.

5. Provide standard ASA strikes unless extended lip strikes are necessary to protect trim.

6. Provide electrified options as scheduled in the hardware sets.

2.5 EXIT DEVICES

LOW PROFILE PUSH BAR EXIT DEVICES

A. Manufacturers and Products:

1. Scheduled Manufacturer and Product: VON Duprin

2. Acceptable Manufacturers:

B. The maximum exit device projection shall be a maximum of 3-1/16” when activated. The exit device bar shall have an average minimum thickness of .201”. The push pad surface shall be constructed of stainless steel; push pads with plastic or Lexan coatings shall not be acceptable. Nylon bearings and stainless steel springs shall be used for long life and durability. Only torsion or compression springs are acceptable. Extension type springs are not acceptable.

All device covers shall be of cast brass, deep drawn steel or stainless steel. Latchbolts shall be of stainless steel and shall have a deadlocking latch for extra security, except at full-glass or two-light glass doors requiring narrow stile device. Mounting screws shall be concealed to deter tampering. All ferrous parts shall be zinc coated to prevent rusting.

C. Single point, one quarter turn hex dogging shall be standard on panic listed devices. Optional key cylinder dogging shall be available, and furnished if so indicated in the hardware sets, on panic listed devices. Devices with hex key dogging shall be easily field converted to cylinder dogging.

D. All devices shall be listed by Underwriters Laboratories for safety as panic hardware. Fire rated devices shall be UL listed for A label and lesser class doors, 4’ x 8’ single and 8 x 8’ pair. The model number shall be located on the end cap; devices having the model number located other than on the end cap shall not be acceptable.

E. All exit devices shall have a unitized installation feature and may be cut in the field to size. Devices shall be closed on all sides with no pinch points. The push pad shall be designed to prevent pinching of the fingers when depressed.

SECTION 08 71 00 Page 14

F. Exit Device trim to be through bolted. Lever trim to be heavy duty forged escutcheon with free-wheeling levers.

G. All exit devices shall conform to Federal Specification FF-H-1820, and be certified as meeting ANSI A156.3, Grade 1 requirements.

2.6 CYLINDERS

A. Manufacturers:

1. Scheduled Manufacturer: Schlage

2. Acceptable Manufacturers:

B. Requirements:

1. Provide FSIC permanent cylinders/cores key system, compliant with ANSI/BHMA A156.5; latest revision, Section 12, Grade 1; permanent cylinders; cylinder face finished to match lockset, manufacturer’s series as indicated. Refer to “KEYING” article, herein.

2. Replaceable Construction Cores.

a. Provide temporary construction cores replaceable by permanent cores, furnished in accordance with the following requirements.

1) 3 construction control keys

2) 12 construction change (day) keys.

b. Owner or Owner’s Representative will replace temporary construction cores with permanent cores.

2.7 KEYING

A. Provide a factory registered keying system, complying with guidelines in ANSI/BHMA A156.28, incorporating decisions made at keying conference.

B. Provide cylinders/cores keyed into Owner’s existing factory registered keying system, complying with guidelines in

ANSI/BHMA A156.28, incorporating decisions made at keying conference.

C. Requirements:

1. Provide permanent cylinders/cores keyed by the manufacturer according to the following key system.

a. Master Keying system as directed by the Owner.

2. Forward bitting list and keys separately from cylinders, by means as directed by Owner. Failure to comply with forwarding requirements shall be cause for replacement of cylinders/cores involved at no additional cost to Owner.

3. Provide keys with the following features:

SECTION 08 71 00 Page 15

a. Material: Nickel silver; minimum thickness of .107-inch (2.3mm)

b. Patent Protection: Keys and blanks protected by one or more utility patent(s).

4. Identification:

a. Mark permanent cylinders/cores and keys with applicable blind code per DHI publication “Keying Systems and Nomenclature” for identification. Blind code marks shall not include actual key cuts.

b. Identification stamping provisions must be approved by the Architect and Owner.

c. Stamp cylinders/cores and keys with Owner’s unique key system facility code as established by the manufacturer; key symbol and embossed or stamped with “DO NOT DUPLICATE” along with the

“PATENTED” or patent number to enforce the patent protection.

d. Failure to comply with stamping requirements shall be cause for replacement of keys involved at no additional cost to

Owner.

e. Forward permanent cylinders/cores to Owner, separately from keys, by means as directed by Owner.

5. Quantity: Furnish in the following quantities.

a. Change (Day) Keys: 3 per cylinder/core.

b. Master Keys: 6.

c. Control keys: 3.

2.8 KEY CONTROL SYSTEM

A. Manufacturers:

1. Scheduled Manufacturer: Telkee

2. Acceptable Manufacturers: HPC, Lund

B. Requirements:

1. Provide key control system, including envelopes, labels, tags with self-locking key clips, receipt forms, 3-way visible card index, temporary markers, permanent markers, and standard metal cabinet, all as recommended by system manufacturer, with capacity for 150% of number of locks required for Project.

a. Provide complete cross index system set up by hardware supplier, and place keys on markers and hooks in cabinet as determined by final key schedule.

b. Provide hinged-panel type cabinet for wall mounting.

2.9 DOOR CLOSERS

A. Manufacturers and Products:

1. Scheduled Manufacturer and Product: LCN

2. Acceptable Manufacturers:

SECTION 08 71 00 Page 16

B. Requirements:

1. Provide door closers conforming to ANSI/BHMA A156.4 Grade 1 requirements by BHMA certified independent testing laboratory.

2. Provide door closers with fully hydraulic, full rack and pinion action cast iron cylinder.

3. Closer Body: 1-1/4 inch (32 mm) diameter, with 5/8 inch (16 mm) diameter heat-treated pinion journal.

4. Hydraulic Fluid: Fireproof, passing requirements of UL10C, and requiring no seasonal closer adjustment for temperatures ranging from 120 degrees F to -30 degrees F.

5. Spring Power: Continuously adjustable over full range of closer sizes, and providing reduced opening force as required by accessibility codes and standards. Cylinder body to have “FAST” power adjust speed dial to visually indicate spring power.

6. Hydraulic Regulation: By tamper-proof, non-critical valves, with separate adjustment for latch speed, general speed, and backcheck.

7. Pressure Relief Valve (PRV) Technology: not permitted.

8. Provide special templates, drop plates, mounting brackets, or adapters for arms as required for details, overhead stops, and other door hardware items interfering with closer mounting.

2.10 DOOR TRIM

A. Manufacturers:

1. Scheduled Manufacturer: Ives

2. Acceptable Manufacturers: Burns, Trimco

B. Requirements:

1. Provide push plates 4 inches (102 mm) wide by 16 inches (406 mm) high by 0.050 inch (1 mm) thick and beveled 4 edges. Where width of door stile prevents use of 4 inches (102 mm) wide plate, adjust width to fit.

2. Provide push bars of solid bar stock, diameter and length as scheduled. Provide push bars of sufficient length to span from center to center of each stile. Where required, mount back to back with pull.

3. Provide offset pulls of solid bar stock, diameter and length as scheduled. Where required, mount back to back with push bar.

4. Provide flush pulls as scheduled. Where required, provide back-to-back mounted model.

5. Provide pulls of solid bar stock, diameter and length as scheduled. Where required, mount back to back with push bar.

6. Provide pull plates 4 inches (102 mm) wide by 16 inches (406 mm) high by 0.050 inch (1 mm) thick, beveled 4 edges, and prepped for pull. Where width of door stile prevents use of 4 inches (102

mm) wide plate, adjust width to fit.

7. Provide wire pulls of solid bar stock, diameter and length as scheduled.

8. Provide decorative pulls as scheduled. Where required, mount back to back with pull.

SECTION 08 71 00 Page 17

2.11 PROTECTION PLATES

A. Manufacturers:

1. Scheduled Manufacturer: Ives

2. Acceptable Manufacturers: Burns, Trimco

B. Requirements:

1. Provide kick plates, mop plates, and armor plates minimum of

0.050 inch (1 mm) thick, beveled four edges as scheduled.

Furnish with sheet metal or wood screws, finished to match plates.

2. Sizes of plates:

a. Kick Plates: 10 inches (254 mm) high by 2 inches (51 mm) less width of door on single doors, 1 inch (25 mm) less width of door on pairs

b. Mop Plates: 4 inches (102 mm) high by 2 inches (51 mm) less width of door on single doors, 1 inch (25 mm) less width of door on pairs

c. Armor Plates: 36 inches (914 mm) high by 2 inches (51 mm) less width of door on single doors, 1 inch (25 mm) less width of door on pairs

2.12 OVERHEAD STOPS AND OVERHEAD STOP/HOLDERS

A. Manufacturers:

1. Scheduled Manufacturers: Glynn-Johnson

B. Requirements:

1. Provide heavy duty concealed mounted overhead stop or holder as specified for exterior and interior vestibule single acting doors.

2. Provide heavy duty concealed mounted overhead stop or holder as specified for double acting doors.

3. Provide heavy or medium duty and concealed or surface mounted overhead stop or holder for interior doors as specified. Provide medium duty surface mounted overhead stop for interior doors and at any door that swings more than 140 degrees before striking wall, open against equipment, casework, sidelights, and where conditions do not allow wall stop or floor stop presents tripping hazard.

4. Where overhead holders are specified provide friction type at doors without closer and positive type at doors with closer.

2.13 DOOR STOPS AND HOLDERS

A. Manufacturers:

1. Scheduled Manufacturer: Ives

2. Acceptable Manufacturers: Burns, Trimco

SECTION 08 71 00 Page 18

B. Provide door stops at each door leaf:

1. Provide wall stops wherever possible. Provide convex type where mortise type locks are used and concave type where cylindrical type locks are used.

2. Where a wall stop cannot be used, provide universal floor stops for low or high rise options.

3. Where wall or floor stop cannot be used, provide medium duty surface mounted overhead stop.

2.14 THRESHOLDS, SEALS, DOOR SWEEPS, AUTOMATIC DOOR BOTTOMS, AND GASKETING

A. Manufacturers:

1. Scheduled Manufacturer: Zero International

2. Acceptable Manufacturers: National Guard, Reese

B. Requirements:

1. Provide thresholds, weather-stripping (including door sweeps, seals, and astragals) and gasketing systems (including smoke, sound, and light) as specified and per architectural details.

Match finish of other items.

2. Size of thresholds:

a. Saddle Thresholds: 1/2 inch (13 mm) high by jamb width by door width

b. Bumper Seal Thresholds: 1/2 inch (13 mm) high by 5 inches (127

mm) wide by door width

3. Provide door sweeps, seals, astragals, and auto door bottoms only of type where resilient or flexible seal strip is easily replaceable and readily available.

2.15 SILENCERS

A. Manufacturers:

1. Scheduled Manufacturer: Ives

2. Acceptable Manufacturers: Burns, Trimco

B. Requirements:

1. Provide "push-in" type silencers for hollow metal or wood frames.

2. Provide one silencer per 30 inches (762 mm) of height on each single frame, and two for each pair frame.

3. Omit where gasketing is specified.

2.16 FINISHES

A. Finish: BHMA 626/652 (US26D); except:

1. Hinges at Exterior Doors: BHMA 630 (US32D)

2. Continuous Hinges: BHMA 630 (US32D)

SECTION 08 71 00 Page 19

3. Continuous Hinges: BHMA 628 (US28)

4. Push Plates, Pulls, and Push Bars: BHMA 630 (US32D)

5. Protection Plates: BHMA 630 (US32D)

6. Overhead Stops and Holders: BHMA 630 (US32D)

7. Door Closers: Powder Coat to Match

8. Wall Stops: BHMA 630 (US32D)

9. Latch Protectors: BHMA 630 (US32D)

10. Weatherstripping: Clear

Anodized Aluminum

11. Thresholds: Mill Finish

Aluminum

PART 3 - EXECUTION

3.1 EXAMINATION

A. Prior to installation of hardware, examine doors and frames, with Installer present, for compliance with requirements for installation tolerances, labeled fire-rated door assembly construction, wall and floor construction, and other conditions affecting performance.

B. Existing Door and Frame Compatibility: Field verify existing doors and frames receiving new hardware and existing conditions receiving new openings. Verify that new hardware is compatible with existing door and frame preparation and existing conditions.

C. Examine roughing-in for electrical power systems to verify actual locations of wiring connections before electrified door hardware installation.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Where on-site modification of doors and frames is required:

1. Carefully remove existing door hardware and components being reused. Clean, protect, tag, and store in accordance with storage and handling requirements specified herein.

2. Field modify and prepare existing door and frame for new hardware being installed.

3. When modifications are exposed to view, use concealed fasteners, when possible.

4. Prepare hardware locations and reinstall in accordance with installation requirements for new door hardware and with:

a. Steel Doors and Frames: For surface applied door hardware, drill and tap doors and frames according to ANSI/SDI A250.6.

b. Wood Doors: DHI WDHS.5 "Recommended Hardware Reinforcement Locations for Mineral Core Wood Flush Doors."

c. Doors in rated assemblies: NFPA 80 for restrictions on on-site door hardware preparation.

SECTION 08 71 00 Page 20

3.3 INSTALLATION

A. Mounting Heights: Mount door hardware units at heights to comply with the following, unless otherwise indicated or required to comply with governing regulations.

1. Standard Steel Doors and Frames: ANSI/SDI A250.8.

2. Custom Steel Doors and Frames: HMMA 831.

3. Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural

Hardware for Wood Flush Doors."

B. Install each hardware item in compliance with manufacturer’s instructions and recommendations, using only fasteners provided by manufacturer.

C. Do not install surface mounted items until finishes have been completed on substrate. Protect all installed hardware during painting.

D. Set units level, plumb and true to line and location. Adjust and reinforce attachment substrate as necessary for proper installation and operation.

E. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors according to industry standards.

F. Install operating parts so they move freely and smoothly without binding, sticking, or excessive clearance.

G. Hinges: Install types and in quantities indicated in door hardware schedule but not fewer than quantity recommended by manufacturer for application indicated or one hinge for every 30 inches (750 mm) of door height, whichever is more stringent, unless other equivalent means of support for door, such as spring hinges or pivots, are provided.

H. Intermediate Offset Pivots: Where offset pivots are indicated, provide intermediate offset pivots in quantities indicated in door hardware schedule but not fewer than one intermediate offset pivot per door and one additional intermediate offset pivot for every 30 inches (750 mm) of door height greater than 90 inches (2286 mm).

I. Lock Cylinders: Install construction cores to secure building and areas during construction period.

1. Replace construction cores with permanent cores as indicated in keying section.

J. Lead Protection: Lead wrap hardware penetrating lead-lined doors.

Levers and roses to be lead lined. Apply kick and armor plates on lead-lined doors with adhesive as recommended by manufacturer.

K. Wiring: Coordinate with Division 26, ELECTRICAL sections for:

1. Conduit, junction boxes and wire pulls.

SECTION 08 71 00 Page 21

2. Connections to and from power supplies to electrified hardware.

3. Connections to fire/smoke alarm system and smoke evacuation system.

4. Connection of wire to door position switches and wire runs to central room or area, as directed by Architect.

5. Testing and labeling wires with Architect’s opening number.

L. Key Control System: Tag keys and place them on markers and hooks in key control system cabinet, as determined by final keying schedule.

M. Door Closers: Mount closers on room side of corridor doors, inside of exterior doors, and stair side of stairway doors from corridors.

Closers shall not be visible in corridors, lobbies and other public spaces unless approved by Architect.

N. Closer/Holders: Mount closer/holders on room side of corridor doors, inside of exterior doors, and stair side of stairway doors.

O. Power Supplies: Locate power supplies as indicated or, if not indicated, above accessible ceilings or in equipment room, or alternate location as directed by Architect.

1. Configuration: Provide least number of power supplies required to adequately serve doors with electrified door hardware.

P. Thresholds: Set thresholds in full bed of sealant complying with requirements specified in Division 07 Section "Joint Sealants."

Q. Stops: Provide floor stops for doors unless wall or other type stops are indicated in door hardware schedule. Do not mount floor stops where they may impede traffic or present tripping hazard.

R. Perimeter Gasketing: Apply to head and jamb, forming seal between door and frame.

S. Meeting Stile Gasketing: Fasten to meeting stiles, forming seal when doors are closed.

T. Door Bottoms: Apply to bottom of door, forming seal with threshold when door is closed.

3.4 FIELD QUALITY CONTROL

A. Architectural Hardware Consultant: Engage qualified independent Architectural Hardware Consultant to perform inspections and to prepare inspection reports.

1. Architectural Hardware Consultant will inspect door hardware and state in each report whether installed work complies with or deviates from requirements, including whether door hardware is properly installed and adjusted.

SECTION 08 71 00 Page 22

3.5 ADJUSTING

A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements.

1. Spring Hinges: Adjust to achieve positive latching when door is allowed to close freely from an open position of 30 degrees.

2. Electric Strikes: Adjust horizontal and vertical alignment of keeper to properly engage lock bolt.

3. Door Closers: Adjust sweep period to comply with accessibility requirements and requirements of authorities having jurisdiction.

B. Occupancy Adjustment: Approximately three months after date of Substantial Completion, Installer's Architectural Hardware

Consultant shall examine and readjust each item of door hardware, including adjusting operating forces, as necessary to ensure function of doors, door hardware, and electrified door hardware.

3.6 CLEANING AND PROTECTION

A. Clean adjacent surfaces soiled by door hardware installation.

B. Clean operating items as necessary to restore proper function and finish.

C. Provide final protection and maintain conditions that ensure door hardware is without damage or deterioration at time of Substantial

Completion.

3.7 DEMONSTRATION

A. Provide training for Owner's maintenance personnel to adjust, operate, and maintain door hardware and door hardware finishes.

Refer to Division 01 Section "Demonstration and Training."

3.8 DOOR HARDWARE SCHEDULE

A. Locksets, exit devices, and other hardware items are referenced in the following hardware sets for series, type and function. Refer to the above-specifications for special features, options, cylinders/keying, and other requirements.

B. Hardware Sets:

OPT0200434

Date: February 20, 2021

SECTION 08 71 00 Page 23

HARDWARE GROUP NO. 001

FOR USE ON DOOR #(S):

119B 126C 128C 144C 144D

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

1 EA NOTE REMAINDER OF HARDWARE BY DOOR

MFR.

-COORDINATE HARDWARE WITH DOOR MFR.

HARDWARE GROUP NO. 101

103 104 107 108 110 112

115 116

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

3 EA HINGE A8112 652

1 EA OFFICE/ENTRY LOCK SERIES 1000, F04 626

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

1 EA SURFACE CLOSER C02011/C02021 AS REQ 689

1 EA KICK PLATE J102 630

1 EA WALL STOP L52251 630

3 EA SILENCER L03011 GRY

HARDWARE GROUP NO. 201

121 122 123

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

3 EA HINGE A8112 652

1 EA STOREROOM LOCK SERIES 1000, F07 626

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

1 EA SURFACE CLOSER C02011/C02021 AS REQ 689

1 EA KICK PLATE J102 630

SECTION 08 71 00 Page 24

HARDWARE GROUP NO. 203

117B 143

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

3 EA HINGE A8112 652

1 EA STOREROOM LOCK SERIES 1000, F07 626

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

HARDWARE GROUP NO. 210

126A

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

6 EA HINGE A8112 652

1 SET CONST LATCHING BOLT TYPE 27 630

1 EA DUST PROOF STRIKE L14011 626

1 EA STOREROOM LOCK SERIES 1000, F07 626

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

1 EA SURFACE CLOSER C02011/C02021 AS REQ 689

2 EA KICK PLATE J102 630

2 EA WALL STOP L52251 630

1 EA ASTRAGAL R5Y636 AL

2 EA SILENCER L03011 GRY

-PROVIDE 7/8" LTC STRIKE.

SECTION 08 71 00 Page 25

HARDWARE GROUP NO. 214

124 125 126B

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

6 EA HINGE A5111 630

2 EA MANUAL FLUSH BOLT L04251 626

1 EA DUST PROOF STRIKE L14011 626

1 EA STOREROOM LOCK SERIES 1000, F07 626

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

1 EA OH STOP C52541

(INACTIVE LEAF)

1 EA SURFACE CLOSER C02021 PT4-G

(ACTIVE LEAF)

2 EA KICK PLATE J102 630

1 EA RAIN DRIP R3Y976 AA

1 SET GASKETING R3B164 AA

1 SET MEETING STILE R3A735 AA

1 EA ASTRAGAL R5Y636 AL

2 EA DOOR SWEEP R3A536 AA

1 EA THRESHOLD J36130 A

2 EA DOOR CONTACT 7764 628

HARDWARE GROUP NO. 341

132 133 135 138 140 141

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

3 EA HINGE A8112 652

1 EA PRIVACY LOCK SERIES 1000, F22 X INDICATOR 626

1 EA SURFACE CLOSER C02011/C02021 AS REQ 689

1 EA KICK PLATE J102 630

1 EA WALL STOP L52251 630

-INDICATOR ON OUTSIDE OF DOOR.

SECTION 08 71 00 Page 26

HARDWARE GROUP NO. 341R

117A

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

3 EA HINGE A8112 652

1 EA PRIVACY LOCK SERIES 1000, F22 X INDICATOR 626

1 EA SURFACE CLOSER C02011/C02021 AS REQ 689

1 EA KICK PLATE J102 630

1 EA WALL STOP L52251 630

1 EA GASKETING R0E154 BK

-INDICATOR ON OUTSIDE OF DOOR.

HARDWARE GROUP NO. 714

145 146

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

6 EA HINGE A5111 630

1 EA PANIC HARDWARE GRADE 1, TYPE 8, F01 626

1 EA PANIC HARDWARE GRADE 1, TYPE 8, F03 626

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

2 EA SURFACE CLOSER C02021 PT4-G 689

2 EA KICK PLATE J102 630

1 EA RAIN DRIP R3Y976 AA

1 SET GASKETING R3B164 AA

1 SET MEETING STILE R3A735 AA

2 EA DOOR SWEEP R3A536 AA

1 EA THRESHOLD J36130 A

2 EA DOOR CONTACT 7764 628

-INGRESS BY THE CARD READER OR KEY OVERRIDE.

-FREE EGRESS BY THE PUSH PADS.

SECTION 08 71 00 Page 27

HARDWARE GROUP NO. 714A

114A 127A

EACH TO HAVE:

QTY DESCRIPTION CATALOG NUMBER FINISH

2 EA CONT. HINGE A31011G/A31021G 628

1 EA PANIC HARDWARE GRADE 1, TYPE 6, F01 626

1 EA PANIC HARDWARE GRADE 1, TYPE 6, F03 626

1 EA CYLINDER AS REQ. MARSHALL/BEST W/KEYED CONST.

CORE

1 EA PERMANENT CORE MARSHALL/BEST 6-PIN TO MATCH

EXISTING KEY SYSTEM

2 EA 90 DEG OFFSET PULL J402

2 EA SURFACE CLOSER C02021 PT4-G 689

2 EA DOOR SWEEP R3A536 AA

1 EA THRESHOLD J36130 A

2 EA DOOR CONTACT 7764 628

1 EA SEALS BY…