20_ITEM 01.3-10_ADD 04_02700A-140.pdf

PDF 891 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR
Solicitation number
W50S9F-22-B-0001
Issued by

About this file

This federal contract opportunity involves an invitation for bid for the construction of an F-35 three bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. Key details include the construction of a new 31,000 square foot three bay hangar and associated administrative and shop spaces to support F-35 operations such as fuel cell maintenance, indoor washing, surface coatings, and weapons load training. The project also requires the demolition of an existing 19,875 square foot building. The base contract line items cover new construction and demolition, while two options concern additions for a paint/mix area and aircraft rated pavement. Interested contractors must register in the System for Award Management and check the website periodically for amendments. The bid opening will adhere to FAR and DFARS procedures. The estimated value is between $25-100 million and the North American Industry Classification code is 236220. The contractor must complete work within 550 days of the notice to proceed.

View the file

Other files

File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Abstract of Offers.pdf PDF
Questions and Answers 4.pdf PDF
39_ITEM 01.5-1_ADD 03_Bid Question Attachment_2022.06.14.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
22_ITEM 01.3-12_ADD 04_02700A-502.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
24_ITEM 01.3-14_ADD 04_02700A-702.pdf PDF
Questions and Answers 3.pdf PDF
25_ITEM 01.3-15_ADD 04_02700ES101.pdf PDF
10_ITEM 01.2-10_ADD 04_Section 32 13 14.13.pdf PDF
26_ITEM 01.3-16_ADD 04_02700EP102.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
15_ITEM 01.3-5_ADD 04_02700SF105.pdf PDF
23_ITEM 01.3-13_ADD 04_02700A-503.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
11_ITEM 01.3-1_ADD 04_02700C-301.pdf PDF
06_ITEM 01.2-6_ADD 04_Section 08 33 23.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
27_ITEM 01.3-17_ADD 04_02700EP701.pdf PDF
04_ITEM 01.2-4_ADD 04_Section 07 24 00.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
17_ITEM 01.3-7_ADD 04_02700SF503.pdf PDF
02_ITEM 01.2-2_ADD 04_Section 04 20 00.pdf PDF
12_ITEM 01.3-2_ADD 04_02700C-401.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 004 COMBINED DRAWINGS.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
01_ITEM 01.2-1_ADD 03_Section 02 65 00.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
Questions and Answers 2.pdf PDF
07_ITEM 01.2-7_ADD 03_Section 21 13 13.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
18_ITEM 01.3-8_ADD 03_02700SF103.pdf PDF
16_ITEM 01.3-6_ADD 03_02700C-601.pdf PDF
03_ITEM 01.2-3_ADD 03_Section 05 50 13.pdf PDF
09_ITEM 01.2-9_ADD 03_Section 26 05 26.00 40.pdf PDF
Show 40 more

Latest 50 of 147 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1 A-201

A1 A-202

A1 A-201

C1 A-202

A-301 D1

A-301 D1

A-301 C1

A-301 C1

A-301 A1

A-301 A1

A-302 B2

A-302 B2

A-302 D2

A-302 D2

1/ 2"

1'

-0

1/2" / 1'-0"

1/2" / 1'-0"

PRIMARY ROOF DRAIN

OVERFLOW ROOF DRAIN

LOW-SLOPE

MEMBRANE ROOF

PRIMARY ROOF

DRAIN

OVERFLOW

ROOF DRAIN

LOW-SLOPE

MEMBRANE

ROOF

PRIMARY

ROOF

DRAIN

OVERFLOW

ROOF

DRAIN

LOW-SLOPE

MEMBRANE ROOF

PRIMARY ROOF DRAIN

OVERFLOW ROOF DRAIN

ROOF

ACCESS

HATCH

FALL

PROTECTION

FALL

PROTECTION

SKYLIGHT

WALKWAY

PADS

WALKWAY

PADS

WALKWAY

PADS

WALKWAY

PADS

LOW-SLOPE

MEMBRANE

ROOF

MECH

EQUIPMENT

MECH

EQUIPMENT

MECH

EQUIPMENT

MECH

EQUIPMENT

ROOF

ACCESS

LADDER

ROOF

ACCESS

LADDER

MECH

EQUIPMENT

MECH EQUIPMENT

MECH EQUIPMENT

1/ 2"

1'

-0

GAS PIPE

ON ROOF

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

CRICKET

CRICKET

CRICKET

SUNSHADES

SUNSHADES

AWNING

AWNING

AWNING

AWNING

AWNING

AWNING

EQ EQ

25'-0"

42" GUARDRAIL

1' -0

CRICKET

CRICKET

CRICKET

BID OPTION 1

MECH

EQUIPMENT

(ON GROUND)

IG-501 A1

2 2

2 2

2 2

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W

7D .rvt

6/28/2022 2:12: 21 PM

ROOF PLAN

A-140

JMI

JRT/JBC

JBC

SCALE: 3/32" = 1'-0"

COMPOSITE ROOF PLANA1

8' 24'16'0

3/32" = 1'-0"

GENERAL NOTES

A. ALL ROOF SLOPES SHALL BE 1/2" PER 1' - 0" UNLESS

NOTED OTHERWISE.

B. ALL DRAINAGE CRICKETS SHALL BE 1/2" PER 1' - 0".

C. BASE ROOF INSULATION SHALL BE R-30 MINIMUM.

D. ALL PARAPET CAPS ARE PRE-FINISHED METAL.

E. LIGHTENING PROTECTION SHALL HAVE STRAP OVER

PARAPET AND FASTENED TO PLYWOOD.

1 ADDENDUM 2 06/08/2022

2 ADDENDUM 4 06/28/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .