20_ITEM 01.3-10_ADD 04_02700A-140.pdf

PDF 891 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This federal contract opportunity involves an invitation for bid for the construction of an F-35 three bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. Key details include the construction of a new 31,000 square foot three bay hangar and associated administrative and shop spaces to support F-35 operations such as fuel cell maintenance, indoor washing, surface coatings, and weapons load training. The project also requires the demolition of an existing 19,875 square foot building. The base contract line items cover new construction and demolition, while two options concern additions for a paint/mix area and aircraft rated pavement. Interested contractors must register in the System for Award Management and check the website periodically for amendments. The bid opening will adhere to FAR and DFARS procedures. The estimated value is between $25-100 million and the North American Industry Classification code is 236220. The contractor must complete work within 550 days of the notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Abstract of Offers.pdf PDF
39_ITEM 01.5-1_ADD 03_Bid Question Attachment_2022.06.14.pdf PDF
06_ITEM 01.2-6_ADD 04_Section 08 33 23.pdf PDF
11_ITEM 01.3-1_ADD 04_02700C-301.pdf PDF
12_ITEM 01.3-2_ADD 04_02700C-401.pdf PDF
24_ITEM 01.3-14_ADD 04_02700A-702.pdf PDF
Questions and Answers 2.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 03_2022.06.14_Narrative.pdf PDF
04_ITEM 01.2-4_ADD 03_Section 05 51 33.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
17_ITEM 01.3-7_ADD 03_02700SF102.pdf PDF
21_ITEM 01.3-11_ADD 03_02700A-306.pdf PDF
22_ITEM 01.3-12_ADD 03_02700A-307.pdf PDF
26_ITEM 01.3-16_ADD 03_02700A-510.pdf PDF
29_ITEM 01.3-19_ADD 03_02700A-601.pdf PDF
30_ITEM 01.3-20_ADD 03_02700A-602.pdf PDF
GEO TECH REPORT_F-35 Hangar_2020-08-28_FINAL9-10-2020.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
22_ITEM 01.3-8_ADD 02_02700SF101.pdf PDF
26_ITEM 01.3-12_ADD 02_02700SF105.pdf PDF
34_ITEM 01.3-20_ADD 02_02700A-202.pdf PDF
44_ITEM 01.3-30_ADD 02_02700EG601.pdf PDF
46_ITEM 01.3-32_ADD 02_02700EP601.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1 A-201

A1 A-202

A1 A-201

C1 A-202

A-301 D1

A-301 D1

A-301 C1

A-301 C1

A-301 A1

A-301 A1

A-302 B2

A-302 B2

A-302 D2

A-302 D2

1/ 2"

1'

-0

1/2" / 1'-0"

1/2" / 1'-0"

PRIMARY ROOF DRAIN

OVERFLOW ROOF DRAIN

LOW-SLOPE

MEMBRANE ROOF

PRIMARY ROOF

DRAIN

OVERFLOW

ROOF DRAIN

LOW-SLOPE

MEMBRANE

ROOF

PRIMARY

ROOF

DRAIN

OVERFLOW

ROOF

DRAIN

LOW-SLOPE

MEMBRANE ROOF

PRIMARY ROOF DRAIN

OVERFLOW ROOF DRAIN

ROOF

ACCESS

HATCH

FALL

PROTECTION

FALL

PROTECTION

SKYLIGHT

WALKWAY

PADS

WALKWAY

PADS

WALKWAY

PADS

WALKWAY

PADS

LOW-SLOPE

MEMBRANE

ROOF

MECH

EQUIPMENT

MECH

EQUIPMENT

MECH

EQUIPMENT

MECH

EQUIPMENT

ROOF

ACCESS

LADDER

ROOF

ACCESS

LADDER

MECH

EQUIPMENT

MECH EQUIPMENT

MECH EQUIPMENT

1/ 2"

1'

-0

GAS PIPE

ON ROOF

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

CRICKET

CRICKET

CRICKET

SUNSHADES

SUNSHADES

AWNING

AWNING

AWNING

AWNING

AWNING

AWNING

EQ EQ

25'-0"

42" GUARDRAIL

1' -0

CRICKET

CRICKET

CRICKET

BID OPTION 1

MECH

EQUIPMENT

(ON GROUND)

IG-501 A1

2 2

2 2

2 2

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W

7D .rvt

6/28/2022 2:12: 21 PM

ROOF PLAN

A-140

JMI

JRT/JBC

JBC

SCALE: 3/32" = 1'-0"

COMPOSITE ROOF PLANA1

8' 24'16'0

3/32" = 1'-0"

GENERAL NOTES

A. ALL ROOF SLOPES SHALL BE 1/2" PER 1' - 0" UNLESS

NOTED OTHERWISE.

B. ALL DRAINAGE CRICKETS SHALL BE 1/2" PER 1' - 0".

C. BASE ROOF INSULATION SHALL BE R-30 MINIMUM.

D. ALL PARAPET CAPS ARE PRE-FINISHED METAL.

E. LIGHTENING PROTECTION SHALL HAVE STRAP OVER

PARAPET AND FASTENED TO PLYWOOD.

1 ADDENDUM 2 06/08/2022

2 ADDENDUM 4 06/28/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .