10_ITEM 01.2-10_ADD 03_Section 26 08 00.pdf
PDF 13 KB Posted
- Attached to
- F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
- Solicitation number
- W50S9F-22-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document provides details on an upcoming federal construction contract opportunity. The 115th Fighter Wing at Dane County Regional Airport - Truax Field in Madison, Wisconsin intends to issue an Invitation for Bids for award of a single firm fixed-price contract to construct a new three-bay specialized hangar facility compatible with the F-35 mission. Scope of work includes demolishing an existing building and constructing a 31,000 square foot hangar with pre-conditioned aircraft air, 270 VDC aircraft power, fire suppression, and hangar bay HVAC. Administrative and shop spaces as well as future paint booth and composite spaces are also required. The contract duration is 550 days from notice to proceed. The base contract line items are for construction with two options for additional work. Brand name justification is required for some products. The bid opening will be conducted in accordance with FAR Subpart 14.4 and interested bidders must register in the System for Award Management.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANG/WI - F-35: 3-Bay Specialized Hangar 20202700F353BAY Addendum No. 03 14 June 2022
SECTION 26 08 00
APPARATUS INSPECTION AND TESTING
11/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
Acceptance Tests and Inspections ; G
SD-07 Certificates
Qualifications of Organization, and Lead Engineering Technician; G
Acceptance Test and Inspections Procedure ; G
1.3 QUALITY ASSURANCE
1.3.1 Qualifications
Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph entitled "Acceptance Tests and Inspections" herein.
Organization shall be independent of the supplier, manufacturer, and installer of the equipment. The organization shall be a first tier subcontractor. No work required by this section of the specification shall be performed by a second tier subcontractor.
a. Submit name and qualifications of organization. Organization shall have been regularly engaged in the testing of electrical materials, devices, installations, and systems for a minimum of 5 years. The organization shall have a calibration program, and test instruments used shall be calibrated in accordance with NETA ATS.
b. Submit name and qualifications of the lead engineering technician performing the required testing services. Include a list of three comparable jobs performed by the technician with specific names and
SECTION 26 08 00 Page 1 telephone numbers for reference. Testing, inspection, calibration, and adjustments shall be performed by an engineering technician, certified by NETA (Level III) or the National Institute for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience inspecting, testing, and calibrating electrical distribution and generation equipment, systems, and devices.
1.3.2 Acceptance Tests and Inspections Reports
Submit certified copies of inspection reports and test reports. Reports shall include certification of compliance with specified requirements, identify deficiencies, and recommend corrective action when appropriate.
Type and neatly bind test reports to form a part of the final record.
Submit test reports documenting the results of each test not more than 10 days after test is completed.
1.3.3 Acceptance Test and Inspections Procedure
Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned testing date. Do not perform testing until after test procedure has been approved.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 ACCEPTANCE TESTS AND INSPECTIONS
Testing organization shall perform acceptance tests and inspections. Test methods, procedures, and test values shall be performed and evaluated in accordance with NETA ATS, the manufacturer's recommendations, and paragraph entitled "Field Quality Control" of each applicable specification section. Tests identified as optional in NETA ATS are not required unless otherwise specified. Equipment shall be placed in service only after completion of required tests and evaluation of the test results have been completed. Contractor shall supply to the testing organization complete sets of shop drawings, settings of adjustable devices, and other information necessary for an accurate test and inspection of the system prior to the performance of any final testing. Contracting Officer shall be notified at least 14 days in advance of when tests will be conducted by the testing organization. Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:
a. Section 26 05 26 00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
b. Section 26 24 13 SWITCHBOARDS
c. Section 26 35 44 270 VDC SOLID STATE CONVERTER. The NETA ATS representative must coordinate with the Contractor and the Converter Manufacturers' representative to witness, document, and validate the Converter Field Quality Control, Inspection and Testing. These tests
SECTION 26 08 00 Page 2 will be performed by the converter manufacturers' representative, however include the documentation in the overall NETA report as well.
3.2 SYSTEM ACCEPTANCE
Final acceptance of the system is contingent upon satisfactory completion of acceptance tests and inspections.
3.3 PLACING EQUIPMENT IN SERVICE
A representative of the approved testing organization shall be present when equipment tested by the organization is initially energized and placed in service.
-- End of Section --