VAAR 852.219-75.docx

VAAR Clause DOCX document 28 KB Posted

Attached to
Z1DA--VANJHCS Demolition and Abatement IDIQ East Orange and Lyons
Solicitation number
36C24226Q0857
Issued by

About this file

This is a Determination and Findings document for a contract modification issued by the Department of Veterans Affairs Veterans Health Administration Network Contracting Office (NCO2). The modification extends the period of performance for contract 36C24226C0084 with Watson Engineering, PC by 76 days, from the original end date of September 15, 2026 to November 30, 2026. This is a no-cost time extension modification, with zero dollars added to the contract's total cost. The original contract value was $3,672,651.00, and total modifications to date amount to $180,958.80.

The modification is classified as a supplemental agreement authorized under FAR 52.243-4 and VAAR 852.243-70. The contracting officer determined the time extension is within the original contract scope and necessary to allow the contractor to complete an arc flash study. The modification has been documented in the eCMS system via SF30 form creation, and the contracting officer, Michael Spivack, determined the modification to be fair, reasonable, and in the best interest of the U.S. Government. The underlying contract supports demolition and abatement services for the VA New Jersey Health Care System at the East Orange and Lyons VA Medical Centers under an IDIQ vehicle with a minimum value of $10,000 and maximum value of $2,000,000.

View the file

Other versions and copies of VAAR 852.219-75

File Revision Posted Attached to
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.docx Revision not stated Radiant Heating Panel Replacement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated F108--620-26-206 Asbestos Abatement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated Z2NZ--Manhole Repairs at Montrose VAMC
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC
S02 852.219-75 Limitation on Subcontracting.pdf Revision not stated Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx Revision not stated Z2DA--FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL.
Attachment II - VAAR 852.219-75.pdf Revision not stated H941--Chemical Hoods & HEPA PM
FAR 852.219-75-Limitation on Subcontracting.pdf Revision not stated W038--Rental & Support Services for Wheeled Loaders w/3yard bucket
VAAR 852.219-75 VA Notice of Limitations on Subcontracting_Certificate.docx Revision not stated R706--FCC Medical Cache Maintenance
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated Z2DA--561-26-104 Repair Operating Room (OR) & Bathroom Leaks
852.219-75 VA NOTICE OF LIMIT ON SUBCONTRACTING.pdf Revision not stated J012-- Fire Alarm Suppression Maintenance & Repair Services
REVISED 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx Revision not stated 657-24-111JC FCA-Renovate Ambassador Suite & Main Lobby B1
S02 Atch E VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf Revision not stated Replace Operating Room 5 Flooring
Attachment 2 - VAAR 852.219-75.pdf Revision not stated Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use
S02 - ATT E - VAAR 852.219-75_REQUIRED.pdf Revision not stated Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
VAAR 852.219-75 corrected.docx Revision not stated Z1DA--VANJHCS Demolition and Abatement IDIQ East Orange and Lyons
Show all 20

Who attaches VAAR 852.219-75

Other files

File Type Posted
36C24226Q0857 0003.docx DOCX document
WD Somerset 8-13.docx DOCX document
VAAR 852.219-75 corrected.docx DOCX document
36C24226Q0857 0002.docx DOCX document
EXHIBIT C - Past Performance Questionnaire - revised v2.docx DOCX document
LINE ITEM PRICING SHEET LYN-EO DEMOLITION AND ABATEMENT REVISED.xlsx XLSX spreadsheet
36C24226Q0857 0001.docx DOCX document
EXHIBIT C - Past Performance Questionnaire - revised.docx DOCX document
36C24226Q0857_1.docx DOCX document
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
LINE ITEM PRICING SHEET LYN-EO DEMOLITION AND ABATEMENT.xlsx XLSX spreadsheet
WD Essex.docx DOCX document
WD Somerset.docx DOCX document
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4:Determination and Findings

MODIFICATION (EXCLUDING OPTIONS)

DETERMINATION AND FINDINGS

Department of Veterans Affairs/Veterans Health Administration Network Contracting Office: NCO2 Contract Number: 36C24226C0084 Modification Number: P00001 Modification TYPE Chosen: Supplemental (Change Order or Supplemental Agreement) Modification REASON Chosen: extend POP to 11/30 Modification FAR AUTHORITY: FAR 52.243-4 and VAAR 852.243-70 Contractor Name: WATSON ENGINEERING, PC Original Cost of Contract: $3,672,651.00 Modification Cost: $0.00 Total cost of Modifications to Date: $180,958.80 Number of days added by modification: 76 Number of days taken away by modification: 0 Original Period of Performance: 05/13/2026– 09/15/2026 Total number of days added by other modifications to date: 0 Total number of days taken away by other modifications to date: 0

FINDINGS

1. Describe in detail the need for the changed work, time, or cost.

The reason for this modification is a no cost time extension that increases the period of performance by 76 days from 09/15/2026 to 11/30/2026 to allow for completion of the arc flash study.

2. A statement addressing whether the proposed modification is within the original scope of the contract and specifically addressing the facts considered in reaching the conclusion.

This modification is within scope of the contract, as this modification only extends the period of performance in order for the contractor to complete the required study.

3. A statement analyzing the pricing factors considered in reaching a fair and reasonable price determination and identifying each Line Item Number affected, including but not limited to, IGCE, market research, and any other price analysis information.

This is a no cost modification

4. Were technical and legal reviews conducted based on IOP requirements? If not, attach HCA approved exemption, if applicable.

N/A

5. Checklist and attachments when appropriate:

X SF30 created in eCMS Documents tab

· Modification contains statement of release

· Changes to Statement of Work on file

· Changed drawings and specifications on file

· Contractor written request including all required documents to recognize a successor in interest to its contracts or a name change FAR 42.1202-1204

· Novation or Change of Name documents on file

· Contractor revised pricing on file

· A&E only: List fees awarded in the original contract and previous modifications

· HCA approved exemption for IOP review on file

· Obligated Funding Document on file

· 2237 or Finance certification that funds are available on file

· COR document change in best interest of Government on file

· Legal Review Completed (See Acquisition Policy Flash! 17-19 for thresholds)

· Other ________________________________________________________

DETERMINATION

Based on the above findings this modification is determined to be fair and reasonable and in the best interest of the U.S. Government.

___________
Michael Spivack, Contracting OfficerDate