This is a Past Performance Questionnaire template designed for contractors bidding on the Z1DA--VANJHCS Demolition and Abatement IDIQ contract. The questionnaire serves as an evaluation tool to assess contractor qualifications and experience relevant to demolition and abatement services at VA facilities. As a template document, it does not specify particular response dates, evaluation criteria weightings, or scoring methodologies, but rather provides the framework that bidders must complete to demonstrate their past performance capabilities.
The questionnaire is intended to evaluate contractor experience performing demolition and asbestos abatement work, particularly on projects involving similar scope, complexity, and regulatory requirements as those required under the five-year IDIQ contract for the VA New Jersey Health Care System (East Orange and Lyons Medical Centers). Contractors responding to this solicitation would use this template to document relevant project histories, including work performed at federal facilities, experience with asbestos hazard abatement in accordance with New Jersey Administrative Code requirements, and demonstrated ability to manage projects within the $10,000 to $2,000,000 value range specified in the SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0857 0003.docx | DOCX document | |
| WD Somerset 8-13.docx | DOCX document | |
| LINE ITEM PRICING SHEET LYN-EO DEMOLITION AND ABATEMENT REVISED.xlsx | XLSX spreadsheet | |
| EXHIBIT C - Past Performance Questionnaire - revised v2.docx | DOCX document | |
| 36C24226Q0857 0002.docx | DOCX document | |
| VAAR 852.219-75 corrected.docx | DOCX document | |
| EXHIBIT C - Past Performance Questionnaire - revised.docx | DOCX document | |
| 36C24226Q0857 0001.docx | DOCX document | |
| EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx | DOCX document | |
| 36C24226Q0857_1.docx | DOCX document | |
| VAAR 852.219-75.docx | DOCX document | |
| WD Essex.docx | DOCX document | |
| LINE ITEM PRICING SHEET LYN-EO DEMOLITION AND ABATEMENT.xlsx | XLSX spreadsheet | |
| WD Somerset.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
Network Contracting Office 4 1010 Delafield Road Pittsburgh, PA 15215
Past Performance Questionnaire for: 529-22-101 Replace Bldg. #7 Master Control Panel
INSTRUCTIONS TO OFFEROR
Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.
Company Name
Street Address
Point of Contact (POC)
City
POC Phone Number
State
Reference Project Title
Zip Code
Contract Period of Performance (start to finish):
Contract Number
Contract Dollar Value
Description of Work
| Role of Contractor on This Project (check appropriate box) |
| |_| Prime Contractor |_| Sub-contractor |_| Key Personnel |
INSTRUCTIONS TO REFERENCE CONTACT
The contractor named above is submitting a proposal for a United States Department of Veterans Affairs contract, and has sent this form to you as a past performance reference contact. Please complete the following pages in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contracting Officer by emailing directly to:
Hanna.Karmazyn@va.gov
Please return the completed form ASAP, but no later than 12:00 pm local time, January 23, 2024.
If you have any questions, please contact the Contracting Officer: Elijah.mcintosh@va.gov
RESPONDENT INFORMATION [completed by Reference Contact]
Company Name
Street Address
POC Name
City
Phone Number
State
Zip Code
PERFORMANCE INFORMATION: Choose the number on the scale of 0 (Neutral) to 5 (Exceptional) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE AN EXPLANATION FOR THE OVERALL RATING in the Remarks section, below.
| 0 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| NEUTRAL |
| UNACCEPTABLE |
| MARGINAL |
| ACCEPTABLE |
| VERY GOOD |
| OUTSTANDING |
| No record of past performance, or not applicable or the record is inconclusive. |
| Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective. |
| Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective. |
| Performance met most contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory. |
| Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner. |
| Performance exceeded all contract requirements. There were no problems. |
| The Contractor … |
| 0 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
QUALITY – MANAGEMENT & WORKMANSHIP
| 1. |
| Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 2. |
| Demonstrated ability to hire, maintain, and replace, if necessary, qualified construction personnel during the contract period. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 3. |
| Provided and followed approved quality control plan and/or inspection procedures to meet contract requirements. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 4. |
| Corrected deficiencies in timely manner and pursuant to their quality control procedures. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 5. |
| Submittals clearly identified the proposed item IAW the specifications and drawings. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 6. |
| Suggested alternative approaches to problems. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
TIMELINESS AND ADHERENCE TO SCHEDULE
| 0 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 7. |
| Contractor provided timely notices of possible delays/schedule revisions. |
REMARKS:
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 8. |
| Timeliness in submitting submittals and reports and responding to agency inquiries, RFP's, etc. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 9. |
| Developed realistic and met approved progress schedules. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
BUSINESS PRACTICES/CUSTOMER RELATIONSHIP AND ABILITY TO PERFORM
| 10. |
| Displayed initiative to solve problems. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 11. |
| How well did the contractor work independent of Government guidance, oversight and assistance? |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 12. |
| Subcontractors / tradesmen were adequately managed and coordinated. Explain any subcontracting issues (positive or negative) that impacted the performance of your contract(s). |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 13. |
| For contract changes, contractor provided timely and realistic change order proposals. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
COMPLIANCE & SAFETY
| 0 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 14. |
| Reports (i.e., daily, test, logs) / records were submitted completely and accurately satisfy the requirement. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 15. |
| Applicable to Federal Contracts –Contractor complied with applicable Federal Laws and Regulations such as Construction Wage Rate Requirements – timely payrolls and compliance; Drug-Free Workplace; Environmental Regulations and Use of Recovered Materials; Executive Order 13101 Greening the Government. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 16. |
| Contractor’s safety program was in compliance with federal regulations. Contractor implemented and followed their safety plan and ran a “safe jobsite”. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
INFECTION CONTROL
| 17. |
| Contractor had an Infection Control Process in place and complied with agency Infection Control Requirements. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
OVERALL CUSTOMER SATISFACTION
| 18. |
| Demonstrated reasonableness in modifications cost proposal. |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| 19. |
| Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.” |
| |_| |
| YES |
| |_| |
| NO |
| 20. |
| Would you award another contract to this contractor? If not, please explain in “remarks.” |
| |_| |
| YES |
| |_| |
| NO |
| OVERALL PERFORMANCE RATING: |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
| |_| |
REMARKS (Please use as much space as is needed – the box will expand as you type).
I hereby certify that the information that I have reported above is accurate to the best of my knowledge.
Printed Name
E-mail address
Business Title
Signature
Date