TLRFIA-over-Steel-Model.pdf

PDF 167 KB Posted

Attached to
ROOFING AT ALLENDALE ELEMENTARY SCHOOL AND ROGERS BUILDING
Solicitation number
RFP MNA 260000002642 1
Issued by
Wayne County, Michigan

About this file

This is a technical specification document for Tremco Low Rise Foam Insulation Adhesive application procedures, though the specific contracting agency and jurisdiction are not identified in the document provided. The document outlines detailed installation requirements for applying foam insulation adhesive to roofing systems over steel substrates. Key specifications include application timing requirements, with insulation boards to be placed within 15 seconds of adhesive foaming initiation, and precise temperature parameters requiring ambient conditions of 45°F and rising with material temperatures maintained between 70°F and 85°F. The adhesive application density varies by location: 12 inches on center spacing (4 beads per board) for standard field applications, 6 inches on center (8 beads per board) for perimeter areas, and 4 inches on center (12 beads per board) for corner applications. The document emphasizes proper installation techniques to prevent board repositioning, adhesive puddling, and surface unevenness.

No pricing information, contract terms, bid due dates, award timelines, set-asides, incumbent contractors, funding sources, or renewal options are specified in this technical specification document. The material appears to be a reference guide for construction contractors rather than a complete solicitation package, and does not contain procurement-related administrative details necessary for bid evaluation or contract award.

View the file

Other files

File Type Posted
Project-Allendale Elementary Roofing Replacement.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Rogers Early Elementary- AOC.pdf PDF
Project-Rogers Early Elementary School Roofing Replacement.pdf PDF
Area-Divider-Model.pdf PDF
Light-Metal-Roof-Edge (1).pdf PDF
Project-Allendale Elementary Roofing Replacement.docx DOCX document
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT.docx DOCX document
MELNAP Schools Summer of 2027 Roofing Bid Form.doc DOC document
FAQs PW April 2025.pdf PDF
Prevailing Wage Rates.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders MELNAP Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Project-Rogers Early Elementary School Roofing Replacement.docx DOCX document
Allendale Elementary- AOC.pdf PDF
MELNAP Schools Summer of 2027 Roofing Scope of Work.docx DOCX document
Wood-Curb-Model.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

TLRFIA-002

TREMCO LOW RISE FOAM

INSULATION ADHESIVE

NOTE:

1. INSULATION BOARDS MUST BE PLACED INTO THE ADHESIVE AS SOON AS IT STARTS TO FOAM (WITHIN 15 SECONDS). STEP BOARDS

INTO PLACE. DO NOT REPOSITION BOARDS ONCE THEY ARE SET. DO NOT PUDDLE OR MOUND THE ADHESIVE AS THIS CAN LEAD TO

EXCESSIVE RISE AND BOARD SURFACE UNEVENNESS.

2. IDEAL AMBIENT TEMPERATURE FOR APPLICATION IS 45F AND RISING. MATERIAL TEMPERATURE MUST BE BETWEEN 70F AND 85F.

3. APPLY ADHESIVE AT 12" O.C. AT THE FIELD OF THE ROOF (4 BEADS PER BOARD).

4. APPLY ADHESIVE AT 6" O.C. IN PERIMETER AREAS (8 BEADS PER BOARD) AND 4" O.C IN CORNER AREAS (12 BEADS PER BOARD).

Sheets and Views
Model

File details come from the government source that posted it. Updated .