TLRFIA-over-Steel-Model.pdf
PDF 167 KB Posted
- Solicitation number
- RFP MNA 260000002642 1
- Issued by
- Wayne County, Michigan
About this file
This is a technical specification document for Tremco Low Rise Foam Insulation Adhesive application procedures, though the specific contracting agency and jurisdiction are not identified in the document provided. The document outlines detailed installation requirements for applying foam insulation adhesive to roofing systems over steel substrates. Key specifications include application timing requirements, with insulation boards to be placed within 15 seconds of adhesive foaming initiation, and precise temperature parameters requiring ambient conditions of 45°F and rising with material temperatures maintained between 70°F and 85°F. The adhesive application density varies by location: 12 inches on center spacing (4 beads per board) for standard field applications, 6 inches on center (8 beads per board) for perimeter areas, and 4 inches on center (12 beads per board) for corner applications. The document emphasizes proper installation techniques to prevent board repositioning, adhesive puddling, and surface unevenness.
No pricing information, contract terms, bid due dates, award timelines, set-asides, incumbent contractors, funding sources, or renewal options are specified in this technical specification document. The material appears to be a reference guide for construction contractors rather than a complete solicitation package, and does not contain procurement-related administrative details necessary for bid evaluation or contract award.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET TITLE:
DRAWING No.:
SCALE:
NTS
TLRFIA-002
TREMCO LOW RISE FOAM
INSULATION ADHESIVE
NOTE:
1. INSULATION BOARDS MUST BE PLACED INTO THE ADHESIVE AS SOON AS IT STARTS TO FOAM (WITHIN 15 SECONDS). STEP BOARDS
INTO PLACE. DO NOT REPOSITION BOARDS ONCE THEY ARE SET. DO NOT PUDDLE OR MOUND THE ADHESIVE AS THIS CAN LEAD TO
EXCESSIVE RISE AND BOARD SURFACE UNEVENNESS.
2. IDEAL AMBIENT TEMPERATURE FOR APPLICATION IS 45F AND RISING. MATERIAL TEMPERATURE MUST BE BETWEEN 70F AND 85F.
3. APPLY ADHESIVE AT 12" O.C. AT THE FIELD OF THE ROOF (4 BEADS PER BOARD).
4. APPLY ADHESIVE AT 6" O.C. IN PERIMETER AREAS (8 BEADS PER BOARD) AND 4" O.C IN CORNER AREAS (12 BEADS PER BOARD).