This is a technical drawing specification document detailing the installation requirements for hot and cold piping penetrations through a built-up roofing (BUR) system. The document provides comprehensive guidance on the proper methods for routing pipes through roof decks while maintaining system integrity and weather protection.
The specification outlines a multi-layered approach to piping penetrations, beginning with wood nailers secured to the roof deck using appropriately spaced fasteners in two staggered rows at 24-inch on-center intervals. The installation includes specified BUR insulation, two-ply stripping flanges set in asphalt cement and mechanically fastened at 3-inch on-center intervals, with metal flanges primed before application. The specification requires pipes to slope downward and away from the hood, sheet metal collars with proper sealing, and metal hoods incorporating cross breaks or slopes for drainage. In cold climates, additional insulation inside the metal work is required. All fasteners are to be spaced at 8-inch on-center, with asphalt cement and membrane sheet sealing applied to ensure watertight closure and prevent moisture infiltration.
No pricing information, contract term details, award dates, bidder requirements, or procurement timelines are contained within this technical specification document, as it functions solely as a design and installation guideline for roofing contractors executing this specific work element.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG NO. 18
BUILT UP ROOFING
HOT/COLD PIPING THROUGH ROOF DECK
WOOD NAILER SECURED
SPECIFIED BUR
INSULATION
ROOF DECK
TO DECK w/ APPROPRIATE
FASTENERS, 2 ROWS
STAGGERED EACH
ROW 24'' O.C.
AS SPECIFIED
GRAVEL SURFACING
TWO-PLY STRIPPING
FLANGE SET IN SPECIFIED
ASPHALT CEMENT,
MECHANICALLY FASTENED
3'' O.C., PRIME METAL
FLANGE BEFORE STRIPPING
SLOPE PIPES DOWN
AND AWAY FROM
HOOD
FASTENERS 8'' O.C.
SHEET METAL
COLLAR
SEAL
INSULATE INSIDE OF
METAL WORK IN COLD
CLIMATES
SHEET METAL HOOD
CROSS BREAK
OR SLOPE FOR
DRAINAGE
METAL SCREW
SEAL
CLOSURE DETAIL
ASPHALT CEMENT
SEAL
MEMBRANE
SHEET TITLE:
DRAWING No.:
SCALE:
NTS
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .