Light-Metal-Parapet-Cap.pdf

PDF 138 KB Posted

Attached to
ROOFING AT ALLENDALE ELEMENTARY SCHOOL AND ROGERS BUILDING
Solicitation number
RFP MNA 260000002642 1
Issued by
Wayne County, Michigan

About this file

This is a technical drawing specification document, DWG No. 36, detailing the construction requirements for a light-metal parapet cap installation. The drawing provides a cross-sectional view (Section A-A) of a roof assembly at the parapet wall interface, specifying the materials and installation methods required for this roofing component. The specification details include a two-ply Tremco roof membrane system installed over a specified roof deck with insulation, built-up roofing (BUR) with gravel surfacing, and base flashing. The light-metal parapet cap itself is to be installed with specific fastening requirements, including a continuous cleat fastened at 16-inch on-center spacing with fasteners spaced 24 inches on-center. The cap design incorporates a neoprene gasketed sealant between the wall, a nailer attachment point, and membrane installation over a Tremco nailer with 2-inch turn-down ends at a 45-degree angle. The drawing references Factory Mutual Data Sheet I-49 for additional performance specifications and indicates maximum spacing constraints of 10 feet.

The document establishes material and installation standards for this roofing component but does not specify pricing, contract terms, bid submission dates, or project funding information. This appears to be a technical specification document intended to guide contractors in the proper installation of the parapet cap assembly rather than a solicitation document containing bidding parameters or contract award details.

View the file

Other files

File Type Posted
Project-Allendale Elementary Roofing Replacement.docx DOCX document
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT.docx DOCX document
Project-Allendale Elementary Roofing Replacement.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Rogers Early Elementary- AOC.pdf PDF
Project-Rogers Early Elementary School Roofing Replacement.pdf PDF
Area-Divider-Model.pdf PDF
Light-Metal-Roof-Edge (1).pdf PDF
MELNAP Schools Summer of 2027 Roofing Bid Form.doc DOC document
FAQs PW April 2025.pdf PDF
Prevailing Wage Rates.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders MELNAP Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Project-Rogers Early Elementary School Roofing Replacement.docx DOCX document
Allendale Elementary- AOC.pdf PDF
MELNAP Schools Summer of 2027 Roofing Scope of Work.docx DOCX document
Wood-Curb-Model.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 36

TWO-PLY TREMCO

AS SPECIFIED

ROOF DECK

INSULATION

SPECIFIED BUR

GRAVEL SURFACING

BASE FLASHING

ATTACH NAILER TO

NEOPRENE GASKETED

AS SPECIFIED

SEALANT BETWEEN

WALL REFER TO

FACTORY MUTUAL

DATA SHEET I-49

CONTINUOUS CLEAT

FASTENED 16'' O.C.

4'' MIN.

10'-0'' M

AX.

A

A

SECTION A-A

FASTENER 24'' O.C.

METAL SECTIONS

FLASHING MEMBRANE

INSTALLED OVER

TREMCO NAILER

2''

TURN ENDS DOWN

45 ANGLE

SPECIFIED CANT

STRIPPING

BUILT UP ROOFING

HOT/COLD LIGHT METAL PARAPET CAP

MEMBRANE

SHEET TITLE:

DRAWING No.:

SCALE:

NTS