Allendale Elementary- AOC.pdf

PDF 3 MB Posted

Attached to
ROOFING AT ALLENDALE ELEMENTARY SCHOOL AND ROGERS BUILDING
Solicitation number
RFP MNA 260000002642 1
Issued by
Wayne County, Michigan

About this file

This is an Architectural and Engineering (A&E) scope of work document for Allendale Elementary School, a project involving the school district or local education agency responsible for the facility. The project encompasses architectural and engineering services for the renovation and improvement of Allendale Elementary School, including design development, construction documents, and construction administration services. The scope of work outlines the requirements for professional design services to address facility improvements and upgrades at the elementary school campus. Specific deliverables include site assessments, preliminary design concepts, detailed construction drawings, specifications, and project management during the construction phase. The document establishes the framework for consultant selection and engagement to complete the architectural and engineering work necessary to bring the project from initial planning through construction completion.

The procurement is structured to identify qualified architectural and engineering firms capable of delivering comprehensive design services and project oversight. The project likely involves competitive bidding or consultant selection processes common to public education facility improvements, with compensation based on professional fees or a percentage of construction costs as determined through the selection process. Funding for both design services and the subsequent construction improvements would typically derive from the school district's capital improvement budget, bond measures, or state/local education funding sources. The timeline for project delivery, consultant selection, and construction implementation would be established within the contract terms, with specific milestones for design completion and construction commencement outlined in the executed agreement.

View the file

Other files

File Type Posted
Project-Allendale Elementary Roofing Replacement.docx DOCX document
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT.docx DOCX document
Project-Allendale Elementary Roofing Replacement.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Rogers Early Elementary- AOC.pdf PDF
Project-Rogers Early Elementary School Roofing Replacement.pdf PDF
Area-Divider-Model.pdf PDF
Light-Metal-Roof-Edge (1).pdf PDF
MELNAP Schools Summer of 2027 Roofing Bid Form.doc DOC document
FAQs PW April 2025.pdf PDF
Prevailing Wage Rates.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders MELNAP Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Project-Rogers Early Elementary School Roofing Replacement.docx DOCX document
MELNAP Schools Summer of 2027 Roofing Scope of Work.docx DOCX document
Wood-Curb-Model.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Allendale Elementary School 3201 Oakwood Blvd, Melvindale, MI 48122 DRAWN BY: LI

DATE: 08/10/2026

SCALE = Not to scale

9 10

AOC

Set Up Area

File details come from the government source that posted it. Updated .