Light-Metal-Roof-Edge (1).pdf

PDF 139 KB Posted

Attached to
ROOFING AT ALLENDALE ELEMENTARY SCHOOL AND ROGERS BUILDING
Solicitation number
RFP MNA 260000002642 1
Issued by
Wayne County, Michigan

About this file

This is a technical drawing specification document (DWG No. 34) for light-metal roof edge construction detail, applicable to built-up roofing (BUR) systems. The drawing provides detailed specifications for attaching metal roof edging to wall surfaces using a wood nailer fastened at 16-inch on-center intervals with continuous cleats. The installation requires a joint cover measuring 4 to 6 inches wide secured with fasteners spaced at 3-inch on-center intervals set in asphalt cement, with staggered fasteners across two rows applied before roof deck stripping. The specification mandates that all metal surfaces be primed before contact with Tremco primers, with the metal flange set in asphalt cement and prime flange dimensions ranging from a minimum of 1/2 inch to a maximum of 10 feet. The assembly includes two-ply stripping as specified, gravel surfacing, and adhesive sheet components integrated with the specified BUR membrane and insulation.

This technical specification establishes material and installation standards for light-metal roof edge systems in built-up roofing applications. The drawing serves as a reference detail for contractors and installers to ensure proper integration of metal roof edges with wall assemblies, specifying fastener patterns, spacing, and material preparation requirements. No pricing, award dates, contract terms, or bidding information is contained within this technical specification document.

View the file

Other files

File Type Posted
Project-Allendale Elementary Roofing Replacement.docx DOCX document
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT.docx DOCX document
Project-Allendale Elementary Roofing Replacement.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Rogers Early Elementary- AOC.pdf PDF
Project-Rogers Early Elementary School Roofing Replacement.pdf PDF
Area-Divider-Model.pdf PDF
MELNAP Schools Summer of 2027 Roofing Bid Form.doc DOC document
FAQs PW April 2025.pdf PDF
Prevailing Wage Rates.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders MELNAP Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Project-Rogers Early Elementary School Roofing Replacement.docx DOCX document
Allendale Elementary- AOC.pdf PDF
MELNAP Schools Summer of 2027 Roofing Scope of Work.docx DOCX document
Wood-Curb-Model.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 34

NOTES

1. ALL METAL SURFACES SHALL BE PRIMED BEFORE CONTACT WITH TREMCO PRIMERS

BUILT UP ROOFING

HOT/COLD LIGHT-METAL ROOF EDGE

TO WALL

ATTACH WOOD NAILER

FASTENED 16'' O.C.

CONTINUOUS CLEAT

JOINT COVER 4''-6'' WIDE

AND SECURED USING TWO

SET IN ASPHALT CEMENT

GAP IN THE FASCIA FLANGE

FASTENERS 3'' O.C.

FASTENERS THROUGH THE

FELT

ENVELOPE

STAGGERED 2 ROWS

BEFORE STRIPPING

ROOF DECK

SPECIFIED INSULATION

SPECIFIED BUR MEMBRANE

SPECIFIED TREMCO

METAL SET IN ASPHALT

CEMENT- PRIME FLANGE

1/2'' M

IN.

10'-0'' M

AX.

TWO-PLY STRIPPING

AS SPECIFIED

GRAVEL SURFACING

ADHESIVE

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

Sheets and Views
Model

File details come from the government source that posted it. Updated .