Conduit-or-Piping-Support.pdf

PDF 110 KB Posted

Attached to
ROOFING AT ALLENDALE ELEMENTARY SCHOOL AND ROGERS BUILDING
Solicitation number
RFP MNA 260000002642 1
Issued by
Wayne County, Michigan

About this file

This is a technical drawing specification document for roofing and conduit/piping support installation. The drawing (DWG No. 28) provides detailed specifications for securing conduit or piping to a roof deck using a built-up roofing (BUR) system. The installation methodology requires wood blocking spaced at five-foot intervals to serve as secure anchor points, with clamps used to fasten the conduit or piping to these blocks. The specification calls for industry-standard materials including specified insulation, a BUR membrane, and treated sheet walk pads. The drawing is presented at a "not to scale" (NTS) format and is dated 2023.

The document does not contain information regarding pricing terms, contract award dates, term duration, renewal options, set-asides, incumbent contractors, funding sources, or response deadlines. As a technical specification drawing rather than a complete solicitation document, this file serves as a design reference for construction or renovation work and would typically be included as part of a larger contract package or project bid set.

View the file

Other files

File Type Posted
Project-Allendale Elementary Roofing Replacement.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Rogers Early Elementary- AOC.pdf PDF
Project-Rogers Early Elementary School Roofing Replacement.pdf PDF
Area-Divider-Model.pdf PDF
Light-Metal-Roof-Edge (1).pdf PDF
Project-Allendale Elementary Roofing Replacement.docx DOCX document
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT.docx DOCX document
MELNAP Schools Summer of 2027 Roofing Bid Form.doc DOC document
FAQs PW April 2025.pdf PDF
Prevailing Wage Rates.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders MELNAP Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Project-Rogers Early Elementary School Roofing Replacement.docx DOCX document
Allendale Elementary- AOC.pdf PDF
MELNAP Schools Summer of 2027 Roofing Scope of Work.docx DOCX document
Wood-Curb-Model.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 28

BUILT UP ROOFING

HOT/COLD CONDUIT OR

PIPING SUPPORT

ROOF DECK AS SPECIFIED

SECURE CONDUIT/ PIPING WITH CLAMP

TO WOOD BLOCKING

WOOD BLOCKING SPACED EVERY 5 FEET

SPECIFIED INSULATION

SPECIFIED BUR

MEMBRANE

WALK PAD

TREMTRED

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

Sheets and Views
Model

File details come from the government source that posted it. Updated .