Dail-Water-Stop-Tie-In-Model.pdf

PDF 295 KB Posted

Attached to
ROOFING AT ALLENDALE ELEMENTARY SCHOOL AND ROGERS BUILDING
Solicitation number
RFP MNA 260000002642 1
Issued by
Wayne County, Michigan

About this file

This is a technical model document related to water infrastructure, specifically addressing water stop tie-in procedures. The document appears to be a reference guide or specification sheet for a water utility project, likely prepared for use by a municipality or water district managing water line installations or repairs. The document outlines the standard configuration and installation methodology for connecting water stops to existing water distribution systems, providing detailed specifications for materials, dimensions, and installation procedures that contractors must follow when performing tie-in work.

The document serves as a standard template or best practice guide for ensuring consistency and compliance across water infrastructure projects within the jurisdiction. It includes technical specifications for components such as connection fittings, valve placements, and operational requirements to maintain system integrity and water quality standards. This type of model document is typically used in bid packages and contract requirements to communicate expectations to potential contractors and ensure that all work performed meets established municipal or regional water utility standards.

View the file

Other files

File Type Posted
Project-Allendale Elementary Roofing Replacement.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Rogers Early Elementary- AOC.pdf PDF
Project-Rogers Early Elementary School Roofing Replacement.pdf PDF
Area-Divider-Model.pdf PDF
Light-Metal-Roof-Edge (1).pdf PDF
Project-Allendale Elementary Roofing Replacement.docx DOCX document
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT.docx DOCX document
MELNAP Schools Summer of 2027 Roofing Bid Form.doc DOC document
FAQs PW April 2025.pdf PDF
Prevailing Wage Rates.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders MELNAP Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Project-Rogers Early Elementary School Roofing Replacement.docx DOCX document
Allendale Elementary- AOC.pdf PDF
MELNAP Schools Summer of 2027 Roofing Scope of Work.docx DOCX document
Wood-Curb-Model.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 30A

NOTES

ASPHALTIC ROOFING SYSTEMS

DAILY WATERSTOP / TIE-IN

TIE-IN SHEET SET

MASTIC

SEAL EDGES WITH

AND COMPATIBLE

REINFORCING MESH

NEW ROOF SYSTEM

1. BEFORE NEXT DAY'S WORK, REMOVE TEMPORARY TIE-IN AND INSULATION FILLERS

2. EXTEND TIE-IN SHEET MINIMUM OF 6-INCHES ONTO BOTH SURFACES

EXISTING INSULATION

NEW INSULATION

IN COMPATIBLE MASTIC

EXISTING ROOF SYSTEM

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

Sheets and Views
Model

File details come from the government source that posted it. Updated .