Roof-Hatch-Model.pdf

PDF 126 KB Posted

Attached to
ROOFING AT ALLENDALE ELEMENTARY SCHOOL AND ROGERS BUILDING
Solicitation number
RFP MNA 260000002642 1
Issued by
Wayne County, Michigan

About this file

This is a technical drawing document for a built-up roofing (BUR) system specification. The drawing illustrates a hot/cold roof hatch assembly and details the layered construction methodology for roofing installation. The specification outlines a multi-ply roofing system incorporating a base sheet, BUR membrane, insulation layer, cant sheet, counterflashing, two-ply stripping, and gravel surfacing applied over an existing deck. The drawing is designated as Sheet 2023 and is presented at a not-to-scale (NTS) reference, providing contractors and construction teams with the technical requirements for roof hatch installation and the overall roofing system composition.

The document serves as a technical reference standard rather than a procurement document and does not contain information regarding pricing, timelines, bidding requirements, contract terms, funding sources, or award details. This drawing would typically be incorporated as part of a larger construction project specification or scope of work to communicate roofing material specifications and assembly requirements to bidders and construction contractors.

View the file

Other files

File Type Posted
Project-Allendale Elementary Roofing Replacement.docx DOCX document
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT.docx DOCX document
Project-Allendale Elementary Roofing Replacement.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Rogers Early Elementary- AOC.pdf PDF
Project-Rogers Early Elementary School Roofing Replacement.pdf PDF
Area-Divider-Model.pdf PDF
Light-Metal-Roof-Edge (1).pdf PDF
Allendale Elementary- AOC.pdf PDF
MELNAP Schools Summer of 2027 Roofing Scope of Work.docx DOCX document
Wood-Curb-Model.pdf PDF
MELNAP Schools Summer of 2027 Roofing Bid Form.doc DOC document
FAQs PW April 2025.pdf PDF
Prevailing Wage Rates.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders MELNAP Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Project-Rogers Early Elementary School Roofing Replacement.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 25

BUILT UP ROOFING

HOT/COLD ROOF HATCH

TWO-PLY STRIPPING

GRAVEL SURFACING

SPECIFED EXISTING DECK

SPECIFIED INSULATION

SPECIFIED BUR MEMBRANE

4'' MIN.

SPECIFIED BASE SHEET

SPECIFIED COUNTERFLASHING

SPECIFIED CANT

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

Sheets and Views
Model

File details come from the government source that posted it. Updated .