This is a Scope of Work document for roofing services required by MELNAP Schools for the summer of 2027. The project encompasses comprehensive roofing work across multiple school facilities within the MELNAP consortium. The scope includes roof inspection, repair, replacement, and maintenance services for existing roofing systems. Specific deliverables involve assessment of current roof conditions, identification of repair versus replacement needs, and execution of all necessary roofing work to bring systems to acceptable operational standards. The project is scheduled for completion during the summer 2027 timeframe to minimize disruption to school operations during the academic year. Bidders are expected to provide detailed project timelines, resource allocation plans, and quality assurance procedures as part of their proposals.
The pricing structure requires bidders to submit comprehensive cost estimates covering all labor, materials, equipment, and contingency costs associated with the roofing work. Detailed breakdowns by facility, by type of work (repair versus replacement), and by material specification are expected to support transparent cost evaluation. The contract will be awarded to the qualified bidder offering the best value to MELNAP Schools, with consideration given to technical capability, past performance, and pricing competitiveness. The awarded contractor will be responsible for all aspects of project management, including scheduling coordination with school facilities, safety compliance, and final inspection and acceptance by the district. Any warranty requirements and post-completion maintenance obligations should be clearly specified in the contractor's proposal.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THERMastic 80 Built Up Replacement Scope of Work Rogers Early Elementary School Roofs 1, 2, and 3
1. Remove existing roofing and insulation down to structural deck.
2. Replace damaged decking on a cost unit basis.
3. Replace damaged wood nailers on a unit cost basis.
4. Mechanically attach BURmastic Composite Ply base sheet to gypsum decking.
5. Adhere flat and tapered insulation systems (1/8”) at R-20 average in Premium III asphalt at 30 lbs/ sq.
6. Install 1/4” Tremboard AC adhered in Premium III asphalt at 30lbs/sq.
7. Install new 4 lb lead drain flashing with gravel stop and 4 lb lead flashing at all soil stacks.
8. Install new specified expansion joint at indicated location.
9. Install Burmastic Comp Ply HT base sheet adhered in Premium III asphalt at a rate of 25lbs/sq.
10. Install 3 plies Thermglass Type IV felt with Premium III asphalt interply at rate of 25lbs per sq.
11. Install TRA Elastomeric flashings adhered in Thermastic 80 at rate of 30lbs/sq.
12. Bar terminate top of flashings and tie into existing metal roofing.
13. Strip-in Vertical laps with ELS and 6” BURmesh.
14. Apply Alumanation 301 at 2.5 gals per sq (40 wet mils) to all flashings and drains.
15. Install Thermastic 80 flood coat at 60 lb/ sq and gravel at rate of 400 lb/sq.
16. Install new metal pitch pockets with hoods. Fill with grout and Tremseal Pitch Pocket sealer.
17. Install new 24-gauge kynar coated steel/ aluminum counter flashings and flashings to match existing.
18. Install new 24-gauge kynar coated steel/ aluminum coping caps to match existing.
19. Provide manufacturer’s 20-year Quality Assurance warranty that includes inspections during years 2, 5, 10 and 15. Inspections shall include online report of findings and recommended maintenance.
· All prevailing wage requirements for the State of Michigan are to be met by the contractor.
BURmastic 200 Built Up Replacement Replacement Scope of Work Allendale Elementary School Roofs 1-10
1. Remove existing roofing and insulation down to structural deck.
2. Replace damaged decking on a unit cost basis.
3. Replace damaged wood nailers on a unit cost basis.
4. Mechanically attach BURmastic Composite Ply base sheet to cementitious wood fiber decking.
5. Mechanically attach first layer of insulation to metal decking. Adhere first layer over cementitious wood fiber decking and base sheet in Low Rise Foam Insulation Adhesive. Adhere all subsequent flat and tapered insulation systems (1/4”) at R-20 average in Low Rise Foam Insulation adhesive.
a. Ensure insulation, crickets, and saddles do not allow any ponding.
6. Adhere one layer of ¼” DensDeck in Low Rise Foam insulation adhesive.
7. Install new 4 lb lead drain flashing with gravel stop and 4 lb lead flashing at all soil stacks.
8. Install 3 plies of BURmastic Composite Ply HT in BURmastic adhesive at a rate of 3 gals per square.
9. Install fully adhered TRA Elastomeric flashings adhered in sheeting bond. On flashings over 12” install a termination every 24” inches and 5 course in 6” BURmesh and BURmastic Adhesive MC.
10. Bar terminate top of flashings.
11. Strip-in Vertical laps with BURmastic Adhesive MC and 6” BURmesh.
12. Install BURmastic flood coat at 5 gal per square and gravel at rate of 400 lb/square.
13. Apply Alumanation 301 at 2.5 gals per square to all flashings and drains.
14. Install safety Tremtred Walkways around all units, entrances, and from access points.
15. Install new 24-gauge kynar coated aluminum copings.
16. Install new 24-gauge kynar coated aluminum counter flashings at all flashing details.
17. Install coated metal pitch pockets with hoods. Fill with grout and pourable sealer.
18. Re-install all skylight guards and safety railing.
19. Provide manufacturer’s 20-year quality assurance warranty that includes inspections during years 2, 5, 10, and 15. Inspections shall include online report of findings and recommended maintenance.
· All prevailing wage requirements for the State of Michigan are to be met by the contractor.