SPECS - 20200724_ BLDG 34 PROJECT MANUAL 100.pdf

PDF 9 MB Posted

Attached to
Renovate Building #34 to Correct FCA Deficiencies
Solicitation number
36C24921R0010
Issued by

About this file

This federal solicitation is for renovations to Building 34 at the James H. Quillen VA Medical Center in Johnson City, Tennessee to correct deficiencies. The solicitation seeks general construction including alterations, site work, and demolition. It also requires electrical and mechanical construction work. The solicitation includes seven deductive alternates that remove or reduce aspects of the project scope. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the issuing agency. Responses are due by the date and time specified in the solicitation. The successful contractor will be awarded a firm fixed-price construction contract to complete the project.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
Advon RFIs response.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
01-29-21 Reno Bldg. 34 - RFI 79-87_Responded.pdf PDF
423-926.1171.Arch-Mtn_Home 2.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 71-75 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

RENOVATE BUILDING 34 TO CORRECT FCA DEFICIENCIES

JAMES H. QUILLEN VA MEDICAL CENTER

JOHNSON CITY, TENNESSEE (MOUNTAIN HOME)

621-18-102

100 Percent Contract Documents Submittal

Architect’s Project Number: 13043.19002 Date: June 29, 2020

Renovate Building 34 to Correct FCA Deficiencies 04-20

James H. Quillen VA Medical Center

Johnson City, Tennessee (Mountain Home)

Submittal Date: June 29, 2020

VA Project Number: 621-18-102

00 01 10 - 1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

SECTION 00 01 10

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 03-20

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03-20

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-20

01 42 19 Reference Standards 09-19

01 45 00 Quality Control 03-19

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 03-19

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 08-16

02 41 00 Demolition 08-17

02 82 11 Removal and Disposal of Asbestos-Containing Materials 04-19

02 83 33.13 Lead-Based Paint 08-16

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 07-19

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 21 00 Steel Joist Framing 11-18

05 31 00 Steel Decking

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

Johnson City, Tennessee (Mountain Home)

00 01 10 - 2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 02-16

07 22 00 Roof and Deck Insulation 02-16

07 31 13 Asphalt Shingles 02-16

07 31 26 Slate Shingles 02-16

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16

07 60 00 Flashing and Sheet Metal 07-14

07 72 00 Roof Accessories 10-15

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 41 13 Aluminum-Framed Entrances and Storefronts 08-16

08 71 00 Door Hardware 04-20

08 80 00 Glazing 10-15

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 65 13 Resilient Base and Accessories 02-16

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15

10 44 13 Fire Extinguisher Mounting Brackets 08-18

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression Systems 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 13 16 Dry-Pipe Sprinkler Systems 01-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 11-19

Johnson City, Tennessee (Mountain Home)

00 01 10 - 3

DIVISION 22 – PLUMBING (CONT’D)

22 13 00 Facility Sanitary and Vent Piping 09-15

22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 02-20 23 21 13.01 Hydronic Piping (PEX)

23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 02-20

23 25 00 HVAC Water Treatment 02-20

23 73 00 Indoor Central-Station Air-Handling Units 03-20

23 81 00 Decentralized Unitary HVAC Equipment 03-20

23 82 00 Convection Heating and Cooling Units 03-20

23 82 16 Air Coils 03-20

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 24 13 Distribution Switchboards 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

26 56 00 Exterior Lighting 01-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 00 Fire Detection and Alarm 10-11

- - - END - - -

Renovate Building 34 to Correct FCA Deficiencies 03-20

Johnson City, Tennessee (Mountain Home) i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 LAYOUT OF WORK

1.13 AS-BUILT DRAWINGS

1.14 WARRANTY MANAGEMENT

1.15 USE OF ROADWAYS

1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.17 TEMPORARY USE OF EXISTING ELEVATORS

1.18 TEMPORARY TOILETS

1.19 AVAILABILITY AND USE OF UTILITY SERVICES

1.20 NEW TELEPHONE EQUIPMENT

1.21 TESTS

1.22 INSTRUCTIONS

1.23 GOVERNMENT-FURNISHED PROPERTY

1.24 RELOCATED EQUIPMENT

1.25 CONSTRUCTION SIGN

1.26 SAFETY SIGN

1.27 PHOTOGRAPHIC DOCUMENTATION

1.28 FINAL ELEVATION DIGITAL IMAGES

1.29 HISTORIC PRESERVATION

Johnson City, Tennessee (Mountain Home)

01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

A. Refer to Section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform Work for Project 621-18-102.

B. Renovate Building 34 to correct FCA deficiencies as required by

Drawings and Specifications.

C. Visits to the site by Bidders may be made only by appointment with the

Medical Center Engineering Officer.

D. Offices of Atriax LLC, as Architect-Engineers, will render certain technical Services during construction. Such Services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly-authorized representative.

E. Before placement and installation of Work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the Contracting Officer’s Representative (COR) in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than 3 work days unless otherwise designated by the COR.

F. All employees of General Contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by Project and employer, and restricted from unauthorized access.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 2

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.

B. ITEM II, ELECTRICAL WORK: Includes all labor, material, equipment and supervision to perform the required electrical construction work on this Project.

C. ITEM III, MECHANICAL WORK: Includes all labor, material, equipment and supervision to perform the required mechanical construction work on this Project.

D. DEDUCT ALTERNATE 1: Install temporary hydronic unit heaters and piping in the museum space in lieu of the central station air handlers in the attic space. Reference Mechanical Drawings for details.

E. DEDUCT ALTERNATE 2: Reduce the Project DDC system to the mechanical room. Reference Mechanical Drawings for details.

F. DEDUCT ALTERNATE 3: Remove the Following Panels: D-34B-0-C, D-34B-1-B, D-34B-1-C, and D-34B-1-D. Reference Electrical Drawings for details.

G. DEDUCT ALTERNATE 4: Remove roof patch and repair work shown on

Sheet 34-A-102 and associated details.

H. DEDUCT ALTERNATE 5: Remove floor slab infill as noted in Note 1 on

Sheet 34-A-106.

I. DEDUCT ALTERNATE 6: Remove demolition of existing ramp and associated sitework noted in Drawing set.

J. DEDUCT ALTERNATE 7: Remove plumbing scope as noted in Drawing set.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and Contract Documents may be obtained from the website where the Solicitation is posted. Additional copies shall be at Contractor's expense.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 3

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The Security Plan defines both physical and administrative security procedures that will remain effective for the entire duration of the

Project.

2. The General Contractor is responsible for assuring that all subcontractors working on the Project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the Project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the Project site.

2. Before starting Work, the General Contractor shall give 1 week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this

Section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the Project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards:

1. The General Contractor shall provide unarmed guards at the Project site after construction hours.

2. The Contractor shall provide the guards and VA police with communication devices as directed.

3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 4

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of Project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE, and coordinate.

E. Document Control:

1. Before starting any Work, the General Contractor/subcontractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information.”

2. The General Contractor is responsible for safekeeping of all

Drawings, Project Manual and other Project information. This information shall be shared only with those with a specific need to accomplish the Project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified.”

Secure such information in separate containers and limit the access to only those who will need it for the Project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the Project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as compact discs and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information.”

Johnson City, Tennessee (Mountain Home)

01 00 00 - 5

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all Project Drawings, both scanned and electronic, shall be performed and tracked through the EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions:

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number (2 to 5) of permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer, and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the Work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 6

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute Work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel and Contractor's personnel, except as permitted by COR.

1. Do not store materials and equipment in other-than-assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than 2 work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing: The Medical Center must maintain its operation 24 hours a day, 7 days a week. Therefore, any interruption in service must be

Johnson City, Tennessee (Mountain Home)

01 00 00 - 7 scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

1. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR 2 weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.

H. Building 34 will be vacated by the Government beginning immediately after date of receipt of Notice to Proceed and turned over to

Contractor.

I. Construction Fence: Before construction operations begin, Contractor shall provide a chain-link construction fence, 7 feet minimum height, around the construction area determined by COR. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum

15 inches. Bottom of fences shall extend to 1 inch above grade. Remove the fence when directed by COR.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 40 degrees F at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of

Johnson City, Tennessee (Mountain Home)

01 00 00 - 8 site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to Specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS; 27 05 11, REQUIREMENTS

FOR COMMUNICATIONS INSTALLATIONS; and 28 05 00, COMMON WORK RESULTS

FOR ELECTRONIC SAFETY AND SECURITY, for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 9

5. In case of a Contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction

Project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least 1 lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the Work for this Contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

O. Prime Contractor shall coordinate with subs for all Work in the

Documents and Specifications. All Work shown in the Documents shall be furnished and installed as a complete system and in operating manner.

No additional costs will be incurred by the VA for interference, Johnson City, Tennessee (Mountain Home)

01 00 00 - 10 rework, additional work, phasing or coordination due to lack of coordination by the Prime Contractor.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of building areas of which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by Drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between Drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by Drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with Specifications which will be furnished by Government.

Provided the Contract Work is changed by reason of this Subparagraph B, the Contract shall be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing of resilient flooring, doors, windows, walls

Johnson City, Tennessee (Mountain Home)

01 00 00 - 11 and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures and will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing Work of this Contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed, they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which shall remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 12

3. Items of portable equipment and furnishings located in rooms and spaces in which work shall be done under this Contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by Drawings and Specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the

Environmental Protection Agency (EPA) and the Department of

Transportation (DOT) as outlined in Code of Federal Regulation

(CFR), Titled 40 and 49 respectively. The EPA's Toxic Substance

Control Act (TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste

Manifest (EPA Form 8700-22), along with the Uniform Hazardous Waste

Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the Contract file and transmit the Manifest to the Medical Center's Chief.

a. Copies of the following listed CFR titles may be obtained from the Government Printing Office:

40 CFR 261........Identification and Listing of Hazardous Waste

40 CFR 262........Standards Applicable to Generators of Hazardous

Waste

40 CFR 263........Standards Applicable to Transporters of

Hazardous Waste

40 CFR 761........PCB Manufacturing, Processing, Distribution in

Commerce, and Use Prohibitions

49 CFR 172........Hazardous Material Tables and Hazardous

Material Communications Regulations

Johnson City, Tennessee (Mountain Home)

01 00 00 - 13

49 CFR 173........Shippers - General Requirements for Shipments and Packaging

49 CRR 173........Subpart A General

49 CFR 173........Subpart B Preparation of Hazardous Material for

Transportation

49 CFR 173........Subpart J Other Regulated Material; Definitions and Preparation

TSCA..............Compliance Program Policy Nos. 6-PCB-6 and

6-PCB-7

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which shall not be removed and which do not unreasonably interfere with the Work required under this Contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during Contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this Contract or failure to exercise reasonable care in performing the Work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

Johnson City, Tennessee (Mountain Home)

01 00 00 - 14

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles "Alterations," "Restoration," and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of Contract, deliver Work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on Drawings or locations of which are unknown will be covered by adjustment to

Contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 PHYSICAL DATA

A. Before the Contractor begins work he shall record any existing system information such as temperature, flow rate, pressure, current, voltage, Johnson City, Tennessee (Mountain Home)

01 00 00 - 15 or any other information necessary for him to return the affected system to original operating condition. Unless noted otherwise it is assumed that all systems (HVAC, electrical, plumbing, etc.) are working properly in every manner at the beginning of the Project. The

Contractor’s recorded measurements must be submitted to the Project

Engineer for review and acceptance before any demolition or other related work can proceed.

1.12 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government-established baselines and benchmarks, indicated on the Drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the Work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark elevations established for each structure in accordance with lines and elevations shown on Contract Drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, walls, center lines of columns in both directions, major utilities and elevations of floor slabs.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 16

D. Whenever changes from Contract Drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

E. The Contractor shall perform the surveying and layout work of this and other Articles and Specifications in accordance with the provisions of

Article "Professional Surveying Services."

1.13 AS-BUILT DRAWINGS

A. The Contractor shall maintain 2 full-size sets of As-Built Drawings which will be kept current during construction of the Project, to include all Contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the

Contract Drawings. To ensure compliance, As-Built Drawings shall be made available for the COR's review, as often as requested.

C. Contractor shall deliver 2 approved, completed sets of As-Built

Drawings in the electronic version (scanned PDF) to the COR within

15 calendar days after each completed phase and after the acceptance of the Project by the COR.

D. Paragraphs A, B, and C shall also apply to all Shop Drawings.

1.14 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a Warranty Management Plan which contains information relevant to FAR 52.246-21, “Warranty of

Construction.” At least 30 days before the planned pre-warranty conference, submit 4 sets of the Warranty Management Plan. Include within the Warranty Management Plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The Plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this Contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior

Johnson City, Tennessee (Mountain Home)

01 00 00 - 17 to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the Work. The construction warranty period will begin on the date of the Project acceptance and continue for the product warranty period. A joint

4-month and 9-month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer.

Include in the Warranty Management Plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest Project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers, and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Names, addresses and phone numbers of sources of spare parts.

f. Warranties and terms of warranty. Include 1-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

g. Starting point and duration of warranty period.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 18

h. Summary of maintenance procedures required to continue the warranty in force.

i. Cross-reference to specific pertinent Operation and Maintenance Manuals.

j. Organizations, names and phone numbers of persons to call for warranty service.

k. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4- and 9-month post-construction warranty inspections conducted by the Government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance Bond: The Performance Bond must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the

Contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 19

C. Pre-Warranty Conference: Prior to Contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this Section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contact shall be located within the local service area of the warranted construction, be continuously available, and be responsive to Government inquiry on warranty work action and status.

This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the 3 categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back-charge the construction warranty payment item established.

1. First Priority Code 1: Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours, and work continuously to completion or relief.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 20

2. Second Priority Code 2: Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours, and work continuously to completion or relief.

3. Third Priority Code 3: All other work shall be initiated within 3 work days, and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

Code 1-Life Safety Systems

a. Fire suppression systems.

b. Fire alarm system(s).

Code 1-Air Conditioning Systems

a. Air conditioning leak in part of the building, if causing damage.

b. Air conditioning system not cooling properly.

Code 1-Doors

a. Overhead doors not operational, causing a security, fire, or safety problem.

b. Interior or exterior personnel doors or hardware not functioning properly, causing security, fire, or safety problem.

Code 3-Doors

a. Overhead doors not operational.

b. Interior/exterior personnel doors or hardware not functioning properly.

Code 1-Electrical

a. Power failure (entire area or any building operational after 1600 hours).

b. Security lights.

c. Smoke detectors.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 21

Code 2-Electrical

a. Power failure (no power to a room or part of building).

b. Receptacles and lights not operational (in a room or part of building).

Code 3-Electrical

a. Exterior lights not operational.

Code 1-Gas

a. Leaks and pipeline breaks.

Code 1-Heat

a. Power failure affecting heat.

Code 1-Plumbing

a. Hot-water heater failure.

b. Leaking water supply pipes.

Code 2-Plumbing

a. Flush valves not operating properly.

b. Fixture drain, supply line or any water pipe leaking.

c. Toilet leaking at base.

Code 3-Plumbing

a. Leaky faucets.

Code 3-Interior

a. Floors damaged.

b. Paint chipping or peeling.

c. Casework damaged.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 22

Code 1-Roof Leaks

a. Damage to property is occurring.

Code 2-Water (Exterior)

a. No water to facility.

Code 2-Water (Hot)

a. No hot water in portion of building listed.

Code 3

a. All work not listed above.

E. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil- and water-resistant tag approved by the

Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit 2 record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the Project is accepted for beneficial occupancy. Show the following information on the tag:

Johnson City, Tennessee (Mountain Home)

01 00 00 - 23

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of Contract Work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this Contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.

C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.

1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the Drawings and Specifications to prevent damage to the equipment and the electrical systems, i.e., transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall

Johnson City, Tennessee (Mountain Home)

01 00 00 - 24 be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection, including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This Paragraph shall not reduce the requirements of the Mechanical and

Electrical Specifications Sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired or replaced by the Contractor at the Contractor’s expense.

Johnson City, Tennessee (Mountain Home)

01 00 00 - 25

1.17 TEMPORARY USE OF EXISTING ELEVATORS

A. Contractor will not be allowed the use of existing elevators.

Outside-type hoist shall be used by Contractor for transporting materials and equipment.

1.18 TEMPORARY TOILETS

A. Provide where directed (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith shall be removed prior to completion of Contract, and premises left perfectly clean.

1.19 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the Contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the Work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair/restore the infrastructure as required.

C. Contractor shall install meters at Contractor's…