RFI 002 - 210120 (GLMV Comments) (002).pdf
PDF 2 MB Posted
- Solicitation number
- 36C24921R0010
About this file
This document contains a series of requests for information (RFIs) and responses related to a solicitation for renovations to Building 34 at a Veterans Affairs medical center. Key details include the solicitation number, a description of the project to renovate the building and correct facility condition deficiencies, the agency issuing the solicitation as the VA Veterans Health Administration VISN 9, and various questions from a contractor regarding demolition plans, structural elements, specifications, schedules, and other project requirements. Dates listed include the RFI response due date and a bid deadline of February 17, 2021. The RFIs and responses provide additional lower-level details to help contractors prepare their bids for the renovations.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C24921R0010
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
002 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Spec 01 00 00 1.27 requires photographic documentation. Is this actually required or is it a standard spec that was not removed?
Zoe Typewritten Text Amend photo requirement to have the site superintendent take pictures of job site daily of the main features of work being accomplished that day and attach to the daily log.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
003 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text 01 00 00 1.27 if photo documentation is required, is it only the weekly/monthly progress photos catalogued on a cloud based system, with all photos pinned to the locations they were taken, or does it include live camera feeds with cloud based links for all stakeholders to view?
Zoe
Amend photo requirement to have the site superintendent take pictures of job site daily of the main features of work being accomplished that day and attach to the daily log.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
004 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text 01 35 26 1.7 requires a full time employee hired by the GC to be onsite at all times as the SSHO. Can the SSHO fill the role as the superintendent as well?
Zoe Typewritten Text Answered in previous RFI's
Zoe Typewritten Text Hope Pittman, Atraix
Zoe
2/9/21
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
005 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text 01 45 00 3.4.B appears to allow the CQCM to also fulfill the role as Superintendent. Can the Superintendent fulfill the role as all three, the super, the CQCM and the SSHO or will two separate full time employees be required onsite hired by the GC?
Zoe
Answered in previous RFI's
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
006 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text 02 82 11 includes an Appendix A - Asbestos Summary Results, however, this summary does not provide a plan showing the location of the samples. Please provide a plan identifying the locations of all samples.
Zoe
Answered in previous RFIs
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
007 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text 02 83 33.13 describes the procedures when lead paint is encountered, however, it does not appear the plans or specs identify any quantities or locations of lead paint. Please provide quantities and locations of lead paint to be abated.
Zoe
Answered in previous RFI's
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
007 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
Electronic (email) copies of the proposal and bid bond are due February 17, 2021 at 4pm CT. A hard copy of the Bid Bond is due by February 24th 4:00 pm CT mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text At the site visit there were discussions regarding the submission required for the proposal. The CO prefers a hard copy of the bid bond but will allow a digital submission of the proposal. To remove the problems associated with sending the proposals the day before the actual bid deadline to allow shipping time, STI proposes the following:
- the hard copy of the bid bond be sent in one week prior to the bid deadline to ensure the CO receives all bid bonds.
- The actual proposal can be submittal digitally at the time of the deadline.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
008 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
The full list of activities included with the Project Schedule.
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text RFP Sub Factor 2a says to include a narrative and Gantt chart. Please clarify if this narrative is the full list of activities included with the Project Schedule (or the Gantt Chart) or if it is a written description of work in addition to the Project Schedule (or Gantt Chart).
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
009 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text RFP Sub-Factor 2a says to provide a list of all subcontractors that will be involved in accomplishing this project. It is not typical that subcontractors are selected pre-bid. Can this list of subcontractors be furnished after award by the GOV and once the GC has reviewed and awarded all contracts to the subs?
Zoe
This factor is not requiring the contract to identify key personnel as in “Sub-Factor 1b – Key Personnel.” This factor is an attempt to gauge the contractor’s understanding of the project intent and what trades would be involved in subcontracting.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
010 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet FX-001 Appears to show new and existing underground fire suppression piping. However, the fixates shown as existing such as the hydrants flanking the Bldg 34 front entrance do not appear to exist onsite. Please clarify the work required for underground fire suppression.
Is all fire suppression existing to remain or is there new underground fire suppression shown on sheet FX-001?
Zoe Typewritten Text see RFI 48
Zoe Typewritten Text Hope Pittman, Atriax
Zoe
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
011 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text AD demo sheets all have a General Note #4 call for any asbestos on block walls disturbed during demo to be abated. What asbestos on block walls is this note referring to?
Zoe Typewritten Text It is a common occurrence to apply a block wall filler to CMU to fill pores prior to final paint. Block wall filler (thin layer) has been known to contain asbestos and has been tested on in this building to contain asbestos.
Zoe Typewritten Text JG, Terracon; Hope Pittman, Atriax
Zoe
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
012 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AD-102 sheet note #11 is shown on the A/AD-102 Second Floor Attic Demo Plan appearing to point to new opening in masonry wall. However, the Sheet keynotes legend is blank at #11. Please provide the note for #11.
Zoe Typewritten Text Answered in previous RFIs and drawing
Zoe Typewritten Text Hope Pittman, Atriax
Zoe
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
013 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AD-102 sheet note #4 is shown on the B/AD-102 Roof Demo Plan appearing to point to gutter or flashing. However, the Sheet keynotes legend is blank at #4. Please provide the note for #4.
Zoe Typewritten Text Answered in previous RFI and drawings
Zoe Typewritten Text Hope Pittman, Atraix
Zoe
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
014 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AD-102 Keynote #1 calls out existing gutter to remain. In the same note it says to Repair/replace to allow proper drainage. This note is contradictory in stating existing to remain and repair and replace and cannot be bid. Without providing an assumed quantity to be replaced there is no accurate way for all GC’s to bid apples to apples. May I recommend providing all GC’s an assumed quantity for an allowance with a unit price to patch/repair so any difference in quantity can be handled appropriately post-award.
kyle.wilkerson Text Box The intent is to keep as much of the existing gutters as possible and adjust to allow for proper drainage.
Price to replace approximately 15 (25’) downspouts. Price to replace approximately 650 LF of gutters. Unit pricing is not accepted. Aged copper color is not required for new gutters and downspouts.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
014 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AD-102 Sheet Keynote #15 calls for roof to be removed and replaced. However, this are appears to be restricted only to the area within the dotted line on B/AD-102. Please clarify if this note #15 applies to only this dotted area or this entire section of membrane roof?
kyle.wilkerson Text Box Dashed line indicates area of work specified by keynote.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
015 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AD105 Keynote #9 calls for the existing plaster ceilings to be patched/repaired as needed. What is the design intent for this patch/repair? Without providing an assumed quantity to be replaced there is no accurate way for all GC’s to bid apples to apples.
May I recommend providing all GC’s an assumed quantity for an allowance with a unit price to patch/repair so any difference in quantity can be handled appropriately post-award.
kyle.wilkerson
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
016 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text The keynote #9 on sheet AD-105 is shown in the Foyer E101. Should it also apply to the adjacent rooms Intake E102 and E103?
kyle.wilkerson
Plaster in these areas were observed to be in fair condition and is not included in scope of work.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
017 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text The keynote #9 on sheet AD-105 is shown in the Foyer E101. Should it also apply to the Entrance E105 at the ramp to be removed?
kyle.wilkerson
Plaster work in this area is not included in scope of work.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
018 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text With the existing plaster ceilings denoted to be patched/repaired as needed, shall the existing plaster walls to remain also be patched/repaired as needed?
kyle.wilkerson
No, do not patch and repair walls to match existing finish.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
019 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text If plaster walls are to be patched/repaired, same question applies for the plaster ceilings regarding the allowance and unit price. May I recommend providing all GC’s an assumed quantity for an allowance with a unit price to patch/repair so any difference in quantity can be handled appropriately post-award.
kyle.wilkerson Text Box The intent of the scope of work is to prepare & stabilize the building for a future build out. Patch and repaired areas noted on the plans, that are a visible safety issue that include potential falling plaster ceilings are to be stabilized by removing the hanging sections that have visibly become detached from the lathe. Any new penetrations into the existing lathe and plaster are to be patched and repaired in the area of work.
Patch and repair of the unseen plaster ceiling is not included in the base bid.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
020 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AD105 Keynote #10 calls for the existing spiral stair up to the bell tower to be patched/repaired as needed. What is the design intent for this patch/repair? Does this refer to patching/welding cast iron on the stairs, or just patching/repairing the painted surface. This is an item requiring clear direction.
kyle.wilkerson
Keynote shall be updated to read as 'existing spiral staircase to remain'. Patch and repair reference to be removed.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
021 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AD-106 Keynote #8 in room Refrig E177 calls for the existing floor slab and structural supports to be removed in its entirety and prepped for new concrete infill. Please clarify; is this the area to receive the new metal joist and elevated conc slab as shown on S-101? If so, please provide information about the existing structure of the floor in room E177. Is it concrete slab supported by concrete beam with the concrete slab and beams to be demoed, or is it metal beams/joists?
kyle.wilkerson
The intent is to remove the steel structure on the ground floor including the brick catacomb style barrel vaulted ceiling. Revise keynote 8 on 34-AD-106 to read as, remove the steel structure on the ground floor and brick barrel vaulted ceiling first. Provide report to structural engineer noting the structural integrity of the integral concrete slab that remains. Provide in the base bid removal of the integral concrete slab and installation of new floor deck show on 34-S-101.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
022 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
023 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text The structural demo work associated with room Refrig E177 denoted by #8 on sheet AD-106 would be helpful if detailed with sections and details on the structural sheets. Otherwise the Contractor is merely guessing about demo work that could affect the structural integrity of the building.
kyle.wilkerson
See response to RFI 21
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
024 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text There does not appear to be any notes referring to the demo of the existing flooring materials on any of the demo sheets. Is the existing flooring to remain in all areas?
kyle.wilkerson
Answered in previous RFIs. Demo plans have been updated to reflect areas of finishes to be removed.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
025 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text In all of the rooms denoted as Walk-in Refrigerators, the floors are red tile. Does this tile remain or is it to be removed?
kyle.wilkerson
The red tile will be removed in its entirety.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
026 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Sheet AR-1 Lower Level Abatement Plan note #3 calls out TSI asbestos insulation that exists or may exist above the ceiling. With these quantities having not been identified, it must be assumed that all insulated piping above ceiling is ACM when the reality is likely to be that only a small quantity of insulation is ACM. Can an assumed quantity be provided for allowance/unit pricing?
kyle.wilkerson response is same as RFI 83 answered previously.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
027 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
Panic hardware (exit device) noted on door schedule to be based on Sargent MD860o series (concealed rod), 56 (remote latch retraction), ETL (electric strike) 626 finish, ET trim or equal for egress hardware as noted.
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text The door schedule on sheet A-601 lists panic devices in the notes of doors with P-Panic hardware, however, each of the hardware sets list only standard hardware. What panic hardware is this note referring to, and is the panic hardware in lieu of the standard locksets denoted in the hardware sets?
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
028 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text In room 208 on sheet A-102 there are two doors labelled 208B, the closet door 208B and the room entrance door 208B. Which is correct 208B and what is the door number for the other door?
kyle.wilkerson
Corridor door 208B is a new door that will be updated to 208. The closet door 208B is an existing door to remain. Door schedule and floor plan will reflect this update.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
029 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Please identify the location of 101A on the plans.
kyle.wilkerson
Door 101A is the south entry double doors to Foyer 101.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
030 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
Door #208 (as updated per RFI #28 response) is hardware set HW-3 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee
The door identified on the door schedule on sheet A-601 does not have a hardware set. Please identify this hardware set.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
031 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Note #11 on Roof Improvement Plan on Sheet A-102 appears to be pointing to locations of patching existing slate roofing. However, this sheet does not have note #11 in the Sheet keynotes legend. Please correct the notes.
Zoe Typewritten Text
SEE PREVIOUS RFI RESPONSES AND DRAWINGS
Zoe Typewritten Text
HOPE PITTMAN, ATRIAX
Zoe
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
032 01/20/21
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text Notes #2 and #3 on Roof Improvement Plan on Sheet A-102 appear to be flipped on the plan.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .