This document contains a request for information (RFI) from Valiant Construction regarding the solicitation for the renovation of Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee.

Valiant Construction submitted five questions to the contracting officer seeking clarification on the scope of work. The questions pertained to existing modular units and floor damage that were not indicated for removal or repair in the solicitation documents, areas of water damage that were not specified as being included, and whether exterior tuckpointing and refinishing of existing walls were required. The contracting officer provided responses confirming that the modular units should be removed, no work was required for the terrazzo flooring or vaulted ceilings, brick tuckpointing was only intended for building penetrations, and existing walls did not need to be refinished where walls were removed.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
Advon RFIs response.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
01-29-21 Reno Bldg. 34 - RFI 79-87_Responded.pdf PDF
423-926.1171.Arch-Mtn_Home 2.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
WD - TN20200111 01012021.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C24921R0010

PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.

When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Renovate Bldg. 34 to Correct FCA

Deficiencies

PROJECT LOCATION: James H. Quillen VA Medical

Center

P.O. Box 4000

Mt. Home, TN 37684

SUBMITTED BY: Valiant Construction City/State: Louisville, KY

PHONE NO.: 502-939-7871

TO: Dewayne L. Knowles

Dewayne.Knowles@va.gov

Diana K. Grube

Diana.Grube@va.gov

RFI NO.: 71-75 DATE:01-20-21 SPEC/DWG. REFERENCE:

REPLY NEEDED BY:

INFORMATION NEEDED:

71. In the West Part of Area B Room 110, There is existing Modular units containing MEP hookups, that seem partially disassembled; however they are not shown on the bidding documents to be removed. Can the VA confirm if they intend for the General Contractor to have these removed?

72. In Room 110 there is existing Floor Damage to the Terrazzo floor. Since there is no new Flooring scopes in the bidding documents, does the VA intend for the General Contractor to have this area repaired?

73. In Room 110, the existing vaulted wood ceiling shows several spots of water damage. Does the VA intend for the

General Contractor have this repaired in the base bid, or determine repairs needed in the required roofing survey?

73. Sheet 34-AD-102, North West Corner of Part A, shows a Keynote 17 Slate Tile repair to be conducted. During the site visit it was shown that the corner rafter at this location is significantly water damaged. Does the VA intend for the General Contractor to repair this in the base bid?

74. The Site Visit showed several areas where the exterior building could use tuck pointing. The Drawings doesn't indicate any areas of repair to be included in this bid, however; Specification section 04 01 00 under 1.1 says the section includes repointing and replacing of existing damaged areas. Can the VA confirm that this is only for any existing penetrations that will no longer be needed, rather than surveying the entire exterior surface of the building?

75. Specification Section 09 06 00, Page 11 Section 3.3 states, "Match adjoining or existing similar surface colors, textures or patterns where disturbed or damaged by alterations or new work when not scheduled." Since Rooms

108,140,144 and 147 are the ones listed on the Finish Schedule, can the VA confirm that once walls are removed as shown on bidding documents, we don't refinish the existing walls to match? Example room would be Room 104.

mailto:Dewayne.Knowles@va.gov mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov mailto:diana.grube@va.gov

REPLY:

71. Yes the VA would like these hookups removed.

72. No work to be done to terrazzo flooring. (GLMV)

73. Report extensive roof damage on required roofing survey. Existing vaulted wood ceilings are not to be repaired in this scope of work. (GLMV)

74. Brick tuck pointing is only intended for areas of building penetration being repaired. (GLMV)

75. Yes, where walls are removed, do not refinish existing walls to match. (GLMV)

REPLY COMPILED BY: HOPE PITTMAN DATE: 01/29/2021