This document contains a request for information (RFI) related to a solicitation to renovate Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee to correct facility condition assessment deficiencies. The RFI provides contact information for questions and a deadline of January 20, 2021 to submit any requests for clarification regarding specification section 01 45 00.3.2.B.1 and 01 45 00.3.2.B.1 in the solicitation. One question is submitted regarding whether the construction quality control (CQC) system manager reports to the project superintendent or serves in a dual role, to which the response clarifies that the CQC shall be separate from and report to the site superintendent.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C24921R0010
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE: SPEC/DWG. REFERENCE:
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
BIC 3 01/20/2021 SPEC 01 45 00.3.2.B.1 and 01 45 00.3.4.B
Spec section 01 45 00.3.2.B.1 indicates that we should "Include a CQC System Manager that reports to the Project Superintendent." However; spec section 01 45 00.3.4.B indicates that "The CQC System Manger is assigned as CQC System Manager but has duties as Project Superintendent in addition to quality control." Please clarify whether the CQC System Manager reports to the Project Superintendent or if they are in fact the same person.
Mark Hulsey/BIC Birmingham, AL
256-689-5008
The CQC shall be separate from and report to the site superintendent.